Loading...
HomeMy WebLinkAboutEngineered Plan - 2016rlm- Tc t TOP OF FOUNDATION ELEV. = 100-00---, (ASSUMED) m �NTERIOR PIPING IS TO BE ELOCATED BY A LICENSE LUMBER (IF NECESSARY) LIQUID 4DEP EET 5 FEET 6 FEET 7 FEET 8 FEET LEGEND: 99. � 99.8 SHED 99.5 99.4 SOIL 99.5 TEST O g��� 99.2 �O. Y � 0.0' �� C9 / 1 2 Q) -'j &7 C.O. a0 ,.� 98 . 95.4 D. BOX 99 7pQ, /l ��./LIMIT OF 5' 4 LOT ,35 8,502 f S. F. / OVERDIG �y O >> IL \ \ Ly 9 7. 9 �� 00' TEST 97.3 / \ \ 0R/�\ 8 �9\ • 96.8 EXISTING SPOT ELEVATION 00,0 EXISTING CONTOUR----00---- FINAL SPOT ELEVATION 00.0 FINAL CONTOUR 00 SOIL TEST LOCATION UTILITY POLE -O- TOWN WATER - W -=-j- W ---- CATCH BASIN `® j GAS LINE G CLEAN OUT C. 0. CESSPOOL C.P. Q SOIL TEST DATE OF SOIL TEST 96-1-1-9,_2016 SOIL TEST DONE BY LM_HAYES RS S _� WITNESSED BY P. RQ AU- OSSERVATION HOLE 1 ELEV.=_ 97.7 PERCOLATION RATE _ _zMIN:/INCH AT 44 INCHES W DEPTH HORIZ TEXTURE 20 FT. MINIMUM FROM CELLAR OR CRAWL SPACE MOTT. OTHER 10 FT. MINIMUM 10 FT. MINIMUM FROM SLAB 10-15" A/E LOAMY_ SAND 10YR5/1 CLEAN SAND 10YR6/4 CONCRETE 33-120" IC MEDIUM SAND 2.5Y7/4 DATE MAY 23, 2016 COVERS SCALE » � 1 = 20 INSPECTION PORT 4" SCHEDULE 40 PVC PIPE LOAM AND SEED REV. MIN. PITCH 1/8" PER FT. 2" LAYER OF LOCATION MAP REV. 1/8" TO 1/2" 6 � WASHED STONE 4" CAST IRON PIPE 98.82 MAX. OR FILTER FABRIC VENT (OR EQUAL) MINIMUM 96.57 MIN. NOT REQUIRED PITCH 1/4" PER FT. TEE Z LEVELERS �-' FLOW LINE 95.82 ELEV. = 97.00_ 10" -TMIN. °°� ELEV. _ _96.45 L20 - 10' ° ELEV. _ _96.70_ GAS ELEV. _ 85_49 6"S MP ELEV�., _ _15.32_ .- -- G - _-- ° ELEV. _ _94.49- BAFFLE � _ DISTRIBUTION OUTLET _ ELEV. _ 60� 4 HIGH CAPACITY WITH TEE 14 INCHES (TO BE .PLACED ON FIRM BASE) _$��_ TO BE WATER TESTED z INCHES HES 1500 GALLON IF MORE THAN ONE OUTLET 11' X 36, X 10®` TRENCH FORMATION '� 24 � 34 INCHES SEPTIC TANS (TO BE PLACED ON FIRM BASE) SOIL WELL .9 3/ 0 1/2" CLEAN DOUBLE. WASHED STONE +ABSORPTION SYSTEM �7TEM (SAS) ONE A2M INDEX L:Z4 _ (4/2016) ADJUST 1.04 FREE OF FINES & SILT SEWAGE DISPOSAL SYSTEM PROFILEUSGS PROBABLE WATER TABLE ELEV. = OBSERVED WATER TABLE (5/19/2016) ELEV. = NOT TO SCALE BOTTOM OF TEST HOLE ELEV. = _6,!�4�._ 99. � 99.8 SHED 99.5 99.4 SOIL 99.5 TEST O g��� 99.2 �O. Y � 0.0' �� C9 / 1 2 Q) -'j &7 C.O. a0 ,.� 98 . 95.4 D. BOX 99 7pQ, /l ��./LIMIT OF 5' 4 LOT ,35 8,502 f S. F. / OVERDIG �y O >> IL \ \ Ly 9 7. 9 �� 00' TEST 97.3 / \ \ 0R/�\ 8 �9\ • 96.8 EXISTING SPOT ELEVATION 00,0 EXISTING CONTOUR----00---- FINAL SPOT ELEVATION 00.0 FINAL CONTOUR 00 SOIL TEST LOCATION UTILITY POLE -O- TOWN WATER - W -=-j- W ---- CATCH BASIN `® j GAS LINE G CLEAN OUT C. 0. CESSPOOL C.P. Q SOIL TEST DATE OF SOIL TEST 96-1-1-9,_2016 SOIL TEST DONE BY LM_HAYES RS S _� WITNESSED BY P. RQ AU- OSSERVATION HOLE 1 ELEV.=_ 97.7 PERCOLATION RATE _ _zMIN:/INCH AT 44 INCHES W DEPTH HORIZ TEXTURE COLOR MOTT. OTHER 0-10" FILL PROPOSED S r"TIC , D IGN FOR t ABBOTT, . NO 10-15" A/E LOAMY_ SAND 10YR5/1 15-33" B LOAMY SAND 10YR6/4 33-120" IC MEDIUM SAND 2.5Y7/4 DATE MAY 23, 2016 37.7 38:87 36.45 34.95 37.7 WATER .ENCOUNTERED AT 111- ELEV. _ X88.45 DESIGN CALCULATIONS NUMBER OF BEDROOMS _ 3' GARBAGE DISPOSAL UNIT TOTAL ESTIMATED FLOW r ( 110 GAL/DR./DAY X .