Loading...
HomeMy WebLinkAbout115 Route 28 - Detail Sheet 1 for Site Plan 2SYSTEM 187 GF IDP API 40 I- W W W Z 30 Q W S CJ 20 Q z p Q 10 I- O I- [7 28 �i CLEANOUT DETAIL: 'I' U C • IN � w COMPAF NT H-20 RATED FEMALE ADAPTOR & 2" THREADED PLUG it k O J FIRST FLOOR VARIES EL. 23.8-275± 00 j Q POURED CONCRETE DONUT I 1.5 CU.FT.± 26.5 BUILDING 1 Q 26 2.0"OSCH40 PVC p 90' ELECTICAL CONDUIT SWEEP CLEANOUT DETAIL: CONNECTION FROM BUILDING WITH CLEANOUT TO GRADE (TYP.) o O N a MANHOLE ( .),... u VENT FOR EACH BANK OF LATERALS. ., PITCH BACK TO SAS AT .005 FT./FT. MIN. Q Q FIN ISH ISH GRADE± 2 O OF SCH80 (GRAY) 4" PVC PIPE ^ O 0 V) SEE PAVEMENT SECTION 24 li 22 4 SCH4 AT 2% .•. y` PVC AT 17; 8" SDR35 AT 0.69. 20 21.8± --------------i r` SMH1 INV. 18 20.0 SMH3 •' 119.07 .INV. '� 18.54 INV. 17.50 0o INV. 17.94 M 16 16 SEWER LINE S PTIC TANK + HORIZONTAL, =1 VETO RTICAL + o a + 14 `* NOTE: SCHEMATIC SHOWN, SIMILAR CONFIGURATION BOTH SIDES OPERATION POINT: M AT 22.7' TDH 12 IROX. 3.0' >2.5' O.K. NETWORK SYSTEM CURVE WITH 4" TRANSPORT PIPE DATE: 9/24/03 2 PM DATE: 9/24/03 2 PM CA E: 9/24/03 2 PM 140 ORIFICES EVALUATOR: DANIEL A. OJALA PLS, SE EVALUATOR: DANIEL A. OJALA PLS, SE EVALUATOR: DANIEL A. OJALA PLS, SE WITNESS: AMY VON HONE, RS (BOH) WITNESS: AMI' VON HONE, RS (BOH) WITNESS: AMY VON HONE, RS (BOH) '.. EXCAVATOR: REID ELLIS, ELLIS BROS. CONST. EXCAVATOR: REID ELLIS, ELLIS BROS. CONST. E(CAVATOR: REID ELLIS, ELLIS BROS. CONST. DEPTH: ELEVATION: DEPTH: ELEVATION: DEPTH: ELEVATION: 0" 21.9 0" 22.0 0" 24.5 10 ALS 10YR3/2 FILL FILL - 6" MYERS 3WHV 3.0 BHP 28" 19.6 24" 20.0 B 6.0" IMP. DIAMETER B B LS IOYR6/8 LS 1OYR6/8 LS 10YR6/8 48" 17.9 60" 17.0 40" 21.2 0 0 BOTT. o PERC AT 52" 24 GAL C1 M/C SANTr FERO C1 M/C SAN PERC C1 M/C SAN <9" AT 5:10 <2 MIN/IN. 10YR5/6 AT 78" 10YR5/6 AT 72" 1OYR5/6 24 GAL. 24 GAL. 15% GRAVEL <9" AT 4:35 15% GRAVEL <9" AT 4:50 15% GRAVEL <2 MIN/IN. <2 MIN/IN. MANHOLE COVER SEE DETAIL 100 200 300 400 500 120" 1 11.9 144" 1 10.0 132" 1 1,; MORTAR ACOMPONENTS CAPACI I Y - GHM SYSTEM CURVE WITH PUMP CURVE FOR MYERS 3WHV 3BHP 6.0" IMP. PUMP 03-244 NO GROUNDWATER FOUND NO GROUNDWATER FOUND TEST HOLE LOGS NO GROUNDWATER FOUND / 24' LD. PRECAST CONC. RISER AS REQ. / 4'0 PRECAST DONUT 1" OVER FIELD �4" THICK 4000 PSI CONC. W/WH'F ARELD 18"0OBSERVATIONHOLEIN LEACHIN 12" PERF. HDPE / PUMP OUT WELL TO SAND AT BOTTOM L.F. INSPECTION PORT DETAIL r, '.I. VALVE BOX TO FINISH GRADE 7MEN OVIDE C.I. RING & COVER ARCOAL INSPECTION PORT SEE DETAIL LEBARON LA0910 OR EQ. OVER - 4" GATE VALVE SAWCUT & MATCH PAVEMENT WHERE REQ. LTER ON VENTS CLEANOUT TO GRADE TYPICAL WHERE INDICATEC TYPICAL SEE PAVEMENT SECTION AT ALL MAJOR BENDS & INTERSECTIONS VENT (CONNECT TO FIELD VENT) GATE VALVE SAWCUi &MATCH PA WHERE REQ. H-20 CAST IRON COVERS AND BOX FIRST FLOOR VARIES EL. 23.8-27.51 5' MIN FLOOR ELEV'S VARY / (5) GATE VALVES SEE SITE PLAN WITH COVERS To GRADE1 r, cr SEE DETAILS i ... •IPVC AT 2% 8" SDR35 & AT 0.6% & 2 CU 17.5 INV. 17.25 7.08 6"OSCH40 PVC S=2% MIN. 1 9,000 GAL P/C DUPLEX PUMPS SEE DETAILS 21,000 GAL ST "-X ` REINF. CONC. PAD UNDER TUNNEL MOLD MECHANICAL COMPACTION & 6" STONE (TYP.) 310 CMR 15.228(1) TANK TO MANL'F. SPECS. SEPTIC SYSTEIv SHORING OF EXCAVATION MAY BE REQUIRED. RESPONSIBILITY OF CONTRACTOR TO MAINTAIN PUBLIC AND BUILDING SAFETY NOT TO SCALE 16.9± ELEV. 17.0± V.I.F. 00 �Lo 0 X O w �i CLEANOUT DETAIL: 'I' U C • IN � w COMPAF NT H-20 RATED FEMALE ADAPTOR & 2" THREADED PLUG it k O J VALVE BOX TO SLEEVE TO ALLOW MOVEMENT GRADE AT EA. END. 7.08 6"OSCH40 PVC S=2% MIN. 1 9,000 GAL P/C DUPLEX PUMPS SEE DETAILS 21,000 GAL ST "-X ` REINF. CONC. PAD UNDER TUNNEL MOLD MECHANICAL COMPACTION & 6" STONE (TYP.) 310 CMR 15.228(1) TANK TO MANL'F. SPECS. SEPTIC SYSTEIv SHORING OF EXCAVATION MAY BE REQUIRED. RESPONSIBILITY OF CONTRACTOR TO MAINTAIN PUBLIC AND BUILDING SAFETY NOT TO SCALE 16.9± ELEV. 17.0± V.I.F. 00 �Lo 0 X O w ARNE H. OJALA CIVIL 30792 ISTf:% PAVED AREA �i CLEANOUT DETAIL: U C LeBARON CAST IRON LA0910 SEE PAVEMENT SECTION � w H-20 RATED FEMALE ADAPTOR & 2" THREADED PLUG it k O J VALVE BOX TO SLEEVE TO ALLOW MOVEMENT GRADE AT EA. END. 00 j Q POURED CONCRETE DONUT I 1.5 CU.FT.± Q 2.0"OSCH40 PVC p ARNE H. OJALA CIVIL 30792 ISTf:% PAVED AREA CLEANOUT DETAIL: LeBARON CAST IRON LA0910 SEE PAVEMENT SECTION r O H-20 RATED FEMALE ADAPTOR & 2" THREADED PLUG I VALVE BOX TO SLEEVE TO ALLOW MOVEMENT GRADE AT EA. END. 00 O POURED CONCRETE DONUT I 1.5 CU.FT.