HomeMy WebLinkAbout891 Route 28 Proposed Septic Design 31
fTOn G' FOU+:.ATIO'r D
HORIZ
20 FT. MINIMUM FROM CELLAR
10 FT, MIN!MUM
AO FT. MINIMUM FROM SLAB OR CRAWL SPACE
ELEV. -99.50:
0-11
A
CONCRETE
COVERS
4' SCHEDULE 40 PVC PIPE
MIN. PITCH 1/8" PER FT.
1OYR5/3
-T
ROOTS
3.OD
8
4" CAST IRON PIPE
A�.
M
ROOTS
(CR E(YUAL) MINIMUM
Cl
MEDIUM SAND
2.5Y8/1 '
PITCH 1/4" PER FT.
_..t
0-9
-
FILL
FLOW LINE
i
ELEv. .• 55.50
-T10' N.
,
ECFV. - 94.75 LEVEL
ELEV, _a�•00_ GAS ELEV. + 94.50 6" SUMP ELEV. _ _54.33
BAFFLE
DISTF�IDunm ELEV -
LI�!)1C OUTLET a:.-:.. u �0_J
1 14�IN' HES (TO BE PLACED ON FIRM BASE) TO BE EORSTESTED
5 Fc.ET 19 INCHES .p P' ^ r 1 IF MCRE THAN ONE OUTLET
6 F Fi 24 INCHSS 500 GAII-1_01 .
7 FrET 29 INCH S �" -� (TO BE PLACED ON FIRM EASE)
E Ft.- E_ 34 INCH --S SEPTIC f AKII'�: J
_ 3/4" TO 1 1/Y CLEAN
DOUC-LE WASHED STONE
FREE OF FINES d• SILT
S'7V!l,G7 D'f5c 0S/1,► SYST1171 t'o 0M E
NOT TO SALE
SOIL TEST
CLEAN SAND DATE OF SOIL TEST APRIL 24,•;001 "
SOIL TEST DONE BY 0111S31 N�iNF�RING 1
LOAM AND SEED'WITNESSED BY @_Ss15!@PHS
OBSERVATION HOLE 1 ELEV. 97.50 A
2' LAYER of OBSERVATION HOE 2 -ELEV.-. 97.90
PERCOLATION RATE MIN./INCH AT 54 INCHES PERCOLATION
-5-2-RATE
1/8' TO 1/2'
)7.50 MAX.
WASHED STONE
1
X MIN. NOTTREQUIRED
_z_ 1 CU. FT. OF
CONCRETE
94.50 'o ANCHOR
L I• 10 ELEV. + 93.17
C HIGH CAPACITY INFILTRATORS WITH � �
STONE IN AN - •L ` '
8' X 10TRENCH FORMATION
0 Ln
5.27
11' X 4 '
Rt
C
DEPTH
HORIZ
TEXTURE
COLOR
MOTT.
OTHER
0-11
A
LOAMY SAND
1OYR5/3
NO
ROOTS
11-24
8
LOAMY SAND
2,5Y7/4.
ROOTS
24-132
Cl
MEDIUM SAND
2.5Y8/1 '
SO:L a�5CiJ0t' IiO V WELL_ 1iY / x 98.7 �s s
ZONE 98.6. 9�¢ WATER ENCOUNTERED AT 126'_ ELEV.
S i:-. A7.o0NO WATER ENCOUNTER DAT - 12t'_ ELEV:.- 87-40
�,�►TEM {SAS) INDEX 7.1 1
ADJUST 0.9
�•9
n LISTS PROBABLE WATER TABLE ELEV. .-@LB.Q_i a sg LEVET. DESIGN
CALCULATIONS
OBSERVED NATER TABLE (4/24/01) ELEV. - _6L04_ \ Sq EXISTING SPOT ELEVATION: '00 0 NUMBER OF BEDROOMS
BOTTOM OF TEST HOLE ELEV. -, _�F �Q_ I g �Q 98.9 EXISTING CONTOUR ----DO---- GARBAGE- DISPOSAL UNIT �tS- ,
111 FINAL SPOT ELEVATION, TOTAL ESTIMATED FLOW
FINAL CONTOUR `
J 1 y ( 110 CAL•/8R R./DAY X ` ` B'?.)4_ CAL/DAY .
