Loading...
142 Swan Lake Road Proposed Septic DetailsPROFILE: TOP OF FOUNDATION NOT TO SCALE MANHOLES & COVERS AS REQUIRED (BRING TO W/1 6" FINISH GRADE) EXISTING I4" 1=16.17 EXISTING �AS 1=15.92 1500 GALLON PRECAST CONCRETE SEPTIC TANK TO BE PLACED ON FIRM BASE 5 OUTLET DIST. BOX 1-14.90 D -BOX TO BE WATER TESTED IF MORE THAN ONE OUTLET TO BE PLACED ON FIRM BASE NOTES: SEPTIC TANK TO BE PLACED A MINIMUM OFTEN FEET AWAY FROM THE FOUNDATION WALL. THE SOIL ABSORPTION SYSTEM COMPONENT SHALL BE PLACED A MINIMUM OF TWENTY FEET AWAY FROM THE FOUNDATION WALL SEPTIC SYSTEM NOTES: FIRST PIPE LENGTH 2" LAYER 1/8'-1/4" CLEAN TO BE SET LEVEL DOUBLE WASHED STONE FOR MIN. 2' OR FILTER FABRIC OBSERVATION(VENT PORT 7 II NOT REQUIRED 3.4 MAX. ` II (ppNM 1:lHUp.HHHUMpMMll o" 3/4"-1 1/2• CLEAN OUBLE WASHED STONE z141 FREE OF FINES & SILT BOTTOM EL= 0 6 HIGH CAPACITY INFILTRATORS VATH STONE IN A I 11' WIDE, 48' LONG 10" DEEP TRENCH FORMATION .n BOT. OF TEST HOLE.=7.9 1. THIS PLAN IS FOR THE DESIGN, PERMITTING AND CONSTRUCTION OF A SUBSURFACE SEWAGE DISPOSAL SYSTEM ONLY. PLEASE NOTE THAT THIS SYSTEM IS NOT DESIGNED FOR THE USE OF A GARBAGE GRINDER NOR DOES DECELLE-BURKE & ASSOCIATES RECOMMEND THE USE OF A GARBAGE GRINDER WITH A SEPTIC SYSTEM DUE TO THEIR RECOGNIZED ADVERSE IMPACTS TO THE SUBSURFACE ADSORPTION SYSTEM. 2. ALL CONSTRUCTION METHODS AND MATERIALS TO CONFORM THE MASSACHUSETTS D.E.P. TITLE 5 REGULATIONS AND LOCAL BOARD OF HEALTH REGULATIONS. ALL PIPING TO BE SCHEDULE 40 PVC UNLESS OTHERWISE SPECIFIED. 3. WITHIN LIMIT OF EXCAVATION, REMOVE ALL IMPERVIOUS MATERIAL INCLUDING THE 'A" & 'B' SOIL HORIZONS. 4. FILL MATERIAL REQUIRED TO REPLACE TOPSOIL, SUBSOIL OR ANY UNSUITABLE MATERIAL SHALL COMPLY WITH SECTION 310 CMR 15.255. INSTALLER IS RESPONSIBLE FOR HAVING A SIEVE ANALYSIS PERFORMED ON THE FILL MATERIAL AND PROVIDING A COPY OF THE RESULTS TO THIS OFFICE THE SOIL SHALL CONFORM TO THE FOLLOWING SIEVE ANALYSIS: 10% (MAX) BY WT. SHALL PASS No. 50 SIEVE <10% OF No. 4 SIEVE SHALL PASS No. 100 SIEVE <5% OF No. 4 SIEVE SHALL PASS No. 200 SIEVE UNIFORMITY COEFFICIENT ® No. 4 SIEVE </= 6.0. 