± Q 2.0"OSCH40 PVC p 90' ELECTICAL CONDUIT SWEEP CLEANOUT DETAIL: o O N a p u VENT FOR EACH BANK OF LATERALS. ., PITCH BACK TO SAS AT .005 FT./FT. MIN. Q Q CONSTRUCT VERTICAL SECTION Of 2 O OF SCH80 (GRAY) 4" PVC PIPE ^ O 0 V) ELEVATION VARIES: 23.5'± MAX. TO EL 25.0±' PROPOSED 9.0± \-INVERT OF LATERALS LEVEL AT EL. 21.67 BOTTOM OF REMOVAL TO ELEV. 17.0±. SEE LOGS, DEPTH MAY VARY WITH THE ORIGINAL GROUND SURFACE ELEVATION. ENGINEER In INSPECT Sn" REMOVAL REPLACE WITH CLEAN MEDIUM SAND 310CMR 15.255 (3). QUOTE ADDITIONAL MATERIAL AT COST PER CUBIC YARD IN CASE REQUIRED. 5' REMOVAL OF UNSUITABLE SOILS REQUIRED. REMOVE TO THE BOTTOM OF THE B LAYER SHOWN ON TEST HOLE LOGS. THE DEPTH OF FILL AND UNSUITABLE MATERIAL MAY VARY, ENGINEER TO INSPECT AND CERTIFY THE REMOVAL QUOTE ADDITIONAL REMOVE/REPLACE AT COST PER CUBIC YARD IN CASE REQUIRED. LEACHING FIELD PROVIDE INSECT SCREEN DETAIL EL 10 TH B 1 NO GROUNDWATER FOUND INSPECTION SCHEDULE: INSTALLER TO COORDINATE 24 HR. NOTICE REQUIRED. INSPECTIONS 1. OWNERS ENGINEER TO MSPECf.UNSUrtA9LE SOIL REMOVAL PRIOR TO THE PLACEMENT OF THE CLEAN SAND FILL. 2. OWNERS ENGINEER TO INSPECT WHEN CLEAN FILL HAS BEEN BROUGHT IN. BOTTOM OF LEACHING FIELD ELEVATION IS TO BE CERTIFIED PRIOR TO THE PLACEMENT OF THE DOUBLE WASHED STONE. 3. OWNERS ENGINEER TO INSPECT'.. THE DOUB�-E WASHED STONE TO ENSURE IT IS FREE OF DUST AND FINES. 4. ENGINEER TO INSPECT THE SHOP DRILLED ORIFICES TO ENSURE BURRS HAVE BEEN REMOVED FROM LATERALS. 5. ENGINEER TO INSPECT TANKS TO ENSURE WATERPROOF. 6. PROPER FUNCTIONING OF THE PUMPS, CON^nOLS AND ALARMS SHALL BE DEMONSTRATED BY CLEAN WATER TESTING PRIOR TO BACKFILL1% THE SAS FIELD. 7. AN AS -BUILT PLAN WITH INVERT ELEVATION'S AND FIELD LOCATION IS TO BE PREPARED FOR THE TOWN BY THE OWNERS ENGINEER. 8. ALL SITE WORK, INCLUDING CLEARING, GRUB_MG, GRAVEL BASE, PAVEMENT, DRAINAGE ETC. TO BE INSPECTED BY OWNERS ENGINEER. 9. ALL WATER WORK TO CONFORM TO YARVOUTH REGULATIONS AND SPECIFICATIONS- ALL WORK TO BE INSPECTED AND TESTED. uJ W b LU z co O CD z� o z Q w J } a m I- Q w ¢ SHEET 4 OF 7 03-244