SOIL TEST LOCATION REQUIRED SEPTIC TANK CAPACITY , Ep4_ GAL
UTILITY POLE -p- ACTUAL SIZE OF SEPTIC TANK 1, GAL.
( > ". y%< TOWN WATER ++W \ SOIL CLASSIFICATION
i \\ \\ -5 CATCH BASIN - Vel DESIGN PERCOLATION RATE "' ',5 MIN /!N. . '
t 9 GAS UNE -. EFFLUENT LOADING
CLEAN OUT C LEACHING AREA RATE' �4
CAL/DAY/S.F.
\.
SO. FT. _
CESSPOOL C.P.O 01X48)+(59=10/12)
LEACHING CAPACITY (AREA X ATE)
AIM GAL/DAY
-Oz AOSA i� i O� C2C:33 X 0,74
REFINE LEACHING CAPACITY,
4 R x3,4a 'GAL./DAY
- RE
\
NOTES:
1. ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO D.E.P.
✓y 5 N S i TITLE 5 AND THE TOWN OF GT!Vlllt ..`_-RULES AND
REGULATIONS FOR THE SUBSU FACE DISPOSAL OF SEWAGE.
8` / �I7 X 9� �\ 2. ALL COVERS TO SANITARY UNITS SHALL BE BROUGHT TO
9
l .8 \1 WITHIN 6 OF FINISHED GRADE. i
tea• / 6' \ �S�p\ 3. ALL COMPONENTS OF THE SAN TARY SYSTEM SHALL BE CAPABLE OF .
WITHSTANDING H-10 LOADING WNLESS THEY ARE UNDER OR WITHIN
k
°� �` 10 FT. OF DRIVES OR PARKING AREAS. H-20 LOADING SHALL BE
k2• \ \� - USED UNDER OR WITHIN 10 FL OF DRIVES OR PARKING AREAS. '
4. ANY MASONARY UNITS USED TO BRING COVERS TO GRADE SHALL
9.2/ 98.3 DL AREA 98.7 ` BE MORTARED IN PLACE,
It 5. NO DETERMINATION HAS BEEN VADE AS TO COMPLIANCE WITH
DEEDED OR ZONING REGULATIONS. OWNER /APPLICANT IS. TO 1
g0• 2 00 GAL ON OBTAIN SUCH DETERMINATION ROM APPROPRIATE AUTHORITY„
D E 6. UTILITIES SHOWN ARE APPROXIMATE ONLY, EXCAVATION CONTRACTOR I
J - IS TO CALL "DIG -SAFE' AT 1- 88-344-7233 AT LEAST 72 HOURS
1500 ALLON x�
PRIOR TO COMMENCING WORK N SITE.
PTIC TANK
98.6
SEPTI TANK
7. CONTRACTOR IS TO VERIFY GRADES AND ELEVATIONS AS WELL AS
` / 99.0, / 11 SITE CONDITIONS PRIOR TO CO, MENCINC WORK ON SITE, ANY VARIATION I
IS TO BE BROUGHT TO THEA NTION OF THE DESIGN ENGINEER
J 99 182 \\\ IMMEDIATELY.
8. PARCEL IS IN FLOOD ZONE tt C `
/ 9. LOT IS SHOWN ON ASSESSORS MAP 41
X 98.4-- .. - \\\ - _ AS PARCEL 47
qq' ' 98 6
a �\li
ESEa� � � yg1 R
\6� ^U�' 151'\ / lP•p0. , / - \ \ �\
7 7 x 98.1
G
98.6x 98.5 � 10'741
..
