Loading...
HomeMy WebLinkAboutEngineered Plan - Rev. 2016INSPECTION PORT FROM CELLAR OR CRAWL SPACE 4" SCHEDULE 1/8 PER PIPE CLEAN SAND 2„ � W'L TESD' TOP. OF FOUNDATION 20 FT. MINIMUM " LAYER OF PUMP S 6 TCI- ES DETAIL DATE OF SOIL TEST MAY 181999 100.00 10 FT. MINIMUM 10 . FT. MINIMUM FROM SLAB 1 /8" TO 1/2" SOIL TEST DONE BY D.B_MASON ELEV. _ _- " WASHED STONE 2 PRESSURE PIPE --- MT.NESSED BY �LAR�QTT�Qjj�2PF� , (ASSUMED) 150 PS! MINIMUM ELEV. = 1Qi.83 �9 OR FILTER FABRIC VENT CONCRETE ES.50_ " p� COVERS MANHOLE QUICK OSS'RVA i yg ION HOLE 1 ELEV.=_ 98.2 COVER UNION TEE FLOW ;7 ��' UNION LEVELERS l Y; �� PERCOLATION RATE _<2 MIN./INCH 1N Cl HORIZON 4" CAST IRON PIPE " AXMAX. + °' ALARM ON 2.59 (OR EQUAL) MINIMUM 11o 0 o G" �1 PITCH 1/4" PER FT. LEVEL 10» ° 7 PUMP ONRL ABEL A1800 FILTE ELEV. = 6" SUMP ELEV. = 95.33 ° - - -- - - _ = ° ELEV. _ _ PUMP OFF z FLOW LINE __98.5 t11 tv, c DEPTH HORIZ TEXTURE COLOR MOTT.. OTHER A LOAMY SAND 10YR5/3 NO IDT. 35 J1120. S CS' �' UT� ' LOC: aS .mst� 10 �� <". .5. 5-26' B LOAMY SAND 10YR6/8 203 SETUCKET ROAD 508- P. 0. BOX 713 385-6900 SOUTH DENNIS, MASS. 02660 26-81" Cl FINE SAND 2.5Y7/3 SCALE 1:" = 20' _ 81-108". C2 MED:/COAR. SAND 2.5Y6/3 98.2 97.78 96.03 91.45 892 BOTTOM OF TEST HOLE ELEV. _ _.�2. _ _MP -3-- = ELEV. BOTTOM OF TEST HOLE Ds 'SIM GALCUa. ,TIO S t� if ELEV. AT INVERT INLET- 940- PUMP CHAMBER CALCULA11ONSNUMBER OF BEDROOMS � ELEV. AT ALARM ON 94_0 : _ GARBAGE DISPOSAL UNIT SEWAGE DISPOSAL SYSTEM PROFILE ELEV. AT PUMP ON _93.7g_ TOTAL ESTIMATED FLOW NOT TO SCALE ELEV. AT PUMP OFF 93_33_ - REQUIRED FLOW PER CYCLE 25 X = �1A GAL. AY X MI. _ _ GAL./DAY 4-0- -- (/CYCLE 110 GAL�' •� ) BOTTOM OF INSIDE PUMP CHAMBER _k2.50 VOLUME PER CYCLE 110 _ GAL/CYCLE /7.48 GAL /CU. FT. = 14_71_ CU. FT./CYCLE REQUIRED SEPTIC TANK CAPACITY _ GAL: BOTTOM OF OUTSIDE PUMP CHAMBER 92.25_ VOLUME OF WATER IN PIPE 3.14 X 0.00694 X 14 FT. = 0_31_ CU. FT. ACTUAL SIZE OF SEPTIC TANK OCL GAL. TOTAL MINIMUM VOLUME PER CYCLE __=,Q.2 CU. FT. - SOIL CLASSIFICATION DISCHARGE 15.02 CU. FT. / 34.67 CU.FT./FT. _ __Q•' . FT. (1090 G.S.T.) DESIGN PERCOLATION RATE <_a MIN./IN. STORAGE CAPACITY (4-4,0GAL /DAY /7.48 GAL./CU.FT./34.67 CU.FT./FT. _ _'1.70 FT, EFFLUENT LOADING RATE _DJ-4 GAL,/DAY/S.F. -119_ REQUIRED _:2Q_ PROVIDED LEACHING AREA _615.0 SQ. FT. (11x47)+(58X2X10/12) BUOYANCY CALCULATIONS: LEACHING CAPACITY (AREA X RATE) _"J1 GAL./DAY 613.66 X 0.74 1000 GALLON PUMP CHAMBER, RESERVE LEACHING CAPACITY _45.4J1 GAL./DAY WEIGHT OF WATER DISPLACED. NOTES: 8.5x4.83x(92.50-92.25)x62IB 5 642 S. WEIGHT OF TANK PER MANUFACTURER 8240 LEIS. 1. ALL WORKMANSHIP AND MATERIALS .SHALL CONFORM TO D.E.P. WEIGHT OF WATER IN SUMP , TITLE 5 AND THE TOWN'S RULES AND REGULATIONS FOR SvL BX4.33Xi012X52.5 1804 LBS. % THE SUBSURFACE DISPOSAL OF SEWAGE. ,TEST / WEIGHT OF CONCRETE � 2. ALL COVERS TO SANITARY UNITS SHALL BE BROUGHT TO D� &X / WITHIN 6 OF FINISHED GRADE. / ; . 