Loading...
HomeMy WebLinkAboutEngineered Plan - 2016LOCATION MAP Do 0 0 a Lu a 5 Z z ASSESSORS MAP:�� t, TEST HOLE LOGS PARCEL: } FLOOD ZONE: SOIL EVALUATOR: A. � WITNESS: REFERENCE:DATE• L��t , PERCOLATION RA f E : � 1� Env. AIL vs LOW 6 .10 / 1�0 /n I It ,, I d0 •too ' PY 40-A 000 A0 o it - V T//, foo �0 0 up 12 ►` �t ir--y�,�111J 1 SEPTIC: SYSTEM DESIGN FLOW ESTIMATE BEDROOMS AT 1 �� GAL/DAY/BEDROOM - GAL/DAY r . SEPTIC TANK Y�Q GAI/DAY x 2 DAYS - GAL USE GALLON SEPTIC TAMCC?F,�TlIS? IOOQ �) So I -C AL oRPT I ON -SYSTEM - - S I DE AREA: ZV BOTTOM AREA: !TIC SY';TFM gFrT I nN DATE SEPTIC TANK 1107 "Varmoutli Hen1th�1�Tzpartment A?PRO �J1i'JD- 7-1,41 Rate HEALTH AGENT 1) The installation shall eornp,� Willi Title V turd Town of �KVNN Board ot. Ileallh Regulations. 2) The installer shall verify the location of utilities, sewer inverts and septic components prior to installation and setting base elevations. 3) All gravity septic piping to be 4 inch Seh 40 PVC at 1/8" per foot. The first two feet out of the d -box to the ic-8ehing shall be level. 4) This plan is not to be utilized for property line determination nor any other purpose other than the proposed system installation. 5) All septic components must meet Title V specifications. 6) Parking shall not be constructed over II10 septic components. 7) The property is bounded by property corners and property lines. 8) The property owner shall review design considerations to approve of total design flow and number of bedrooms to be considered for design. Receipt of payment for the plan and installation based on the plan shall be deemed approval of the design flow by the owner.. 9) The existing leaching or cesspools shall be pumped and Filled with material per Title V abandonment procedures. Those within the proposed SAS shall be removed along with contaminated soil and replaced with clean sand per Title V specs. 10) System components to be 10 feet from water line. Sewer lines crossing the water line shall be sleeved with 4 inch SCI 140 PVC with ends grouted if applicable. The proposed SAS is being installed below the water service line. The line is to be sleeved as aforementioned and maintained in place. 11) If a garbage grinder exists it is to be removed and is the responsibility of the owner to ensure such. 12)The installer is to take caution in excavation around the gas line if such exists. 13) Tae installer shall verify the location, quantity and elevation of the sewer lines exiting the dwelling'prior to the installation. 14)This plan is representative only that a system can tit on a property meeting Title V requirements. / 410fiill4S& DAV o tD � I a MA�Q'� m . No. 1066; 14 ac@[E0W D MAY 2 4 2016 HEALTH DEPT... SITE AND SEWAGE PLAN LOCATION: _4,41 alb&VCDC PMD ls�F1�TMIA PREPARED FOR: �llj5L/'^ �( SCALE: l' - 0 DAVID B. MASON ?b DATE: I DBC ENVIRONMENTAL DESIGNS EAST SANDWICH. MA (508) 833-2177 ? - t