HomeMy WebLinkAbout817 Route 28 Septic Upgrade (Phase II)NO GARBAGE DISPOSERS ALLOWED WITH THIS DESIGN
NOTES 14.46
1. DATUM NGVD TAKEN FROM T.O.Y. BENCHMARK TAG BOLT #202. // DES.�'GN A" 11 DESI GN B"
2. MUNICIPAL WATER IS AVAILABLE.
3. PIPE PITCH TO BE 1/4" PER FOOT. t
4. DESIGN LOADING FOR ALL PRECAST UNITS TO BE AASHO-H f0. f4.24 DES
DESIGN SEPTIC DESIGN
5. PIPE JOINTS TO BE MADE WATERTIGHT. �SE
G. CONSTRUCTION DETAILS TO BE IN ACCORDANCE MASS. DESIGN 1 LOIIS: DESIGN FLOWS:
14.18! [o {�[�
ENVIRONMENTAL CODE TITLE V. l UMTS 19+20: 2 BED. (> 10 GPD) = 220 GPD UNIT 14: f BED. (I 10 GPD) = 1 > 0 GPD
7. THIS PLAN FOR PROPOSED WORK ONLY AND NOT TO BE USED{4i J 13.75 UNIT ;f 8: 1 BED. (110 CPD) = 1 f 0 CPD UNIT 12: 2 BED. (220 GPD) = 220 CPD t
GAS LrNY TO Bs /{v ti t� UNIT 17: f BED. (I 10 CPD) = f 10 GPD UNIT 11: 1 BED. (f 10 CPD) = f t 0 CPD
FOR LOT LINE STAKING. a �EVZRGRE NS{`= .
RESERVE A llHdx {J {o UNITS li' +f 6: 2 BED. (110 CPD) = 220 GPD UNIT 10: 1 BED. (I 10 GPD) = 110 CPD
8. SCH 40-4" PVC TO BE USED THROUGHOUT SEPTIC SYSTEM. � RESERVE AREA is • {� �
9. OWNERS ENGINEER TO INSPECT AND CERTIFY ALL SITE WORK
PadnaD ,�b O's
77,
10. EXISTING CESSPOOLS TO BE PUMPED AND REMOVED. {" �, '� SEPTIC TANK DESIGN: SEPTIC TANK DESIGN:
11. D'BOX TO BE WATER TESTED FOR LEVELNESS. t° TANK 1: 220 CPD (1.5) = 330 GALLONS TANK 1: 220 GPD (1.5) = 330 GALLONS
58g� USE A 1000 GALLON SEPTIC TANK USE A 1000 GALLON SEPTIC TANK
12. CONTRACTOR TO VERIFY LOCATION OF ALL SITE CONSTRUCTION. 13.96 t4 �D� WANK 2: 110 GPD (1.5) = 165 GALLONS TANK 2: 330 GPD (1.5) = 495 GALLONS
UTILITIES PRIOR TO
fs' USE A 1000 GALLON SEPTIC TANK USE A 1000 GALLON SEPTIC TANK '
13. SEPTIC TANKS AND PUMP CHAMBERS TO BE )PATER PROOFED TANK 3: �30 GPD (1.5) = 495 GALLONS
WITH 6 MIL. OF MASTIC RATER PROOFING. / ` USE A.1600 GALLON SEPTIC TANK C
14.71
c� LEACHINf' DESIGN: LEACHING DESIGN:
TITLE V VARIANCE REQUEST. '{N O
�fA / BOTTOM 4REA: 377.1 S.F. 1.0) = 337.1 CPD BOTTOM AREA: 2(22.75x7) 1.0) 318.5 CPD
TITLE P PdRldNca REQUESTS: _ .` �1G {� ,;k 1� ftA3tP POST APPROXIMATE SIDES: 135 a.f. (.92') (2.55 = 310.5 GPD SIDES: 2(2(22.75+7)) (.92'� (2.5) 273.7 GPD !.