1 EXCESS WEIGHT TO OFFSET FLOTATION 3. ALL COMPONENTS OF, THE SANITARY SYSTEM SHALL BE CAPABLE OF / 8240+1804-642 9.402 LBS. WITHSTANDING H-10 LOADING UNLESS ,THEY ARE UNDER OR WITHIN \� \ 10 FT. OF DRIVES OR PARKING AREAS, H-20 LOADING SHALL BE USED UNDER OR WITHIN 10 FT, OF DRIVES OR PARKING AREAS. 4, ANY MASONARY UNITS USED TO BRING COVERS TO GRADE SHALL g �{� BE MORTARED IN PLACE. �` i �• . 5. NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE WITH _ _DEEDED OR ZONING_ REGULATIONS. OWNER / APPLICANT IS TO DETERMINATION FROM APPROPRIATE AU; 10R TY. OBTAIN SUCH DETER (NATIO 6. UTILITIES SHOWN ARE APPROXIMATE ONLY, EXCAVATION CCNTRAC I IS TO CALL "DIG -SAFE" AT 1-868-344-7233 AT LEAST 72 HOURS PRIOR TO COMMENCING WORK ON SITE. 7. CONTRACTOR IS TO VERIFY GRADES AND ELEVATIONS: AS WELL AS 77 SITE CONDITIONS PRIOR TO COMMENCING WORK ON SITE. ANY VARIATION IS TO BE BROUGHT TO THE ATTENTION OF THE DESIGN ENGINEER IMMEDIATELY. 3 %" 8. PARCEL IS IN FLOOD ZONE _ \\ 0� 9. LOT IS SHOWN ON ASSESSORS MAP .r.2� � AS PARCEL 10. PUMP AND ALARM ARE TO BE ON SEPERATE CIRCUITS. 'IS TO BE BOTH AUDIO AND VISUAL w,y.3-'� 11. ALARM 12. A ZABEL A1800 FILTER IS TO BE INSTALLED. 13. AN ELECTRIC PERMIT IS REQUIRED TO WIRE PUMP AND ALARM. 14. ALL UNSUITABLE MATERIAL SHALL BE REMOVED FROM UNDER AND FOR A MINIMUM OF 5' AROUND SOIL ABSORPTION SYSTEM AND BE µ Lor 36 �o / 15, 407 S F. o�����o� so1L _ N TEST 2Ak / REPLACED WITH MATERIAL AS SPECIFIED IN 310 CMR 15.255:(3). 15. PUMP CHAN48ER IS TO 'BE WATERPROOFED AT THE MANUFACTURER. 16. EXISTING LEACHING FIELD IS TO BE PUMPED AND REMOVED ALONG WITH ANY POLLUTED SOILS ENCOUNTERED. APPROVE- D: BOARD OF HEA'LT1-1 DATE AGENT PUMP CHAMBER �\ 98.1 OX. / v ' 0 y SOIL ` �o TEST 1 VENT 98.1 LEGEND. EXISTING SPOT ELEVATION 0010 EXISTING CONTOUR ----00--- - �., t t.0 vi FINAL SPOT ELEVATION 00.0 l FINAL CONTOUR CUD G� SOIL -TEST LOCATION � � ��� /S 7C , J UTILITY POLE -O- TOWN WATER W W ► a�-.._� r r =y CATCH BASIN `f®,� GAS LINE G CLEAN OUT C.O. CESSPOOL C.P. Q ELEV. _ �9T.41 10 �MIN . r v '1 S 8' �O , '� 1,ss. ROUTEQfl28 Z, a v� Q m ^ US SILVERLEAF �.+1m0 0.71 t C 5 - FOR .ts lmm r. IDT. 35 J1120. S CS' �' UT� ' LOC: aS .mst� 10 �� <". .5. D1STR1DUTIOI. 3/8" DRILL SO� ELEV- 6 HIGH CAPACITY INFILTRATORS.