Loading...
HomeMy WebLinkAbout1353 Route 28 - Site Layout PlanANnsCAPE SCHEDULE TYPE QTY SIZE COMMON NAME BOTANICAL NAME OA 9 6' AMERICAN ARBORVITAE THUJA OCCIDENTALIS JI I t L%; I UU I rLNIN SCALE: 1 "=10' ROUTE 28- BRIDGE STREET (PUBLIC -TWO WAY) SOUTH YARMOUTH CHOUSAH ENGINEERING GROUP, P.C. CONSULTING PROFESSIONAL ENGINEERS 3119 CRANBERRY HIGH\NAY, UNIT 519, WAREHAM, MA 02538 TEL:(508) 759-6260 FAX. -(508) 759-6230 www.choubahgroup.com Project: PROPOSED MODIFICATIONS AT 1.353 MAIN STREET SOUTH YARMOUTH, MASSACHUSETTS r KNOT GUY WEBBING DO NOT CUT LEADER 80 J TREE PER PLAN r REMOVE ALL DEADWOOD 00 NOT GUYING DETAIL ,� ANY OTHEREMOVE VEGETATION) GUY WEBBING yG_ ATTACHED NO HIGHER 8 -(MAX.) �L7VM1/__ THAN 1/2 AND NO LOWER THAN 1/3 THE HEIGHT OF THE TREE d% Prepared For: 1353 MAIN STREET 3" PINEBARK MULCH CHRISTY'S GAS STATION ' I UNLESS NOTED ON PLANS) OTHERWISE YARMOUTH, MA BACKFILL WITH LOAM I MOUND WITH EXCAVATED SOIL TO 3 ABOVE FINISHED GRADE 2"x2 HARDWOOD r PLANT TREE AT STAKES -'� i DEPTH EQUAL TO HEIGHT VARIES - - 2 LESS THAN THE DRIVE INTO DISTANCE FROM GROUNDD OUTSIDE BOTTOM OF CIO OF PLANTING PIT._J ROOTBALL TO ROOT COLLAR ROOTBALL ON J Z a UNDISTURBED CUT AND REMOVE SUBGRADE BURLAP AND WIRE 2 x ROOTBALL 13A3KET FROM TOP OF ROOTBALL �1�+ DIAMETER (MIN.) ENE GPr7—tJ TCD CC' DLANTII,ar DET,' I! ... ' Q ��i i3 i...� ..o�G. :.� ,... NOT TO SCALE - "mss AL NOTES TO CONTRACTOR FOR SITE�� SHALL BE THE CONTRACTOR'S SOLE RESPONSIBILITY TO OBTAIN ANY ail 7 ' _ PERMITS REQUIRED BY THE STATE OF MASSACHUSETTS AND THE �I'A:.` F YARMOUTH PRIOR TO COMMENCING ANY WORK. IE LOCATION OF EXISTING UNDERGROUND UTILITIES SHOWN ON THIS PLAN IS APPROXIMATE. Issue Date: 11/03/05 '0 ANY EXCAVATION ON THIS SITE, THE EXCAVATING CONTRACTOR SHALL MAKE THE :D 72 HOUR NOTIFICATION TO DIG SAFE (1-888-344-7233) Revisions Y OTHER UTILITIES WHICH MAY HAVE CABLE, PIPE OR EQUIPMENT IN THE CONSTRUCTION No. Date Description )R VERIFICATION OF LOCATIONS. IE CONTRACTOR SHALL BE RESPONSIBLE TO REVIEW THE CONSTRUCTION DRAWING NOTIFY THE ENGINEER WITH ANY DISCREPANCY BETWEEN THE DESIGN AND NUFACTURES' REQUIREMENTS AND ALL LOCAL, STATE AND FEDERAL CODES. IE CONTRACTOR SHALL BE RESPONSIBLE FOR THE SECURITY AND JOB SAFETY ON THE 'HE CONSTRUCTION SHALL BE PERFORMED IN ACCORDANCE WITH "OSHA" AND THE MUNICIPALITY CONSTRUCTION STANDARDS. Project Number: 05-139 E CONTRACTOR SHALL BE RESPONSIBLE TO DISPOSE OF ANY UNSUITABLE OR SURPLUS Scale: 1'=10' LS PROPERLY OFF SITE IN ACCORDANCE WITH LOCAL AND STATE ENVIRONMENTAL CODES. Designed By: HC E CONTRACTOR SHALL CONFINE HIS OPERATIONS AND ACTIVITIES .WITHIN THE PROPERTIES Drawn By: IES Checked By: HC F WAY. NO PROPOSED WORK IS ANTICIPATEDON PUBLIC STREETS. Sheet Title: SHALL BE THE OWNER'S RESPONSIBILITY TO PRESENT AND REVIEW THIS PLAN WITH THE SITE PLAN WILDING OFFICIALS TO INSURE COMPLIANCE WITH LOCAL SETBACK REQUIREMENTS AND TO ANY VARIANCES OR SPECIAL PERMITS IN CONNECTION WITH THE INSTALLATION OF THE ED WORK SHOWN ON THE PLANS. E CONTRACTOR SHALL MAINTAIN ALL EXCAVATION IN DRY CONDITIONS. L EXISTING UTILITIES WATER, GAS, DRAINS, & ELECTRIC SHALL BE PROPERLY PROTECTED INTAINED DURING THE CONSTRUCTION PERIOD: Y DEVIATION FROM THE CONTENT OF THESE PLANS WITHOUT WRITTEN CONSENT OF THIS R WOULD MAKE IT NULL AND VOID. CASE OF A CONFLICT BETWEEN THE PROPOSED WORK SHOWN ON THIS PLAN AND THE BLE LOCAL AND STATE CODES, THE APPLICABLE CODES SHALL GOVERN. 12. THE CONTRACTOR SHALL SHORE, BRACE, SHEET PILE OR OTHERWISE SUPPORT THE EXISTING BUILDING, UTILITIES AND STREETS NEXT TO THE PROPOSED EXCAVATION. Sheet Number. 1 OF 4 13. ALL CONSTRUCTION MATERIAL, COMPONENTS, AND METHODS EMPLOYED ON THIS PROJECT WORK SHALL CONFORM TO THE TOWN OF YARMOUTH AND OR THE MASSACHUSETTS BUILDING CODES. 14. COORDINATE COOLER INSTALLATION WITH COOLER MANUFACTURER.