CAS LINE
- cMR 1s.os (7): sEPTTc TANK ro BE to' FROM CELLAR Z CAPTAIN
LOCATloN ds TOTAL r 461.3 S.F. 647.6 CPD TOTAL 428.0 S.F. 592.2 GPD
- WALL. IR 15-03 Q(7) sEP77AC TAANa TO BE (DESIGN to, FROM SSA 2�6" SIIIDCLIFF - LOCATED
Ic SAFE. USE (f) LEACHING TRENCH WITH 8 INFILTRATORS USE (2) INFILTRATOR LEACHING TRENCHES WITH
PROPERTY LINE. REQUEST A PARIANca of r FROM THE �� - / I - AND 2'.(F STONE ALL AROUND. - 3 INFILTRATORS PER TRENCH AND 2' OF STONE I
SIDE PROPERTY LINE. (DESIGN A) {� ALL AROUND.
POLE
- CMR 15.03 (7): LEACHING FACILITY TO BE 10' FROM
PROPERTY LINE. REQUEST A VARIANCE OF 3' FROM THE
FRONT PROPERTY LINE. (DESIGN B) "Uv t 11.81' Ii
RESERVE AREA REQUIRES A VARIANCE OF 8' FROM THE
SIDE PROPERTY LINE. (DESIGN A) - it_ - _ - O I PROP. 1000
BENCHMARK
TOP OF WATERGdTE
Ar ELaP. 12.er
93 INV rTANK
saPrrc SEITIC PROFILE (DaslcN B) j
/j 5 PROP. 1000 . 7
/OT 0 SCALE
CAL SEPTIC lN)
TANK TO BE
[ y N NY 2 USED AS A T.O.F. AT ELBE 12.1
PUMP CHAMBER FRAMES AND COVERS TO WITHIN f' OF GRADE
5 13.36
112.79 p
CEA)WLIN13.13 Sys/ t J $ �FEP g 1836 p o dL 12.3 ± SL. 12.3 ±
p INV. 1: l0.0± DB9
�ST AND'� "�. 4 INV. 2: f0.0±----LLLLLL��JJ OFF TO
/ ROPE FENCES �_� ! OPCO INV. 3: 10.1± I SEE SEPTIC DESIGN DBOX
•� : - p 11.1 ti INV. 4: f 0.1 ± CALCULATIONS FOR 1000 CAL
O { Vl INDIVIDUAL SEPTIC INLET dL 9.P5� I PUMP E" PRESSURE
it ® / W TANK SIZES. CHAMBER PIPE
TAI 1: 9.50 TANK f: 9.31
-CEI O /4' A 7Ylrx 2: 9.96 �- TANK 2: 9.71 12.91
NOfF SX:s.rvG-1./Ar�R I4 T
ROSE OF 13.03 5t. \ - ���.��� ' ✓./�'F DoE.o Nol'CcrtE • INV, 3
�. �. r r!try *o d�_ f
�\ SSARON��fr 8�4Gg �`�`� spprrG ' ��t' / DEPTH OF PLOT = 4' INLET TEE: PUMP CHAMBER 17TH ZOELLER
�. •J - ST7n_- INV. 4
ufo PROP. 1000 i rEE slzds.
CAL SEPTIC INLET = r0' - DEPTH = 10' 293 (1 HP) DUPLEX ALTERNATING
11�'�7Y3 A TANK j OUTLET = r9r HEIGHT = 6' PUMP SYSTEM (OR EQUAL) .
J 12.78 f 3.04 / �8�58 //.tit�� ti �4t1 n n //.elY - CESSPOOL
KEY
MAPLE REE .................. { r qb
EXIST. CONTOUR-g1SS1, r +4
WATER LINE W �O t\ y O
*- � . ` . � '� I - . INP. 3
CAS LINE
P
POWER LINE P-
n.-
SPOT ELEV. .... 12.18
EXIST. INVERT ......... INVERT 4 n„ 'o.
w �.3� t� `Sa\ �•
OP. MOO _. \
d I wn c aP e engineering., ering., inc.
91 _
CIVIL ENGINEERS
LAND SURVEYORS
Rte YARMO UTH, MA
'ETD � H ' f � , `"c ✓' ; ''•+,,
d .y f•c. cf `�r 1�•
�M :t¢
CJFLq I '
rdo :az 1 0JALA
! G x
ARN DATE
12.39
� k w
• •oma ; �
11.55
GAL SEPTIC
TAM
�_
12.84
jO
1/pi0
! PRO
O GAL'
TAN
BUILDING ZONE: GENERAL BUSINESS
MINIMUM LOT SIZE = 20,000
MINIMUM FRONTAGE = 125 ft.