5. SEPTIC TANK SHALL BE CONSTRUCTED OF REINFORCED CONCRETE WITH AT LEAST THREE (3) WATER TIGHT ACCESS MANHOLES, TWO OF WHICH ARE WITHIN 6' OF FINISHED GRADE SEPTIC TANK SHALL BE SET LEVEL ON A 6' STONE BASE. 6. DISTRIBUTION BOX SHALL BE CONSTRUCTED OF REINFORCED CONCRETE WITH A WATER TIGHT COVER. THE DISTRIBUTION BOX SHALL BE SET LEVEL ON A 6' STONE BASE 7. CAST IRON FRAMES AND COVERS SHAT. BE PROVIDED OVER ALL SEPTIC SYSTEM COMPONENTS WHEN LOCATED WITHIN A TRAFFIC AREA. 8. THE DESIGN IS INTENDED TO MEET TIRE V AND ANY LOCAL REGULATIONS. THIS IS NOT A GUARANTEE THAT THE SYSTEM WILL BE INSTALLED AS DESIGNED NOR DOES THIS PLAN GUARANTEE THE OPERATION OF THE SYSTEM. 9. TOPOGRAPHY SHOWN HEREON IS THE RESULT OF AN ON THE GROUND SURVEY BY DECELLE-BURKE & ASSOCIATES IN MAY 2012. THE DATUM IS NGVD29 AND A BENCHMARK IS LOCATED ON THE CONCRETE BOUND LOCATED NORTHWEST CORNER OF THE LOT. SEE PLAN. 11. UTILITIES SHOWN ARE APPROXIMATE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROPERLY LOCATING AND COORDINATING THE PROPOSED CONSTRUCTION ACTIVITY WITH DIG -SAFE, THE LAND OWNER AND THE UTILITY PURVEYORS. DIG -SAFE SHALL BE NOTIFIED 72 HOURS PRIOR TO ANY CONSTRUCTION ACTIVITY ON THE SITE AT 1-888-344-7233. THE ENGINEER DOES NOT GUARANTEE THBR ACCURACY OR THAT ALL UTILITIES AND SUBSURFACE STRUCTURES ARE SHOWN. THE CONTRACTOR IS RESPONSIBLE TO VERIFY LOCATIONS OF Al UTILITIES THAT MAY CROSS THE CONSTRUCTION ACTIVITY AND VERIFY LOCATIONS OF UTILITY CONNECTIONS INCLUDE) IN THE CONSTRUCTION PRIOR TO ANY UTILITY CONSTRUCTION. (II ME Iii 120" SOIL TEST PIT DATA: TEST PIT 1 TEST PIT 2 GRD. EL. 17.9 GRD. EL. 18.4 tL. wrry LOAMYSAND )TS IOYR411 LOAMYSAND ITS 10YR616 SAND INE SAND IOYR812 Ap, LOAMYSANO ROOTS IOYR41I 7" Bw, LOAMYSAND ROOTS IOYR616 26" C, SAND FINE SAND IOYR812 120"-1 BOT. OF EXCAVATION DESIGN CRITERIA: DESIGN FLOW: 4 BEDROOMS AT 110 G.P.B./D = 440 G.P.D. (NO GARBAGE DISPOSAL) REQUIRED SEPTIC TANK: 440 GPD x 200% = 880 GAL. SEPTIC TANK PROVIDED: = 1500 GAL. SIZE OF LEACHING FACILITY REQUIRED: DESIGN PERC. RATF- 5 MIN./ INCH LONG TERM APPL. RATE 0.74 G.P.D/S.F. 440 GPD / 0.74 GPD / SF = 595 S.F. SIZE OF LEACHING FACILITY PROVIDED: DATE: _04/25/12 TEST BY: SWEETSER ENGINEERING WITNESSED BY: A VON HONE YARMOUTH BOARD OF HEALTH PERC. RATE: <2 MIN./INCH LTAR - CLASS II SOIL - SANDY L.OAM 0.74 GPD / S.F. INDICATES �- ESTIMATED SEASONAL HIGH GROUND WATER INDICATES INDICATES PERC. TEST 0 OBSERVED GROUND WATER USE INFILTRATOR CHAMBERS IN A TRENCH FORMAT USE 1 TRENCH 48' LONG, 11' WIDE, 10" DEEP (48'x11') + ((48'+48'+11'+11')x(10"/12")) = 626 S.F. LEACHING AREA 626 S.F. > 595 