Loading...
HomeMy WebLinkAbout307 Old Main Street Kitchen Hood Ventilation (307 Old Main St)GAS VALVE i TABLE RANGE FRY TABLE ' KITCHEN WALL BELOW ( EAST COAST FIRE VENTILATION, INC. HOOD TO BE COVERED BY STAINLESS EQUIPMENT BY OTHERS STAINLESS STEEL WALL WALL PANEL PANELS. PREPARED BY: JC ENGINEERING, INC. EQUIPMENT BY OTHERS 2854 CRANBERRY HIGHWAY SECTION A A ELEVATION VIEW EAST WAREHAM, MA 02538 NOT TO SCALE NOT TO SCALE L i SCALE: AS NOTED DATE: JUNE 16, 2016 i JOB #2941 GENERAL NOTES 1. ALL WORK SHALL COMPLY TO LATEST EDITION OF MASSACHUSETTS BUILDING CODE (8TH ED.) NFPA 96, 17A AND INTERNATIONAL MECHANICAL CODE. IRE SUPPRESSION WALL SHUTTER WALL SHUTTER 2. EXHAUST AIR DUCT WELDED LIQUID TIGHT. REMOTE PULL to" Mw STATION 3. CONNECT FIRE SUPPRESSION SYSTEM TO BUILDING 3" INTERNAL STANDOFF FIRE ALARM. r--318"x112"ALL THREAD ROD 1"'(L) X 54"(D) X 24"(H) i i CONNECT TO ROOF JOIST ANSUL R-10215 GALLON FIRE ---- SIS EXHAUST HOOD i i THROUGH MOUNTING ANGLES SUPPRESSION SYSTEM: c c CONTROL SEQUENCE TOTAL FLOOD SYSTEM U.L. LISTED INCANDESCENT CLEANOUT LIGHT FIXTURE -HIGH TEMP - FIRE SUPPRESSION IN ACTIVATION N ASSEMBLY UNDER HOOD - TCLBR KEEP RUNNING. pil ERFORATED SUPPLY PLENUM 3/8"x1/2" HEAVY - INLINEIL-G10 CLOSE. DUTY NUTS. - GAS VALVE SHUT OFF. ht2'–I ONE ABOVE - BUILDING FIRE ALARM ACTIVATE. i AND ONE - ELECTRICAL UNDER HOOD SHUT DOWN. BELOW O O it } KITCHEN } FAN SCHEDULE PLAN VIEW HOOD SUPPORT ANGLEBAR DETAIL 1. TCLBR TUBULAR CENTRIFUGAL BELT DRIVEN 2,760 CFM, 1.0"H20 W.G. E.S.P., 230V, THREE PHASE, 1.5 HP NOT TO SCALE NOT TO SCALE MOTOR WITH 2" DRAIN & 2 CLEANOUT DOORS 180° APART. 2. INLINEIL-G10 INLINE SUPPLY UNIT WITH G10 BLOWER IN SIZE Al PARTIAL FLOOR PLAN: KITCHEN HOOD VENTILATION HOUSING: 2,208 CFM, 0.50"H 20 W.G. E.S.P., 208V, AND FIRE SUPPRESSION THREE PHASE, 1.5 HP MOTOR. SYSTEM �►�'t""r�i, 01 �111 OF � F� cym NOZZLE SCHEDULE JOkNl, RCNILL JR, IVIL .418 F 1TE DUCT- (1) 2 FLOW NOZZLE PLENUM - (2) 1 FLOW NOZZLESDate II fessional En e SURFACE EQUIPMENT (11) - 2 FLOW NOZZLES i TCLBR TUBULAR CET KITCHEN HOOD VENTILATION FA 16" -DIA 16 GAUGE INLINE EXHAUST FAN WELDED EXHAUST DUCT 0" CLEARANCE DUCT FIRE WRAP AND FIRE SUPPRESSION CLEANOUT ❑ AND TCLBR EXHAUST "IT INLINEIL-G10 SUPPLY UNIT 2F 16" -DIA INSULATED SUPPLY AS -BUILT PLAN 144"(L) X 54"(D) X 24"(H) DUCT AND INLINEIL-G10 SUPPLY UNIT 16" -DIA 16 GAUGE 16" -DIA INSULATED SUPPLY AIR DUCT S/S EXHAUST HOOD WELDED EXHAUST DUCT :IE AT HANGwcANGLE a 5e CEILING CULTURAL CENTER OF CAPE COD TO REMOTE1F 1F STAINLESS STEEL PERFORATED PANEL 307 QLD MAIN STREET PULL STATION C3600— 360°-360°-360"-360° FUSABLE LINK LINE 20 U.L. LISTED INCANDESCENT LIGHT SOUTH YARMOUTH, MA t i (ALL 2 FLOW) 3" AIR SPACE FIXTURE -HIGH TEMP ASSEMBLY ANSUL R-10215 GALLON FIRE SUPPRESSION SYSTEM: i 2F 2F 2F 2F 2F 2F 2F 2F 2F 2F 2F i I i DOUBLE 5/8' FIRE RATED SHEET I SPRAY NOZZLES � I 16 SS BAFFLE WITH HANDLES AND HOOK " PREPARED FOR: TOTAL FLOOD SYSTEM ' I 38" �` �� t6" 1 ROCK OR EQUIVALENT MATERIAL i NOTE: BY OTHERS) GREASE DRAIN WITH REMOVABLE CUP GAS VALVE i TABLE RANGE FRY TABLE ' KITCHEN WALL BELOW ( EAST COAST FIRE VENTILATION, INC. HOOD TO BE COVERED BY STAINLESS EQUIPMENT BY OTHERS STAINLESS STEEL WALL WALL PANEL PANELS. PREPARED BY: JC ENGINEERING, INC. EQUIPMENT BY OTHERS 2854 CRANBERRY HIGHWAY SECTION A A ELEVATION VIEW EAST WAREHAM, MA 02538 NOT TO SCALE NOT TO SCALE L i SCALE: AS NOTED DATE: JUNE 16, 2016 i JOB #2941