Loading...
HomeMy WebLinkAbout796 Route 28 Proposed Site Plano 50 20.0 EXISTING 10000 2 TREES DD 2 TREES i Q O REOMOuuuuVE GREASE TRAP, Op 23.00 �T,4tt HOLDING TANK LID I PER DETAI TCH BASI EXISTING BLDG. EL 8.28 FF ELEV 13.94 -6.7% TO BE REMOVED EXISTING gO 0 / PROPOS D / 9 SLAB /EL 11.60 �6 s RAZALCA i 6 PLCS �p0.130 F VC -2 ZONE R3 USE - L-5 PER 202.5 FLOOD ZONE - AE -11 PARKING CALCULATIONS EMPLOYEES 8 RATE 1/2 EMPLOYEES SPACES REQ'D 4 PROVIDED 8 SITE COVERAGE PROPOSED BUILDING 3600 SF PAVED 8489 SF TOTAL 12089 SF COVERAGE 62% R:MOVE EXISTING SEPTIC SYSTEM ADD 0.92 1 T1 6" ROOF DRAIN EXISTING 4 PLCS. BENCHMARK: CATCH BASIN MONITOPING IiELL RIM 9.18 ..., vn sg Nr:VD 83 /1 21.5' x 21.5' " LOCUS GENERAL NOTES 1) ALL WORKMANSHIP AND MATERIAL: SHALL CONFORM TO 314CMR18.00 THE STATE ENVIRONMENTAL CODE FOR INDUSTRIAL WASTEWATER HOLDING TANK AND CONTAINER CONSTRUCTION, OPERATION, AND RECORD KEEPING REQUIREMENTS. AVAILABLE ONLINE AND FROM STATE HOUSE BOOKSTORE 1-617-727-2834, AND TOWN OF YARMOUTH RULES AND REGULATIONS FOR HAZARDOUS WASTE WHICH ARE INCORPORATED HEREWITH BY REFERENCE. 2) CONTRACTOR SHALL VERIFY LOCATION OF EXISTING UTILITIES. CONTACT DIG -SAFE AND LOCAL WATER DEPARTMENT 3 BUSINESS DAYS BEFORE BEGINNING CONSTRUCTION. 3) CONTRACTOR RESPONSIBLE FOR OBTAINING ADEQUATE HORIZONTAL AND VERTICAL CONTROL. 4) CONTRACTOR SHALL LOCATE ALL EXISTING SANITARY FACILITIES ON PREMISES NO LONGER USED AND PUMP, AND FILL OR REMOVE SAME IN ACCORDANCE WITH LOCAL REQUIREMENTS. 5) PIPING TO B`- INSTALLED PER 248CMR: BOARD OF STATE EXAN11NERS OF FLIjhBERS AND GAS Fll'�ERS. 6) UNLESS OTHERWISE SPECIFIED, EXISTING AND FINAL GRADES SHALL REMAIN ESSENTIALLY UNCHANGED. 7) NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE WITH DEEDED OR ZONING RESTRICTIONS AND/OR REGULATIONS. OWNER/APPLICANT MUST OBTAIN SUCH DETERMINATION FROM APPROPRIATE AUTHORITY. 8) IF ANY DETAIL OF THIS PLAN IS NOT UNDERSTOOD, CONTACT DESIGN ENGINEER AT 508-394-1960. 9) INSTALLATION TO BE SUPERVISED BY DESIGN ENGINEER. 48 HOUR NOTICE IS REQUIRED FOR INSPECTION OF DRAINS AND VENT PIPING AND INSTALLATION OF TANKS. DESIGN ENGINEER TO CERTIFY INSTALLATION TO DEP AND TOWN OF YARMOUTH BOARD OF HEALTH. 10) SITE LIES WITHIN FLOOD ZONE C AS SHOWN ON MAP 250008 0005 B DATED 09-30-80. 11) KEEP A BOARD OF HEALTH AND DEP APPROVED COPY OF THIS PLAN ON JOB SITE DURING CONSTRUCTION. 12) VISUAL AND AUDIBLE ALARMS FOR HIGH WATER AND LEAK DETECTORS TO BE INSTALLED ON SEPERATE ELECTRICAL CIRCUIT IN STAFFED LOCATION. ELECTRICAL PERMIT REQUIRED. 13) A CONTRACT WITH AN APPROVED SANITARY WASTE CONTRACTOR IS A REQUIREMENT FOR ISSUING A PERMIT PERSUANT TO THIS PLAN. 0 6 XIRD SIGN +So K'n�- ,P925' x 3 6'x13' NE / �Yr ARBOR NTA ER, TOP 11.37 NCH *4 n 69 � Yarmouth Health Department PROP �� I� `� - APPROVED PIT � h 2 .0 HI _ _ oaARgE E 2�3 ,,716 4 PLCS A i �� O� !\ar;c Dae 0.44 AG f SIGN: ROAD 19359 SF .+ INTERSECTING X96 RIGHT 11 � 41 PROPOSED SITE PLAN aER@[Rae[pko LOCATION: 796-798 RT 28 SO. YARMOUTH MA MAY + < 2016 MAP/PARCEL: 33/50 HEALTH DEPT PREPARED FOR: MARIE CARONISILVER CLOUD TOWING SCALE: 1:20 DATE: 08-11-15 rev 05/11/16 'dam .Y P,t�los=rr,�r� DAN A. SPEAKMAN CONSTRUCTION GE9 N 10 0 10 20 30 1 \ YOUI SCALE 1 20 ! SPEAAb 3D 118 KMAW �m No. 39402 y LAND SURVEYING & TITLE V ENGINEERING DIV. 15 SPEAK WAY, N. HARWICH, MA ess�� yE 508-432-5565