SETBACKS:
FRONT =30'
SIDE = 25'
REAR = 20'
MAXIMUM BUILDING COVERAGE = 25%
FLOOD ZONE B
VENTILATION
12.74 12.5
DEPTH = 4' - -
i
FOUNDATl "F- v -f PTF -c' - croT•rr 'TJ AW VARIES' PUMP CHAMBER_ _ VARIES' D' BOX 92'
'TIC PROFILE (DESIGN A)
VENTILATION PI
(. 0T !•C SGti r)
T
T. A r-**. f 1 F?jM7 4..r CCWEP.s TO -=Z: P of GPADl - Y
1000
SEPTIC EL 1 f.9 ± dL ! f.9
INV, f: &1±
INV. 2: 8 ±OFF TO DB9
INV. 3: 8. ± I DB
INV 4: 9 + Sdd SEPTIC DSSIGS' I I l000 GAL
- INLET 7
EL 43
CALCVIArroYS FOR 2' PRESSURE
LYDIWTDUAL SEPTIC PUMP
T X 1: 8.50 T.LYE SIZES. TAKE f: 8.15 CHAMBER PIPE 11.38
TANK Y: 7.13 E;
TWX 3: 8.12 TANK 3: Z87 11.53 TES
DEPTH OF FLOW = 4' INLET TEE: PUMP CHAMBER WITH ZOELLER
TEE SIZES: DEPTH = 10' 293 (1 HP) DUPLEX ALTERNATING,
INLET = f0• HEIGHT = 6• PUMP SYSTEM (OR EQUAL)
OUTLET = fsr
Aw zus ENG DEPTH = 4'
N STOCEADB _
0j FENCE --
FOUNJAMN-VARIES'- SEPTIC TANK VARIES' PUMP CHAMBER VARIES' D' BOX.
0
PROP. f000
CAL. SEPTIC �..
,t 23
TANK
C
TH
4
SWAN
MED.
POND
CAL SEPTIC
SG
°
ZOELLER MODEL -
ALARM AND CONTROL
y
00000
b
USED AS A
v: LOCUS
{.�
PUMP CHAMBER
r o
a
TEST. EOl;E LOGS
I
OF FRONT BUILDING SO
c.
ev
D I
LOCATION MAP (NO SCALE)
ENGINEER: JAMES. C. JODICE
BUILDING ZONE: GENERAL BUSINESS
MINIMUM LOT SIZE = 20,000
MINIMUM FRONTAGE = 125 ft.
SETBACKS:
FRONT =30'
SIDE = 25'
REAR = 20'
MAXIMUM BUILDING COVERAGE = 25%
FLOOD ZONE B
VENTILATION
12.74 12.5
DEPTH = 4' - -
i
FOUNDATl "F- v -f PTF -c' - croT•rr 'TJ AW VARIES' PUMP CHAMBER_ _ VARIES' D' BOX 92'
'TIC PROFILE (DESIGN A)
VENTILATION PI
(. 0T !•C SGti r)
T
T. A r-**. f 1 F?jM7 4..r CCWEP.s TO -=Z: P of GPADl - Y
1000
SEPTIC EL 1 f.9 ± dL ! f.9
INV, f: &1±
INV. 2: 8 ±OFF TO DB9
INV. 3: 8. ± I DB
INV 4: 9 + Sdd SEPTIC DSSIGS' I I l000 GAL
- INLET 7
EL 43
CALCVIArroYS FOR 2' PRESSURE
LYDIWTDUAL SEPTIC PUMP
T X 1: 8.50 T.LYE SIZES. TAKE f: 8.15 CHAMBER PIPE 11.38
TANK Y: 7.13 E;
TWX 3: 8.12 TANK 3: Z87 11.53 TES
DEPTH OF FLOW = 4' INLET TEE: PUMP CHAMBER WITH ZOELLER
TEE SIZES: DEPTH = 10' 293 (1 HP) DUPLEX ALTERNATING,
INLET = f0• HEIGHT = 6• PUMP SYSTEM (OR EQUAL)
OUTLET = fsr
Aw zus ENG DEPTH = 4'
N STOCEADB _
0j FENCE --
FOUNJAMN-VARIES'- SEPTIC TANK VARIES' PUMP CHAMBER VARIES' D' BOX.