- 203 SETUCKET ROAD 508- P. 0. BOX 713 385-6900 SOUTH DENNIS, MASS. 02660 101" 89.78 . WATER ENCO UNTERED AT _-__ ELEV. _ __ - DATEJAN. 18, : 2016 SCALE 1:" = 20' REv, JUNE 6, 2016- GAS BAFFLE HOLE !! y�r1TH STONE IN _ 5.� - :::[SHEET � SOIL : TEST ' ELEV. = 8,.93_ TO BE WATER TESTED 11� X 47' X 10M TRENCH FORMATION WELL TSW 89 WELL MIVI 29 ELEV. _ &3_6_ (TO BE PLACED ON FIRM BASE) A SOIL ADSORPTION `�' ZONE A 12.5 ZONE L3 7.37 DATE OF SOIL TEST MARCH 31,_2016 SWEETSER ENGINEERING 3 CHECK 3/4" TO 1 1/2" INDEX INDEX / r J / SOIL TEST DONE BY . LIQUID DEETH OUTLET TEE,4 _ _ 3 . VALVE WASHED STONE SYSTEM C ADJt�5/1€a ��_ t ADJUST- 157 WITNESSED BY _ YQN HANE (EXISTING) FEET 5 FEET 14 INCHES 2 INCHES /� 1 500 GALLON PUMP MYERS SRM 4 0.4 HP (MAX.) d + � VATION HOLE 2 ELEV =_ 98.75 O OBSERVATION 6 FEET 7 FEET 24 INCHES 29 INCHES (OR EQUAL) u_ SEPTIC ����CH /� S USGS PROBABLE WATER TABLE ELEV. =z.�i_ = ELEV. USGS PROBABLE WATER TABLE WATER ENCOUNTERED AT __95= ELEV.. _ : 90.83_ _ - 8 FEET - 34 INCHES v BER A ® OBSERVED WATER TABLE (5/18/1999) ELEV, _ ELEV. OBSERVED WATER TABLE (3/31/2016) BOTTOM OF TEST HOLE ELEV. _ _.�2. _ _MP -3-- = ELEV. BOTTOM OF TEST HOLE Ds 'SIM GALCUa. ,TIO S t� if ELEV. AT INVERT INLET- 940- PUMP CHAMBER CALCULA11ONSNUMBER OF BEDROOMS � ELEV. AT ALARM ON 94_0 : _ GARBAGE DISPOSAL UNIT SEWAGE DISPOSAL SYSTEM PROFILE ELEV. AT PUMP ON _93.7g_ TOTAL ESTIMATED FLOW NOT TO SCALE ELEV. AT PUMP OFF 93_33_ - REQUIRED FLOW PER CYCLE 25 X = �1A GAL. AY X MI. _ _ GAL./DAY 4-0- -- (/CYCLE 110 GAL�' •� ) BOTTOM OF INSIDE PUMP CHAMBER _k2.50 VOLUME PER CYCLE 110 _ GAL/CYCLE /7.48 GAL /CU. FT. = 14_71_ CU. FT./CYCLE REQUIRED SEPTIC TANK CAPACITY _ GAL: BOTTOM OF OUTSIDE PUMP CHAMBER 92.25_ VOLUME OF WATER IN PIPE 3.14 X 0.00694 X 14 FT. = 0_31_ CU. FT. ACTUAL SIZE OF SEPTIC TANK OCL GAL. TOTAL MINIMUM VOLUME PER CYCLE __=,Q.2 CU. FT. - SOIL CLASSIFICATION DISCHARGE 15.02 CU. FT. / 34.67 CU.FT./FT. _ __Q•' . FT. (1090 G.S.T.) DESIGN PERCOLATION RATE <_a MIN./IN. STORAGE CAPACITY (4-4,0GAL /DAY /7.48 GAL./CU.FT./34.67 CU.FT./FT. _ _'1.70 FT, EFFLUENT LOADING RATE _DJ-4 GAL,/DAY/S.F. -119_ REQUIRED _:2Q_ PROVIDED LEACHING AREA _615.0 SQ. FT. (11x47)+(58X2X10/12) BUOYANCY CALCULATIONS: LEACHING CAPACITY (AREA X RATE) _"J1 GAL./DAY 613.66 X 0.74 1000 GALLON PUMP CHAMBER, RESERVE LEACHING CAPACITY _45.4J1 GAL./DAY WEIGHT OF WATER DISPLACED. NOTES: 8.5x4.83x(92.50-92.25)x62IB 5 642 S. WEIGHT OF TANK PER MANUFACTURER 8240 LEIS. 1. ALL WORKMANSHIP AND MATERIALS .SHALL CONFORM TO D.E.P. WEIGHT OF WATER IN SUMP , TITLE 5 AND THE TOWN'S RULES AND REGULATIONS FOR SvL BX4.33Xi012X52.5 1804 LBS. % THE SUBSURFACE DISPOSAL OF SEWAGE. ,TEST / WEIGHT OF CONCRETE � 2. ALL COVERS TO SANITARY UNITS SHALL BE BROUGHT TO D� &X / WITHIN 6 OF FINISHED GRADE. / ; . 