Loading...
HomeMy WebLinkAbout1044 Route 28 - Partial Site Plan & Elevation((E) PARKING (P) CUSTOM FIBERGLASS STEEPLE TO HOUSE (6) (P) PANEL ANTENNAS (E) STEEPLE TO BE REMOVED SECTOR C (E) LANDSCAPING (P) COAX/FIBER THRU CHURCH - UP TO (P) FIBERGLASS STEEPLE ((E) PARKING (E) EDGE OF PAVEMENT (E) TREELINE (P) U/G COAX/UTILITIES FROM (P) EQUIPMENT SHELTER TO (E) CHURCH (P) DIESEL GENERATOR MOUNTED INSIDE (P) EQUIPMENT SHELTER ADVANCED ENGINEERING GROUP, P.C. Civil Engineering - Site Development Surveying - Telecommunications 500 NORM BROADWAY FAST PROVIDENCE, RI 02914 PH: (401) 354-2403 FAX: (401) 633-6354 (P) ll' -5"x24' -O" - EQUIPMENT SHELTER F O R E S T R 0 A D (E) CHURCH N ((E) PARKING (P) GROUND TO (E) WATER MAIN (E) LANDSCAPING NOTE: EXISTING POWER AND TELCO SERVICE TO BE UPGRADED AS REQUIRED PARTIAL SITE PLAN Z-3 SCALE: 1 "=20' Convergent Network Solutions TOWER RESOURCE MANAGEMENT 16 CHESTNUT STREET FOXBOROUGH, MA 02035 SITE NUMBER: MA1010S SITE NAME: OUR LADY OF THE HIGHWAY FOREST ROAD YARMOUTH, MA 02664 0 z NOTE: A STRUCTURAL ANALYSIS OF THE ROOF TO SUPPORT THE PROPOSED EQUIPMENT HAS NOT BEEN COMPLETED BY ADVANCED ENGINEERING GROUP. DESTRUCTIVE RECONNAISSANCE OF THE ROOFTOP, INSPECTION, AND FULL STRUCTURAL ANALYSIS WILL BE REQUIRED BEFORE CONSTRUCTION NOTES 1. FINAL ANTENNA, CABLE & EQUIPMENT LOCATIONS SUBJECT TO STRUCTURAL ANALYSIS AND LANDLORD APPROVAL. 2. FINAL UTILITY CONDUIT ROUTES SUBJECT TO LANDLORD APPROVAL. 3. BACKUP GENERATOR, GAS SUPPLY LINE & METER LOCATIONS SUBJECT TO UTILITY COMPANY AND LANDLORD'S APPROVAL 4. PROPOSED LESSEE'S SHELTER, EQUIPMENT AND ANTENNA MOUNTING ARE SUBJECT TO STRUCTURAL ANALYSIS AND RF ANALYSIS 5. POWER/TELCO/GROUND/FIRE TO FOLLOW AT&T'S INSTALL TO DEMARC'S 6. FIRE SYSTEM TO BE TIED INTO EXIST. CLOSEST ADDRESSABLE SYSTEM (P) U/G COAX/UTILITIES FRO (P) EQUIPMENT SHELTER TO (E) CHURCH a l&t offi MARC R. __, / u CHRETIEJ E cIv 550 COCHITUATE ROAD, SUITE 13, FRAMINGHAM, MA 01701-4681 (P) CUSTOM FIBERGLASS STEEPLE TO HOUSE (6) (P) PANEL ANTENNAS (E) STEEPLE TO BE REMOVED TOP OF STEEPLE CUSTOM STEEPLE -LEV. = 52'-6" t BE REMOVED) TOP OF (E) STEEPLE ELEV. = 45'-O"± TOP OF (P) ANTENNAS ELEV. = 43'-6"± 1 � OF (P) ANTENNAS ELEV. = 40'-6"± I ;! (P) COAX/FIBER THRU CHURCH UP TO (P) FIBERGLASS STEEPLE �(P) GROUND TO WATER MAIN q OF (P) ANTENNAS ELEV. = 32'-6"± TOP OF (E) ROOF ELEV. = 27'1 2 SOUTH ELEVATION Z-3 SCALE: 1 "=4'-0" (E) GRADE ELEV. = 0'f DESCRIPTION PARTIAL SITE PLAN & ELEVATION 1 02/07/14 ISSUED FOR REVIEW JTG SNA SNA 0 01/29/14 ISSUED FOR REVIEW JTG SNA SNAJOB NUMBER SHEET NUMBERff REV NO. DATE REVISIONS BY CHK APP'D I MA1010S Z_3 1 SCALE: AS SHOWN DESIGNED BY:JTG DRAWN BY: JTG