Loading...
HomeMy WebLinkAbout83-719 - Site Plan (2)I I t i - MANHOLE CO'rER BROUGHT TO FINISH GRADE A aDATA. .. NOTES: SOIL TEST PIT DATA g•_' • -- �.� y,,, _� � - 21 I)DISTRIBUTION Box TO VdTHSTAND H-10 " - 1 1 Y MIN --.1 - LOADING UNLESS UNDER PAVEMENT. DRIVES C INDICATES covER s r------1 I1 ; INDICATES OBSERVED _ate a ' 1 OR TRAVELED WAYS WHEREBY H-20 LOADING] --- , . ' / , I a i • • IF `i -J - r „ , - -' - �1 1 SHALL APPLY. ' E PERC 'q GROUNDWATER •------------------------- ,/ Lr , ._ a' INLET ,i t ' AS : ' • �. 1 _ 1 -I _ • -... ice'" LTEE ' 1 15 SLOPE NOF INLET PPE EXCEED 0.08 EFT/FT • .: ! •.. .�• ti •fj( n-� hA� ,E �. ( TEST ;. _ .. I � I - � _ _...1-.-- _ ` . �i lrya Brox tq j � ! OR 1F A PUMPED SYSTEM. PEASTONE 4 -4 -� - - _ 10� 1 { TP NO. 7 TP NO. I -- PRECAST, STEEL - 1 , 5;-0` r. 4 3" I Iii , 6' L -- -{ - OISIRIBU'ON FEET TO BE WDTLEVEL. E e e " OF PIPE OF O o -6:L I 0 4 PERFORATED GRD: £L REINFORCED I u •'- 5 v r e ° OD. e oe P.V.C. PIPE ?2.4 GRD. ,EL - _ LAN ✓I_JJ 4)RECOMMENDEa MANUFACTURER- 6 e ° ° e Y ° -- SEPTIC TANK - 4'-6` ,r INLET • • ounET ROTUNDO OR APPROVED EOUAL 0 3/4 - 1-1 /2 DIA. o GW. EL 17- 4 GW. EL 1 i 1 4 -o MIN. �. OO I i %; I TEE UQUID DEPTH TEE i,i o e e SASH STONE ee e o I --- _�_--_-- 8' MIN. 3/4TO 1 -1/2 -STONE ,.; 2" r -REMOVEA.BLE COVER e L�us TOPSOIL- •- r=z 1 OIL _ _ _} 1' 1 I 1 & 1 _L 'r1 , iii > i j a ' • r ' ' 1 a r `' r �J _ r 5' OIA. OUTLET(S) 5� DIA INLET ` o a---ul-�----. - - ' ' ' Ls-�-o r 2.5 ! PROVIDE A v 2 SUBSOIL 2 24 DIA. MANHOLE COVER 80TTOM ON LEVEL STABLE BASE • : p Lam. VATERncHT ( 4 v . . R.• T?!. z ' PLAN VIEW -¢�`�* 'ti,•�, - y�, tip• ' �n • . JOINTS (TYP) I 3 4' INLET [, 1 I " ° • 2" OF 1 /8`-1 /2" IQ 4 4 NOTES CROSS SECTION MEW 1I 9.,5` t?�- +•iouTLEr - 1 I r r PEASTONE " 5 g 1) SEPTIC TANK TO WITHSTAND H-10 LOADING 3) INLET AND OUTLET TEES TO BE CAST IRON, 1� y a�: �- --�� ° o ° DROWN UNLESS UNDER PAVEMENT, DRIVES, OR TRAVELED SCHEDULE 40 PVC OR CAST -IN-PLACE CONCRETE. w a� STABLE - , ,•,•• 14" r ` e 6 MEDIUM 6 WAYS, WHERE BY H-20 LOADING SHALL APPLY. TEES TO BE CENTERED UNDER MANHOLE COVER. �„zE,=,,tt'-fi�Q-;,t, BASE MIN, o ° e r 6' MIN. 3/4' TO e � ° o 7 SAND 7 2) ALL PIPE CONNECTIONS AND CONCRETE CON- CROSS SECTION VIEW 1-1/2' STONE e B STRUCT10N TO BE WATERTIGHT. DISTRIBUTION BOX DETAIL 1.42' LOCUS MAP SEPTIC TANK DETAIL NO. OF GALLONS: 1000 EFFECTIVE • Q 9 NOT TO SCALE (H-20) NOT TO SCALE 2'-0` DEPTH SCALE: 1wm2083* 12.4 10 DESIGN ANALYSIS P 11 11 SECTION A - A DESIGN FLOM TYPICAL LEACHING TRENCH 3 BEDROOM AT 110 G.P.D. Q 330 C.P.D. nn ATF- ('Rll. , .1C►68 ., DATE, - NOT TO SCALE - ��'m;11. MICttNICYVICZ„ TE. RYA SEPTIC TANK REQUIREMENTS: 330 X 1507 - 495 GAL 1MTNrf..Ftl fir: VATNrn1_TD DY EXPLANATION OF GROUNDWATER RiJID(NGS/USGS USE 1000 GAL (H-20) �t+ LEGEND HiGH GROUNDWATER CALCULATIONS/ONSITE SEWAGE DISPOSAL SYSTEM DESIGN 1117131 PAIL:PCRC RATE. �� gym. PROPOSED CONTOUR -�-L LOT 13 STARBUCK LANE . MIN, Nql .