1 EXCESS WEIGHT TO OFFSET FLOTATION 3. ALL COMPONENTS OF, THE SANITARY SYSTEM SHALL BE CAPABLE OF / 8240+1804-642 9.402 LBS. WITHSTANDING H-10 LOADING UNLESS ,THEY ARE UNDER OR WITHIN \� \ 10 FT. OF DRIVES OR PARKING AREAS, H-20 LOADING SHALL BE USED UNDER OR WITHIN 10 FT, OF DRIVES OR PARKING AREAS. 4, ANY MASONARY UNITS USED TO BRING COVERS TO GRADE SHALL g �{� BE MORTARED IN PLACE. �` i �• . 5. NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE WITH _ _DEEDED OR ZONING_ REGULATIONS. OWNER / APPLICANT IS TO DETERMINATION FROM APPROPRIATE AU; 10R TY. OBTAIN SUCH DETER (NATIO 6. UTILITIES SHOWN ARE APPROXIMATE ONLY, EXCAVATION CCNTRAC I IS TO CALL "DIG -SAFE" AT 1-868-344-7233 AT LEAST 72 HOURS PRIOR TO COMMENCING WORK ON SITE. 7. CONTRACTOR IS TO VERIFY GRADES AND ELEVATIONS: AS WELL AS 77 SITE CONDITIONS PRIOR TO COMMENCING WORK ON SITE. ANY VARIATION IS TO BE BROUGHT TO THE ATTENTION OF THE DESIGN ENGINEER IMMEDIATELY. 3 %" 8. PARCEL IS IN FLOOD ZONE _ \\ 0� 9. LOT IS SHOWN ON ASSESSORS MAP .r.2� � AS PARCEL 10. PUMP AND ALARM ARE TO BE ON SEPERATE CIRCUITS. 'IS TO BE BOTH AUDIO AND VISUAL w,y.3-'� 11. ALARM 12. A ZABEL A1800 FILTER IS TO BE INSTALLED. 13. AN ELECTRIC PERMIT IS REQUIRED TO WIRE PUMP AND ALARM. 14. ALL UNSUITABLE MATERIAL SHALL BE REMOVED FROM UNDER AND FOR A MINIMUM OF 5' AROUND SOIL ABSORPTION SYSTEM AND BE µ Lor 36 �o / 15, 407 S F. o�����o� so1L _ N TEST 2Ak / REPLACED WITH MATERIAL AS SPECIFIED IN 310 CMR 15.255:(3). 15. PUMP CHAN48ER IS TO 'BE WATERPROOFED AT THE MANUFACTURER. 16. EXISTING LEACHING FIELD IS TO BE PUMPED AND REMOVED ALONG WITH ANY POLLUTED SOILS ENCOUNTERED. APPROVE- D: BOARD OF HEA'LT1-1 DATE AGENT PUMP CHAMBER �\ 98.1 OX. / v ' 0 y SOIL ` �o TEST 1 VENT 98.1 LEGEND. EXISTING SPOT ELEVATION 0010 EXISTING CONTOUR ----00--- - �., t t.0 vi FINAL SPOT ELEVATION 00.0 l FINAL CONTOUR CUD G� SOIL -TEST LOCATION � � ��� /S 7C , J UTILITY POLE -O- TOWN WATER W W ► a�-.._� r r =y CATCH BASIN `f®,� GAS LINE G CLEAN OUT C.O. CESSPOOL C.P. Q - 1 ETSER ENGINEERING. . C.• SB PRO✓ 7683 00 d:v 7663-SAS.OWG ®2016 SYS r v '1 S 8' �O , '� 1,ss. ROUTEQfl28 Z, a v� Q m ^ US SILVERLEAF �.+1m0 0.71 t C 5 - FOR .ts lmm r. IDT. 35 J1120. S CS' �' UT� ' LOC: aS .mst� 10 �� <". .5. 203 SETUCKET ROAD 508- P. 0. BOX 713 385-6900 SOUTH DENNIS, MASS. 02660 DATEJAN. 18, : 2016 SCALE 1:" = 20' REv, JUNE 6, 2016- SOB No. % : • -LOCATION ' MAP :::[SHEET REV.' . 1 OF 1 - 1 ETSER ENGINEERING. . C.• SB PRO✓ 7683 00 d:v 7663-SAS.OWG ®2016 SYS