2 0c X 98.0 nY 0
r L t i i GG
h u
' 97.6�_�,.. U Q
199.2
099.2
,CTL; J
X8.5
W 3500 GALLON X 99.4
y7 c
099.2 SEPTIC TANK
99.2 /'. 20 A
12 ✓ /- -
00 GALLON
SEPTIC TANK
98.7
2500 GALLON
AREA' 98.3 PUMP CHAMBER
GRAS 98.6 SEPTIC CO _
_ C 98.0
1 8.5 v
cF 1 /SOIL 98.3 A o�
J. t EST 2 S ARE 8.5
V _ 98.1 RAS X 98.7
1 / G
5'S 8.0 �� J�war'uaa'� APPROVED: B
, �F s ARD DF . HEALTH -
T A.
[/. No 610x1
o. MANHOLE COVER it ,L�o DATE AGENT
za` ELEV. + 98.04 YYY i c 0P
(ASSUMED)`riARI"N
y8.3 PROPOSED SEPTIC DESIGN,
AND
OVERALL SCFii DEVELOPIT_
FOR
BASS RIVE h�OT'EL LLLC VESI BUILDING EAST BUILDING opo
NUMBER
OF DES
NOOOV CALCULATIONS 10, NUMBER DESIGN EM CALCULATIONS ONE OFFICE Ro��E 2B WILLOW PROJECT LOCATION ' OUTE 28
GARBAGE DISPOSAL UNIT Iv_0 GARBAGE DISPOSAL UNIT NO' SOUTH t 1O� Tt@7psr
TOTAL ESTIMATE[ FLOW TOTAL ESTIMATED FLOW v j+�+ I V 113
P ( 110 GAL Ir!-,- DAY X - ID SR.) 1140_ CAL./DAY ( 110 CAL^/8R./DAY X 19 En.) + 200 _75" GAL/DAYREQUIRE�
ACTUAL S!ZE OF FIRS Y EPP0 tTANK 2''D - n
�_ GAL. REQUIRED SEPTIC TANK CAPACITY _3040_ GAL D
GAL ACTUAL SIZE OF FIRST SEPTIC TANK : _3500 GAL z t'l' o
ACTUAL SIZE OF SECOND SEPTIC TANK �1_"i_ CAL ACTUAL SIZE OF SECOND SEPTIC TANK kO GAL � 235 GREAT WEST RN ROAD '(
SOIL CLASSIFlCATON - - ---
�J_ SOIL CLASSIFICATION 1_ b08- P. 0. OX 713
DESIGN PERCOLAIO"! RATE � i g y
Z$� MIN./N. DESIGN PERCOLATION RATE 5_4_ MIN./IN. Lo= O 398-3922 SOUTH DE NIS MASS, y
EFFLUENT LOADING RATE _4.74_ GAL./DAY/S.F, EFFLUENT LOADING RATE 02660 4
LEACHING AREA -2240 GAL /OAY/S.F.
�r. �� S0. FT. LEACHING AREA �2Gr�•QOSO. 17.
(30Y.50) 2 X (22 X 50) DATE SCALE �' = i s
LEACHING CAPACTY (AREA X RATE) lVIDM GALJDAY LEACHING CAPACITY (AREA X RATE) 1,2'.44GAL/DAY AUG. 24, 2001 ^ 200 p
1500 X 0,14 2200.00 X 0.74 Y
RESERVE LEACHING CAPACITY 1114.44 GAL./DAY RESERVE LEACHING CAPACITY MOM GAL/DAY REV.I
OCT. 18, 2001 JOB,rro. 5093-00 p
6
LOCATION MAP REv. DEC. 31, 2001 SHEET 1 or 1
1
T
02001 SWEETSER ENGINEERING r
MIN./INCH iN C HORIZON
::
DEPTH
HORIZ
TEX
URE
COLOR MOTT.
OTHER
0-9
-
FILL
i
9-19
A ^=
LOAMY
SAND
10YR5/3 NO
ROOTS
i
3
19-27
B ,'
LOAMY
SAND
10YR6/6
ROOTS
27-126
C1
MEDIUM
SAND
10YRS/1
I
I
SO:L a�5CiJ0t' IiO V WELL_ 1iY / x 98.7 �s s
ZONE 98.6. 9�¢ WATER ENCOUNTERED AT 126'_ ELEV.
