Loading...
HomeMy WebLinkAbout83-678 - Site PlanTOP OF FOUND. EL' 10 TT MIN., 20 FT CONCRETE COVERS MIN. 4' SCH. 30 PVC CLEAN SAND PIPE- MIN,PITCH flt 1/8" PER FT 4 11 CAST IRON /EQUAL I 12�'MAX. PRECAST FLOWDIFFUSOR 2"" �AY�R OF PIPE - MIN. PITCH 8' 1/ -1/2, WASHED 1/4" PER FT STONE 77 FLOW LINE EL.= 9.0 10 4 MIN. 19 EL= 94 6 EL= EL.= 02.4EL. as o C3 E::' ED 1-1 E3 C:3 EL.= 90.1 = 92.2 tzL rm E= m C3 EL.= EL.= DIST 3/4'- 1 1/2" BOX WASHED STONE AVG EL.- S4.5 1000 GAL. SEPTIC GROUND WATER TABLE EL. 8-5.1 TANK rC L 4� 3 No ra,�-2 c -o N PROFILE OP JI A KEZ� TO. ON t-, tPA L:Eti 15HIC\U. e)e_� SEWAGE DISPOSAL SYSTEM ANP -!)HALL. fZ.EIlA\IN UKI-riL NOT TO SCALE ALL GU-r7f_�F,-_� :�)H/&,Lt- L_r-A�) �70 1?0v04-_5f?_--_)L4-j�� ANP J ALL POY4N:f;Jr0l,� C, LE4'1::7 • DESIGN CALCULATIONS NUMBER OF BEDROOMS ........................ SOIL TEST GARBAGE DISPOSAL UNIT... ............. ......... DATE OF SOIL TEST -4 ill -51A 4� - L 0-4 TOTAL ESTIMATED FLOW WITNESSED BY J GAL/BR./DAYx 3 BR.) .......... 3S GAL./DAY PERCOLATION RATE �_2 MIN./ INCH REQUIRED SEPTIC TANK CAPACITY.__. OBSERVATION VATION HOLE I OBSERVATION HOLE 2 % ACTUAL SIZE OF SEPTIC TANK ................... 1 GAL. ELEVATION LEACHING AREA REQUIREMENTS 0 ELEVATION -0 SIDEWALL AREA L7 GAL,/S. F. BOTTOM AREA GAL. /S. F. LEACHING CAPACITY (BOTTOM SIDEWALL) GAL. 36_ RESERVE LEACHING .CAPACITY.....: ........... �qA­0 GAL. m5P. Fii,�E SA1v 4_1 NOTES 1. ALL WORKMANSHIP. AND MATERIALS SHALL CONFORM )jjA 1-k r TO D. E, 0. E. TITLE 5 AND THE + TOWN OF V6VJvQV-rH w RULES AND REGULATIONS FOR SUBSURFACE DISPOSAL r7 4, �x OF SANITARY SEWAGE 2.COMPLIANCE WITH :ZONING REGULATIONS SHALL BE ELL DETERMINED BY BUILDING INSPECTOR OR BUILDING �BUILDING SETBACK REGULATIONS PER BUILDING COMMISSIONER INSPECTOR , OR BUILDING COMMISSIONER MIN. FRONT SETBACK 312' t us 3.EXISTING AND FINAL GRADES SHALL REMAIN ESSENTIALLY > 7 MIN. REAR SETBACK THE SAME o m, ;�roNk tOl5l 4. ALL COMPONENTS UNDER OR WITHIN 10 FEET OF, PRO J NJ ;of PROPOSED MIN. SIDE SETBACK DRIVE SHALL BE CAPABLE OF WITHSTANDING H -20 LOADING. APPROVED.: BOARD OF HEALTH 5 0 DATE . AGENT PROJECT LOCATIONt iAA. k. Aa L OT *-A 3 ki> VAtAAOU 't! w(pr ev-yc�e PATH APPLICANT: -r'ON I4t4lZKtZ'-I - 04 - SEr LEGEND DR By:, xe f5o. �Z,J.4 SCALE DATE: rc L 60*wl�s PUFLIC •4 EXISTING SPOT ELEVATIONS 00 xor JOB NO. APPO. 'BY; EXISTING ------ OF44" j CONTOUR 00 to FINAL' SPOT ELEVATIONS "0 t o T�ICHARD RICHARD R, OrHEARN 'pr -DRAWING JAMES FINAL' CONTOUR JNC ITE AN N-. 494 , J:?v REG. SURVEYORS SA HEAR Z7, 4AIVO SURVE REG. SOIL TEST L06ATION _�1348 ;`ROUTE 134 -P 0. 1 Box 1416.3 NO. SCALE- -EAST,- DEW1111, MASS OF