-L-.----- MIN. ICN` g' SPOT EL.(EXISTING) (2J X 2) Prior design was based an combination of maximum high observed A /I groundwater In Immediate area (in this case Lot 12 Wadsworth Lane at 14.3' - higher readings south of stream) with USGS /' S 33ro9 correction for lesser Zone - Zone D instead of Zone C. 1953C1 Highest groundwater therefore 14.3 + 1.5 = 15.13'. LEACHING FACILITY REQUIREMENTS: Present design meets prior design criteria. Table 1 data DESIGN PERC. RATE 2 MIN./IN, t column shows recently verified high groundwater at site with 330 G.P.D. / 1986 readings. Highest recorded groundwater elevation at site Is from April 1986 at 12.4 feet. U.S.G.S. high groundwater • calculations for higher Zone (Zone C), is 3.4.Highest groundwater used therefore 12.4 + 3.4 = 15.8'. iD Present design shows septic design base at 19.8' elevation AAc LP which complies with the 4 foot Title 5 separation requirement. �0s TABLE 1 LEACHING FACILITY PROVIDED I FOR TOPOGR HIC AND EXISTING CONDITIONS e�A'O� LIMIT OF WETLAND VEGETION GROUNDWATER MONITORING PROJECT DETAILS SEE PLAN BY THE BSC GROUP PREPARED ib" � LOT 13 STARBUCK LANE, YARMOUTH 35' LONG X 2' WIDE X 1.42' DEEP TRENCH k FOR LEEWARD RUN DEVELOP. CO. DATED MAY 9, 1986 DATE OF TOP OF DEPTH TO WATER sInF AR A=1 5 _F_ X 5 ..P -D-=115911, PA 'r AND FiNAL REVISION OF 10/30/86. OBSERVATION _ PIPE WATER ELEVATION BOTTOM AREA=70 S.F. X 1.0 G.P.D.= 70G.P.D. o o �'� �Ck x 9/15/86 15.96 4.20 11.76 TOTAL=332 G.P.D. c a N. hpDOi 4%02%86 15.96 3.60 12.4 15.96 4.80 11.2 332 G.P.D. 330G.P.D. rrturwcu DRYWELL 1x 4/10/90 16.00 3.80 12.2 N 4/20/90 16.00 4.00 12.0 NOTES ,; p RQM 4"PVC (TYR) r * 5/29/90 16.00 3.85 12.15 r �fCCJNG `n s; 5/31/90 16.00 3.87 12.13 PROPERTY LINES SHOWN HEREON WERE COMPILED 0.F=2s PROPOSED Z FROM A PLAN RECORDED AT THE BARNSTABLE YWELL S 21'4010 - E s Updated readings from BSC file information and field COUNTY REGISTRY OF DEEDS IN PLAN BOOK 331 O' 52.59 Witnessed checks. PACE 40 AND DO NOT REPRESENT AN ACTUAL W 4 ss Witnessed by Board of Health Agent SURVEY ON THE GROUND. a 1000 `s D -80X1 �E �O UNLESS OTHERWISE NOTED, ALL CONSTRUCTION SEPTIC TAN •xi S25- 4p10 is METHODS AND MATERIALS SHALL CONFORM TO R�151.66' 27.42' yo" E TITLE 5 OF THE STATE ENVIRONMENTAL CODE L�39 3' �k S 26 S 09 40y AND ANY APPLICABLE LOCAL REGULATIONS x 1 D• `� \ PROPOSED GRAVEL DRIVE B.M. LEACHING TAG SOLT903 TRENCH EEL. HYDRANT2.T Sr�l�eUC x.01 �1 , k INVERT ELEVATIONS °F � y\ a I DoE P�a4ic) o MPH COL'per HraFtO1M' U µc N 4" INVERT AT BUILDING 22.48 \ afcrstfa�° / PLAN VIEW of ro 22.08 SCALE:1 P=20'291 kr 4 INVERT AT SEPTIC TANK (IN) 4" INVERT AT SEPTIC TANK (OUT) 21.83' -4 - 199D e INVERT AT DIST. `BOX (IN) 21.72' 4" INVERT AT DIST BOX (OUT) 21.52' INVERTS AT "LEACHING FACILITY: �- 10' �- 4• 8, ' 4" INVERT AT. BEGINNING OF LEACHING FACILITY 21.40' MANHOLE A40 COVER BROUGHT TO FINISHED GRADE FINISH GRADE SLOPE _ .005 FT./FT. 4 INVERT AT END OF 4` P.v.0 FIRST TWO FEET To LEACHING FACILITY 21.22' SLOPE=.02 FT./FT. (7YP) BE LAID LEVEL 21.83 21:52 4` PERFORATED P.V.C.