Loading...
HomeMy WebLinkAboutApp-Permit-Construction41 1 YARNAOU I-, HEALTH DEPT. No.—GU-33a 1146ROUTE 23 FEE F.- SO. YARMOUTH, MA ®2664' COMMONWEALTH Of MASSAC14USETTS Board of Health, , MM. APPLICATION FOP, DISPOSAL SYSTEM CONSTRUCTION PERMIT Application for a Permit to Construct( ) Repair Upgrade( ) Abandon( ) - ❑ Complete System Individual Components Location 5'-( -SI /Y/Zt Ctdff2j,� S� �jrf/P Owner's Name do? 0V S F Map/Parcel# 4-141 Address Aj i/PCVV Y 2�,e Sc ,JO Lot# A/0 Telephone# f Q r. g 7 L Installer's Name 4 1F l A-1CQ Designer's Name Address 3S' pw* 5 r ftp Address Telephone# % 7 S - A i0 p Telephone# Type of Building b a 'ol g k Lot Size sq. ft. Dwelling - No. of Bedrooms Garbage grinder ( ) Other - Type of Building No. of persons Showers ( ) , Cafeteria ( ) Other Fixtures Design Flow (min. required) gpd Calculated design flow Design flow provided gpd Plan: Date Number of sheets Revision Date Title Description of Soil(s) Soil Evaluator Form No. Name of Soil Evaluator Date of Evaluation DESCRIPTION OF REPAIRS OR ALTERATIONS I Alt C h.4ti4- F '7i3A-/1C -7o' .4/7 - The undersigned agrees to install the above described Individual Sewage Disposal System in accordance with the provisions of TITLE 5 and further agrees to not to place the syste m operation until a Certificate of Compliance has been issued by the Board of Health. Signed Date Y--d.0-7r Inspections (� ^� (� N� No. FEE O �3) �: COMMONWLALT1®F MASSACHUSETTS ETTS Board of Health, MA. CERTIFICATE OF COMPLIANCE Description of Work: Individual Component(s) ❑ Complete System The undersigned hereby certify that the Sewage Disposal System; Constructed ( ), Repaired (k, Upgraded ( ), Abandoned ( ) by: ' g/? C14tiCa 350 /Y/f9/v ST LV - r ,V at .s V- S G ,12 F iP Cy R Y/'i S G K4 /e has been installed in accordance with the provisions of 310 CMR 15.00 (Title 5) and the approved design plans/as-built plans relating to application No. )-- , dated gyp_ "t Approved Design Flow (gpd) Installer 37-3- Designer: Inspector: Date: The issuance of this permit shall not be construed as a guar, tee that the/system will function as designed. No. `? 611- 3 �S FEE Board of Health, r�c.�/` ' MA. DISPOSAL SYST & CONSTRUCTION PERMIT Permission is herebygranted to; Construct( ) Repair(j() Upgrade( ) Abandon( ) an individual sewage disposal system at S y - 56 I)Y Flf Cy R Y --7) P S a ��4 as described in the application for Disposal System Construction Permit No. 3 dated `/ . Provided: Construction shall be completed within three years of the date of this permit. All local conditions ust be met. Form 1255 Rev. 5/96 A.M. Sulkin Co. Boston, MA Date Board of Health