S i:-. A7.o0NO WATER ENCOUNTER DAT - 12t'_ ELEV:.- 87-40
�,�►TEM {SAS) INDEX 7.1 1
ADJUST 0.9
�•9
n LISTS PROBABLE WATER TABLE ELEV. .-@LB.Q_i a sg LEVET. DESIGN
CALCULATIONS
OBSERVED NATER TABLE (4/24/01) ELEV. - _6L04_ \ Sq EXISTING SPOT ELEVATION: '00 0 NUMBER OF BEDROOMS
BOTTOM OF TEST HOLE ELEV. -, _�F �Q_ I g �Q 98.9 EXISTING CONTOUR ----DO---- GARBAGE- DISPOSAL UNIT �tS- ,
111 FINAL SPOT ELEVATION, TOTAL ESTIMATED FLOW
FINAL CONTOUR `
J 1 y ( 110 CAL•/8R R./DAY X ` ` B'?.)4_ CAL/DAY .
SOIL TEST LOCATION REQUIRED SEPTIC TANK CAPACITY , Ep4_ GAL
UTILITY POLE -p- ACTUAL SIZE OF SEPTIC TANK 1, GAL.
( > ". y%< TOWN WATER ++W \ SOIL CLASSIFICATION
i \\ \\ -5 CATCH BASIN - Vel DESIGN PERCOLATION RATE "' ',5 MIN /!N. . '
t 9 GAS UNE -. EFFLUENT LOADING
CLEAN OUT C LEACHING AREA RATE' �4
CAL/DAY/S.F.
\.
SO. FT. _
CESSPOOL C.P.O 01X48)+(59=10/12)
LEACHING CAPACITY (AREA X ATE)
AIM GAL/DAY
-Oz AOSA i� i O� C2C:33 X 0,74
REFINE LEACHING CAPACITY,
4 R x3,4a 'GAL./DAY
- RE
\
NOTES:
1. ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO D.E.P.
✓y 5 N S i TITLE 5 AND THE TOWN OF GT!Vlllt ..`_-RULES AND
REGULATIONS FOR THE SUBSU FACE DISPOSAL OF SEWAGE.
8` / �I7 X 9� �\ 2. ALL COVERS TO SANITARY UNITS SHALL BE BROUGHT TO
9
l .8 \1 WITHIN 6 OF FINISHED GRADE. i
tea• / 6' \ �S�p\ 3. ALL COMPONENTS OF THE SAN TARY SYSTEM SHALL BE CAPABLE OF .
WITHSTANDING H-10 LOADING WNLESS THEY ARE UNDER OR WITHIN
k
°� �` 10 FT. OF DRIVES OR PARKING AREAS. H-20 LOADING SHALL BE
k2• \ \� - USED UNDER OR WITHIN 10 FL OF DRIVES OR PARKING AREAS. '
4. ANY MASONARY UNITS USED TO BRING COVERS TO GRADE SHALL
9.2/ 98.3 DL AREA 98.7 ` BE MORTARED IN PLACE,
It 5. NO DETERMINATION HAS BEEN VADE AS TO COMPLIANCE WITH
DEEDED OR ZONING REGULATIONS. OWNER /APPLICANT IS. TO 1
g0• 2 00 GAL ON OBTAIN SUCH DETERMINATION ROM APPROPRIATE AUTHORITY„
D E 6. UTILITIES SHOWN ARE APPROXIMATE ONLY, EXCAVATION CONTRACTOR I
J - IS TO CALL "DIG -SAFE' AT 1- 88-344-7233 AT LEAST 72 HOURS
1500 ALLON x�
PRIOR TO COMMENCING WORK N SITE.
PTIC TANK
98.6
SEPTI TANK
7. CONTRACTOR IS TO VERIFY GRADES AND ELEVATIONS AS WELL AS
` / 99.0, / 11 SITE CONDITIONS PRIOR TO CO, MENCINC WORK ON SITE, ANY VARIATION I
IS TO BE BROUGHT TO THEA NTION OF THE DESIGN ENGINEER
J 99 182 \\\ IMMEDIATELY.