-�� 21.40 L----------------1 16.s0 4" INVERT AT BOTTOM , SEPTIC TANK` OF LEACHING FACILITY 19.8 TO BE INSTALLED ON A r -LEVEL & STABLE BASE OBSERVED GROUND WATER ELEVATION 12.4' INDEX WELL AiW 23'0, RANGE ZONE C . SYSTEM PROFILE ADJUSTMENT = 2.5' - NOT TO SCALE - DESIGN BASED ON A 1.5' ADJUSTMENT DUE TO DAMPENING EFFECT OF THE WETLANDS. BASED ON PRIOR REVIEW OF . HYDROGEOLOGIC INFORMATION AND APPROVAL OF HEALTH AGENT. . 55.26 0 E Sg'g2. GROUT AND SEALS TO BE USED Al ALL POINTS WHERE PIPES ENTER OR LEAVE ALL CONCRETE STRUCTl1RES iN ORDER TO PROVIDE A WATERTIGHT SEAL ALL SHIPLAP JOINTS IN SEPTIC TANK SHALL BE SEALED UMTH NEOPRENE GASKETS OR ASPHALT CEMENT TO PROVIDE A WATERTIGHT SEAL ALL PIPES IN THE SYSTEM SHALL BE SCHEDULE 40 OR EQUAL WASHED CRUSHED STONES SHALL BE FREE OF ALL y� DiRT, DUST, AND FINES. .C.V HEAVY EQUIPMENT SHALL NOT BE ALLOWED TO CIO CU OPERATE OVER THE LIMITS OF THE SEWAGE DISPOSAL SYSTEM DURING THE COURSE OF CONSTRUCTION. 2 ^ NO FIELD MODIFICATIONS TO THE SEWAGE DISPOSAL SYSTEM SHALL BE MADE WITHOUT PRIOR WRITTEN APPROVAL OF THE ENGINEER AND THE LOCAL BOARD OF HEALTH. THiS SYSTEM SHALL BE INSPECTED AS REQUIRED BY SECTION 2.10 OF TiTLE 5. A CERTInCATE OF COMPLIANCE AS REQUIRED. BY SECTION 2.8 OF TiTLE 5 MUST BE OBTAINED BY THE CONTRACTOR UPON COMPLETION OF THE ABOVE WORK. IF AN `ASBUILT PLAN' IS REQUIRED DUE TO CONTRAC- TOR DEVIATING FROM THESE PLANS, WORK FOR SUCH PLANS SHALL BE COMPENSATED BY THE CONTRACTOR. BREAKOUT- CACULATIONS THiS SYSTEM IS NOT DESIGNED FOR A GARBAGE DISPOSAL UNIT. (SECTION A -A SEE PLAN VIEW) EL= 23.5 A VARIANCE FROM SECTION 3.7 OF THE TOYN OF 21' -- YARMOUTH HEALTH REGULATIONS IS REQUIRED FOR I FINISHED GRADE THE CONSTRUCTION OF THIS SYSTEM. SLOPE =.076 FT/F.T. ALL UNSUITABLE MATERIAL (TOPSOIL k SUBSOIL) - TOP OF PEASTONE EL.21.9 TO BE REMOVED FOR A DISTANCE OF 10' AROUND EL2L83 -- - - : LEACH TRENCH AND REPLACED WITH CLEAN OF LEACH TRENCH COARSE SAND. BOTTOM OF FOOTING TO BE EL: 17.8 MIN. 150'x .076 = 11.4' 11.4 < 21" Revisions DAZE DESCI"S''DON 712-90 REDUCE SIZE OF FOUNDATION, INVERT AT BUILDING Refemeeir BSC PLAN EN117LED '«r7VAC17 DISPOSAL SYSTEM DErN I.OT 13 ON STARBUCK LANE IN YARM0111111, MASS." AS REM7M 10/30/Tin Project Title: LOT 13 STARBUCK LANE YARMOUTH, MAO PRIPARED FM LEEWARD RUN DEVELOP. CO. A.M. Wilson Associates Inc. 911 Lod 1 Slut Odm+ICe/BA 0z= 503428-14M Drawing Title: SEWAGE DISPOSAL - SYSTEM D GN PVSN O: EGgc .yl1rIRCTW G� If�EQ� v AMITP�a� Scale: 1"` AS NOTED 0 FEET Date: 5-25-90 Dwg No: Sheet 1 of 1 Design- CRJ/ PRF Check Drawn: J.V.B. Job No: 2.0473.0