S.F. CHECKS O.K. CAPACITY OF LEACHING FACILITY PROVIDED: 626 S.F x 0.74 GPD/S.F. = 463 GPD > 440 GPD CHECKS O.K. DeCELLE BURKE & Associates, Inc. 1266 Furnace Brook Pkwy., #401 Quincy, MA 02169 (617) 405-5100 (0) (617) 405-5101 (F) GENERAL NOTES: 1. LOCUS: ASSESSORS MAP 49 LOT 220 RECORD OWNER: THE IRM CORP. C/O MARK GORMAN 77 RUSSELL ROAD WELLESLEY, MA 02482 2. ROBERT PERRY, RE OF CAPE COD ENGINEERING, DEUNEATED THE WETLANDS FOR THIS LOT AND WERE FIELD LOCATED BY THIS OFFICE. TOPOGRAPHY AND PROPOSED HOUSE AND SEPTIC LOCATION SHOWN HEREON WAS COMPILED FROM THE SEPTIC DESIGN PLAN PREPARED BY SWEETSER ENGINEERING OF SOUTH DENNIS, MASSACHUSETTS DATED APRIL 26, 2012. DATUM AS REFERENCED IN THE SWEETSER PLAN IS NGVD-1929. 3. ALL CONSTRUCTION TO CONFORM TO YARMOUTH PUBUC WORKS AND MASS HIGHWAY STANDARDS. 4. EXISTING UTILITIES WHERE SHOWN IN THE DRAWINGS ARE APPROXIMATE THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROPERLY LOCATING AND COORDINATING THE PROPOSED CONSTRUCTION ACTIVITY WITH DIG -SAFE AND THE APPLICABLE UTILITY COMPANIES AND MAINTAINING THE EXISTING UTILITY SYSTEM M SERVICE DIG -SAFE SHALL BE NOTIFIED PER THE STATE OF MASSACHUSETTS STATUTE CHAPTER 82, SECTION 409 AT TEL 1-888-344-7233. THE ENGINEER DOES NOT GUARANTEE THEIR ACCURACY OR THAT ALL UTILITIES AND SUBSURFACE STRUCTURES ARE SHOWN. LOCATIONS AND El"ATKXRS OF UNDERGROUND UTILITIES WERE TAKEN FROM RECORD PLANS. THE CONTRACTOR SHALL VERIFY SIZE, LOCATION, AND INVERTS OF UTILITIES AND STRUCTURES AS REQUIRED PRIOR TO THE START OF CONSTRUCTION. 5. CONTRACTOR TO PAVE AND LOAM AND SEED ALL DISTURBED AREAS. AREAS TO BE STABILIZED PRIOR TO THE REMOVAL OF THE EROSION CONTROL BARRIER. 6. THE PROPERTY HAS A FLOOD ZONE AE OF MATION 12 AS SHOWN ON FIRM 25001CO587J DATED JULY 16, 2014. THE CORRESPONDING ELEVATION AS SHOWN ON THE PLAN IS 13.1 WHEN CONVERTING THE NGVD-29 PLAN DATUM TO THE FEMA DATUM OF NAVD-88. DEED REFERENCE: Samstable County Book 12608 Page 138 PROJECT TITLE & LOCATION: PROPOSED NOTICE OF INTENT PLAN 142 SWAN LAKE ROAD YARMOUTH, MA 02664 PLAN TITLE: PROPOSED SEPTIC DETAILS PREPARED FOR: WILLIAM MCDERMOTT 36 CANOE RIVER DRIVE MANSFIELD, MA 02048 DATE: MAY 22, 2012 REVISED: JUNE 7, 2012 - CERTIFICATION REVISED: OCTOBER 28, 2015 - FLOODPLAIN REVISION REVISED: JANUARY 6, 2016 - SEPTIC INFO INCLUSION JOB NUMBER: 150.010 1 SHEET 2 OF 2 SCALE: 1"=20'