8. PARCEL IS IN FLOOD ZONE tt C `
/ 9. LOT IS SHOWN ON ASSESSORS MAP 41
X 98.4-- .. - \\\ - _ AS PARCEL 47
qq' ' 98 6
a �\li
ESEa� � � yg1 R
\6� ^U�' 151'\ / lP•p0. , / - \ \ �\
7 7 x 98.1
G
98.6x 98.5 � 10'741
..
2 0c X 98.0 nY 0
r L t i i GG
h u
' 97.6�_�,.. U Q
199.2
099.2
,CTL; J
X8.5
W 3500 GALLON X 99.4
y7 c
099.2 SEPTIC TANK
99.2 /'. 20 A
12 ✓ /- -
00 GALLON
SEPTIC TANK
98.7
2500 GALLON
AREA' 98.3 PUMP CHAMBER
GRAS 98.6 SEPTIC CO _
_ C 98.0
1 8.5 v
cF 1 /SOIL 98.3 A o�
J. t EST 2 S ARE 8.5
V _ 98.1 RAS X 98.7
1 / G
5'S 8.0 �� J�war'uaa'� APPROVED: B
, �F s ARD DF . HEALTH -
T A.
[/. No 610x1
o. MANHOLE COVER it ,L�o DATE AGENT
za` ELEV. + 98.04 YYY i c 0P
(ASSUMED)`riARI"N
y8.3 PROPOSED SEPTIC DESIGN,
AND
OVERALL SCFii DEVELOPIT_
FOR
BASS RIVE h�OT'EL LLLC VESI BUILDING EAST BUILDING opo
NUMBER
OF DES
NOOOV CALCULATIONS 10, NUMBER DESIGN EM CALCULATIONS ONE OFFICE Ro��E 2B WILLOW PROJECT LOCATION ' OUTE 28
GARBAGE DISPOSAL UNIT Iv_0 GARBAGE DISPOSAL UNIT NO' SOUTH t 1O� Tt@7psr
TOTAL ESTIMATE[ FLOW TOTAL ESTIMATED FLOW v j+�+ I V 113
P ( 110 GAL Ir!-,- DAY X - ID SR.) 1140_ CAL./DAY ( 110 CAL^/8R./DAY X 19 En.) + 200 _75" GAL/DAYREQUIRE�
ACTUAL S!ZE OF FIRS Y EPP0 tTANK 2''D - n
�_ GAL. REQUIRED SEPTIC TANK CAPACITY _3040_ GAL D
GAL ACTUAL SIZE OF FIRST SEPTIC TANK : _3500 GAL z t'l' o
ACTUAL SIZE OF SECOND SEPTIC TANK �1_"i_ CAL ACTUAL SIZE OF SECOND SEPTIC TANK kO GAL � 235 GREAT WEST RN ROAD '(
SOIL CLASSIFlCATON - - ---
�J_ SOIL CLASSIFICATION 1_ b08- P. 0. OX 713
DESIGN PERCOLAIO"! RATE � i g y
Z$� MIN./N. DESIGN PERCOLATION RATE 5_4_ MIN./IN. Lo= O 398-3922 SOUTH DE NIS MASS, y
EFFLUENT LOADING RATE _4.74_ GAL./DAY/S.F, EFFLUENT LOADING RATE 02660 4
LEACHING AREA -2240 GAL /OAY/S.F.
�r. �� S0. FT. LEACHING AREA �2Gr�•QOSO. 17.
(30Y.50) 2 X (22 X 50) DATE SCALE �' = i s
LEACHING CAPACTY (AREA X RATE) lVIDM GALJDAY LEACHING CAPACITY (AREA X RATE) 1,2'.44GAL/DAY AUG. 24, 2001 ^ 200 p
1500 X 0,14 2200.00 X 0.74 Y
RESERVE LEACHING CAPACITY 1114.44 GAL./DAY RESERVE LEACHING CAPACITY MOM GAL/DAY REV.I
OCT. 18, 2001 JOB,rro. 5093-00 p
6
LOCATION MAP REv. DEC. 31, 2001 SHEET 1 or 1
1
T
02001 SWEETSER ENGINEERING r