SEPTIC: SYSTEM DESIGN
FLOW ESTIMATE
BEDROOMS AT 1 �� GAL/DAY/BEDROOM - GAL/DAY
r .
SEPTIC TANK
Y�Q GAI/DAY x 2 DAYS - GAL
USE GALLON SEPTIC TAMCC?F,�TlIS? IOOQ �)
So I -C AL oRPT I ON -SYSTEM - -
S I DE AREA: ZV
BOTTOM AREA:
!TIC SY';TFM gFrT I nN
DATE
SEPTIC TANK
1107
"Varmoutli Hen1th�1�Tzpartment
A?PRO �J1i'JD-
7-1,41
Rate
HEALTH AGENT
1) The installation shall eornp,� Willi Title V turd Town of �KVNN Board ot.
Ileallh Regulations.
2) The installer shall verify the location of utilities, sewer inverts and septic
components prior to installation and setting base elevations.
3) All gravity septic piping to be 4 inch Seh 40 PVC at 1/8" per foot. The first
two feet out of the d -box to the ic-8ehing shall be level.
4) This plan is not to be utilized for property line determination nor any other
purpose other than the proposed system installation.
5) All septic components must meet Title V specifications.
6) Parking shall not be constructed over II10 septic components.
7) The property is bounded by property corners and property lines.
8) The property owner shall review design considerations to approve of total
design flow and number of bedrooms to be considered for design. Receipt
of payment for the plan and installation based on the plan shall be deemed
approval of the design flow by the owner..
9) The existing leaching or cesspools shall be pumped and Filled with material
per Title V abandonment procedures. Those within the proposed SAS shall
be removed along with contaminated soil and replaced with clean sand per
Title V specs.
10) System components to be 10 feet from water line. Sewer lines crossing the
water line shall be sleeved with 4 inch SCI 140 PVC with ends grouted if
applicable. The proposed SAS is being installed below the water service
line. The line is to be sleeved as aforementioned and maintained in place.
11) If a garbage grinder exists it is to be removed and is the responsibility of the
owner to ensure such.
12)The installer is to take caution in excavation around the gas line if such
exists.
13) Tae installer shall verify the location, quantity and elevation of the sewer
lines exiting the dwelling'prior to the installation.
14)This plan is representative only that a system can tit on a property meeting
Title V requirements.
/ 410fiill4S&
DAV
o tD �
I a MA�Q'�
m .
No. 1066;
14
ac@[E0W D
MAY 2 4 2016
HEALTH DEPT...
SITE AND SEWAGE PLAN
LOCATION: _4,41 alb&VCDC PMD
ls�F1�TMIA
PREPARED FOR: �llj5L/'^ �(
SCALE: l' - 0
DAVID B. MASON ?b DATE: I
DBC ENVIRONMENTAL DESIGNS
EAST SANDWICH. MA
(508) 833-2177
? - t