Loading...
83- 819 - Site PlanLOCUS MAP Not to Seale Lc P - PT E = EX�At IS1 on! lel N o-c� TN15 s-rR UFHti__� FF HIGH BANK ( PUBLIC - 401 WIDE) ROAD DESIGN CRITERIA DESIGN FLOW 9gf-vI10(1/0, 49n 6j� REQUIRED SEPTIC TANK /- 1I9OXLS/ = V�O GAL. SEPTIC TANK PROVIDED = 000 GAL. SIZE OF LEACHING FAC1 1TY REQUIRED DESIGN PERC. RATE - MI WINCH 4P42v1 rG . 11 11 SIZE OF LEACHING FACILITY PROVIDED cc cx Ou SEPTIC TANK DETAIL NOT TO SCALE NOTES :I SEPTIC TANK SHALL BE 4 INLET AND OUTLET TEES TO BE CAST IRON OR REINFORCED CONCRETE. SCHED 40 PVC 2 SEPTIC TANK TO WITHSTAND H-10 LOADING TO BE CENTERED UNDER MANHOLE COVER UNLESS UNDER PAVEMENT, DRIVES OR TRAVELED WAYS,WHEREIN H-20 LOADING SHALL APPLY. 3 ALL PIPE CONNECTIONS AND CONCRETE MANgOLE COVER TO CONSTRUCTION TO BE WATERTIGHT WITHIN 12 OF FINISH GRADE oh Tris /i r I/ 2 WATER LEVEL 15 I t I � INLET TEE c1l) PRECAST Ir 4'(a OUTLET SEPTIC li 5'(p" LIQUID DEPTH TEE 'i TANK — I 1 I I 1 1--_---_ _—_----_---_I oq BOTTOM ON LEVEL STABLE BASE � N=-mahl% nlE got ulg PLAN VIEW CROSS-SECTION VIEW LEACHING PIT DETAIL NOT TO SCALE MANHOLE COVER TO WITHIN 12"OF FINISH GRADE. IF IN PAVED AREA BRING COVER TO GRADE WITH- LOAM8SEED CAST IRON COVER 8 FRAME 2 N OF I/d WASHED 12"MIN. FILL STONE / / • yi: JA •°r �.'. e$tti �SaBJ.ri;: h o� PVC INLET PIPE 0 a o 0 0 0 0 0 0 4° oDo 0 0 0 0 0 0 0 NOTE: `0� y6t °' LEACHING PIT TO w D o 0 0 0 o 0 00 "D ° WITHSTAND H-10 LOADING UNLESS UNDER _ PRECAST / PAVEMENT DRIVE OR a0 3/4°TO I-I/2"_D o 0 0 0 0 13 o D0• �` TRAVELED WAY WHEREIN DOUBLE LEACHING P17.. „ eo H-20 LOADING SHALL APPLY Lu WASHED LL STONE :i plc w (n0 finest 0 0 0 0 0 0° ❑ o 0 0 pq , p O 0 0 a °° R6D Tj ��0000 00000 c °Lb IE O D nZ�+ L- 0 � ICo �I DIAu 6 MIN. IQ � DIA CROSS - SECTION DISTRIBUTION LINE DETAIL /Q,/A. NOT TO SCALE FINISH GRADE CROSS-SECTION VIEW SOIL TEST PIT DATA PERK '0'N'='U TEST GROUNDWATER TP TP TP TP GRD. EL. GRD. EL GRD. EL - GW. EL GW EL GW. EL SaNI� 12°MINIMUM COVER 2 1/8"=3/8" STONE DISTRIBUTION LINE flood' aD" OO O O 3/4•-11/2 STONE Ds. O� c0 ° 1 OD WATER IN GROUND PROFILE VIEW �• -'*ay^ o s Io20 40 g ®FORGE 4P RIANRgANCIS I�C , EN - o REEKIE "' INV 9U 1p 95 t CIVILo A- GRAPHIC SCALE ,� � QtLT£ DRAWN BY: REVISION DATE / - LOT 3 -OYSTER COVE ON DIANE GEORGE BASS RIVER , YARMOUTH MASS. CHECKED BY SCALE: I-= 2o• SEWAGE DISPOSAL SYSTEM PROJECT Bsaa DATE: HIDELL-EYSTER TECHNICAL SERVICES, INC. DRAWINGNO: 195 WHITING STREET HINGHAM,MASSACHUSETTS 02043 (6 17) 749-8040 9 , 4P42v1 1 11 11 DATE DATE DATE DATE TEST BY - TEST BY TEST BY TEST BY WITNESSED BY WITNESSED BY WITNESSED BY WTNESSED BY PERC RATE PERC RATE PERC RATE PERC RATE —MIN/INCH —MIN/INCH MIN/INCH —MIN/INCH 12°MINIMUM COVER 2 1/8"=3/8" STONE DISTRIBUTION LINE flood' aD" OO O O 3/4•-11/2 STONE Ds. O� c0 ° 1 OD WATER IN GROUND PROFILE VIEW �• -'*ay^ o s Io20 40 g ®FORGE 4P RIANRgANCIS I�C , EN - o REEKIE "' INV 9U 1p 95 t CIVILo A- GRAPHIC SCALE ,� � QtLT£ DRAWN BY: REVISION DATE / - LOT 3 -OYSTER COVE ON DIANE GEORGE BASS RIVER , YARMOUTH MASS. CHECKED BY SCALE: I-= 2o• SEWAGE DISPOSAL SYSTEM PROJECT Bsaa DATE: HIDELL-EYSTER TECHNICAL SERVICES, INC. DRAWINGNO: 195 WHITING STREET HINGHAM,MASSACHUSETTS 02043 (6 17) 749-8040 9 ,