__3__ 8R.) _.N0_ GAL./DAY REQUIRED SEPTIC TANK CAPACITY MRQ_ GAL. ACTUAL SIZE OF SEPTIC TANK 1`GAL. SOIL CLASSIFICATION DESIGN PERCOLATION RATE 5�MIN,/IN. EFFLUENT LOADING RATE Q.74 GAL./DAY/S.F. LEACHING AREA 474.33 SQ. FT. (11X36)+(47=10/12) Z1V j- LEACHING CAPACITY (AREA -X RATE) -351M GAL./DAY 474.33 X 0.74 RESERVE LEACHING CAPACITY AQ4-L GAL./DAY MOTES: 1. ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO D.E.P'. TITLE 5 AND THE TOWN'S RULES AND REGULATIONS FOR THE SUBSURFACE DISPOSAL OF SEWAGE. 2. ALL COVERS TO SANITARY UNITS SHALL BE BROUGHT TO WITHIN 6" OF FINISHED GRADE. 3. ALL COMPONENTS OF. THE SANITARY SYSTEM SHALL BE CAPABLE OF WITHSTANDING H-10 LOADING UNLESS THEY ARE UNDER OR WITHIN 10 FT. OF DRIVES OR PARKING AREAS. H-20 LOADING SHALL BE USED UNDER OR WITHIN 10 FT. OF DRIVES OR PARKING AREAS. 4. ANY MASONARY UNITS USED TO BRING COVERS TO GRADE SHALL BE MORTARED IN PLACE. 5. NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE WITH DEEDED OR ZONING REGULATIONS. OWNER / APPLICANT 1S TO - OBTAIN SUCH DETERMINATION FROM APPROPRIATE AUTHORITY. 6. UTILITIES SHOWN ARE APPROXIMATE ONLY, EXCAVATION CONTRACTOR IS TO CALL "DIG -SAFE" AT 1-888-344-7233 AT LEAST 72 HOURS PRIOR T0. COMMENCING WORK ON SITE. 7. .CONTRACTOR IS TO VERIFY GRADES AND ELEVATIONS AS WELL AS SITE CONDITIONS PRIOR TO COMMENCING WORK ON SITE. ANY VARIATION - - IS TO BROLfGHT Tv-THE-ATTENTIOIN OF THE DESiGN--ET1tGti1EER -- - -: - ---- IMMEDIATELY. 8. PARCEL IS IN FLOOD ZONE X 9. LOT IS SHOWN ON ASSESSORS MAP -.59Y AS PARCEL 2 _ 10. ALL UNSUITABLE MATERIAL SHALL BE REMOVED FROM UNDER AND FOR A MINIMUM OF 5' AROUND SOIL ABSORPTION SYSTEM AND BE REPLACED WITH MATERIAL AS SPECIFIED IN 310 CMR 15.255:(3). iPernfit valid for REPAIR OF SEPTIC SVSTVM ONLY', d' 'to State, anti local septic variances. Poard of healih review And ;approval is required for any, future additions/ri nog atioies/alterations to sewage facilities'and/or,.structures/clwelling: .Va'rmotith Fleallta t)epatrtment 1.0 Oe Date; 11. EXISTING CESSPOOLS (3 MIN.) ARE TO BE PUMPED AND REMOVED ALONG WITH ANY POLLUTED SOILS ENCOUNTERED. 12. VARIANCES TO TITLE 5 AND TOWN REGULATIONS: A. SOIL ABSORPTION SYSTEM LESS THAN 20' FROM CELLAR (VAR. OF 5,2').. , B. NO RESERVE AREA. 11. EXISTING CESSPOOLS (3 MIN.) ARE TO BE PUMPED AND REMOVED ALONG,. WITH ANY POLLUTED SOILS ENCOUNTERED. APPROVED: DOARD ®C* HEALTI� - DATE AGENT C.•�S8�PROJX769,3-004dwg�7693-SAS.OWC 02016 T. M. HAYES. R.S. I S 1.10 Y P OW GRAY RD o W1NSL C bo3icu O z z � m Z =c Rp ST G�1FFG � Q PROPOSED S r"TIC , D IGN FOR t ABBOTT, . LOC* 19 1 17, ITS D. L,OT 05 S 0 6J P� _ l� � Ell TI A EST • . P� U S V C S 0 �' Sog- P. 0. BOX 483 564-8379 SOUTH DENNIS, MASS. 02660 DATE MAY 23, 2016 SCALE » � 1 = 20 F0­BNO- 7093--00 REV. LOCATION MAP REV. [SHEET. 1: OF 1 C.•�S8�PROJX769,3-004dwg�7693-SAS.OWC 02016 T. M. HAYES. R.S. I