0
PROP. f000
CAL. SEPTIC �..
,t 23
TANK
C
TH
PROP. 1000
MED.
SAND
CAL SEPTIC
xTEES C
ZOELLER MODEL -
ALARM AND CONTROL
TANK TO BE
1
11.33
USED AS A
{.�
PUMP CHAMBER
r o
ALSO ON OUTSIDE WALL
TEST. EOl;E LOGS
I
OF FRONT BUILDING SO
�x
D I
ALARM LIGHT IS VISIBLE
ENGINEER: JAMES. C. JODICE
I
TO ROUTE 28. ALARM TO
)FITNESS: DAVID VASON
N
BE ON SEPARATE
DATE: APRIL ;, 1' 93
PERC. RATE: C2 3UN/INCH
'
1
11.7b1
1
J
�
4
g• dL 12 78 WELL MTY-29
9'
TOP AND ZONE A
SUBSOIL ADJUSTME37:.67'
DATE: JULY 26, 1993
t9 EL !!
FINE
SCATJ • 1"=20' _ REV. SEPT. 2, 1993
E. f-". f�
SAND
STOCKADE.
- -
FENCE
MED.
S
8•
OXIDE
STAINED
SAND5.�
7' ADJUS?rD WATER.
dT dL 4.48
90 WATER POUND
SITLY AT aL 1.79
12' SAND EL .78
NO
WATER
FOUND
TEST HOLE LOGS
ENGINEER: JAMES C. JODICE
WITNESS: DAVID MASON
DATE. AUGUST 26, 1993
01 EL 1 f.95 WELL Mrlr_Y9 0' EL 11.13
TOP ANB ZONE A TOP AND -
SUBSOIL ADJUSTMENT: 2.21 2.Y' SUBSOIL
1.5' dL 10.45 !.0' dL f0.23-
-PINT FINE
3. SAND EL 8.95 3' SAND EL 8.23
1
FL. f4.0±
INFILTRATORS
LEACHING FACILITY
INFILTRATORS
TO I-f/Y' HASHED STONE
18' LEACHING FACILITY
PUMP CHAMBER DESIGN
PROP.
FOR P
TO
TO BE
7 IN END
ENI
COVER
SYSTEM
MAINTENANCE
PUMP ON LEVEL
OFF
MED.
C
SEPTIC UPGRADE (PHASE II)
MED.
SAND
xTEES C
ZOELLER MODEL -
ALARM AND CONTROL
LCHECK
PANEL TO BE INSTALLED
INSIDE OFFICE AND
VALVES
ALSO ON OUTSIDE WALL
ADJUSTZD WATER
AT EL 4.43OU
OF FRONT BUILDING SO
�x
S 0 UTH YARMO UTH, MA
ALARM LIGHT IS VISIBLE
9.7' WATER FOUND
SILLY AT EL 1.15
9.
SJTLY AT 1L.2.13
TO ROUTE 28. ALARM TO
BE ON SEPARATE
f0' SEND EL. 1.29
'
ELECTRICAL FROM PUMPS.URCUIT
II
PROP.
FOR P
TO
TO BE
7 IN END
ENI
COVER
SYSTEM
MAINTENANCE
PUMP ON LEVEL
OFF
MED.
SEPTIC UPGRADE (PHASE II)
MED.
SAND
SAL"
s
IN THE TOWN OF:
ADJUSTZD WATER
AT EL 4.43OU
ADJUSTED WATER
Wd ER FOUND
�x
S 0 UTH YARMO UTH, MA
9.7' WATER FOUND
SILLY AT EL 1.15
9.
SJTLY AT 1L.2.13
i
SA.YD
f0' EL l.95
f0' SEND EL. 1.29
'
PREPARED FOR:
CAP'N GLAD CLIFF COND OMINI
MS
DATE: JULY 26, 1993
SCATJ • 1"=20' _ REV. SEPT. 2, 1993
E. f-". f�
i'