Loading...
HomeMy WebLinkAboutEngineered Plan - Rev. 2016- V HORIZ 4 SCHEDULE 40 PVC PIPE CLEAN SAND SOIL. TEST TOP OF FOUNDATION FILL 20 FT. MINIMUM FROM CELLAR OR CRAWL SPACE MIN. PITCH 1/8" PER FT. / A' -. INSPECTION PORT 2" LAYER OF H , DATE OF SOIL TEST MAY- 12. 2016 . _ _ _ SOIL TEST DO B T. AYE NE Y T. ELEV. = 9.80 -- 10 FT. MINIMUM 10 FT. MINIMUM FROM SLAB 2" PRESSURE PIPE 4" CAST IRON PIPE.6 MAX,~MAXM 11/8 TO 1/2 WASHED STONE ._ . _HAYES WITNESSED BY P RAND (NAD 88) 7.53 150 PSI MINIMUM CONCRETE COVERS CONCRETE COVERS MANHOLE COVER ELEV. = -�__ P A QUICK gISCONNECT TEE rl OW .5Y7/6 10.53 �." OR FILTER FABRIC 8.28 MIN. z VENT .O SER VA ZION HOLE 1 ELEV.=8.1 PERCOLATION RATE _ < 2 _ MIN./INCH AT 50 _ INCHES - V HORIZ TEXTURE COLOR MOTT. OTHER UNION FILL LEVELERS 7-12'-.. A' -. _ LOAMY SAND 10YR2/1 12-14" 20f LOAMY SAND 4" CAST IRON PIPE.6 MAX,~MAXM B LOAMY SAND 7.5YR4/4 7.53 a� IFINE SAND .5Y7/6 (OR EQUAL) MINIMUM Fl I ' PITCH 1/4" PER FT. . 10 o 6.20_ BEL A1800 FILTE ELEV. = 6" SUMP ELEVL= 7.03 ° �- - - - - -- ELEV.- _ �.. • ELEV - 7 8f FLOW LINE 10" FLOW LINE . 2 T0I D U TI OI� � DEPTH HORIZ TEXTURE COLOR MOTT. OTHER 0-7" FILL NO 7-12'-.. A' -. _ LOAMY SAND 10YR2/1 12-14" E LOAMY SAND 1OYR5/1 14-27" B LOAMY SAND 7.5YR4/4 27-107* C IFINE SAND .5Y7/6 -- MIN. " RI � _ $HIGH CAPACITY INFILTRATORS WATER ENCOUNTERED AT >96" ELEV. 3/8. DRILL BOX ELEV. - 6 50 HOE WITH STONE INA z 5.06 ELEV. .rg TO BE WATER TESTED 11' X 4$' X 10" TRENCH FORMATION WELL HVI 29 LEV. _ _ DESIGN CALCULATIONS ADD GAS ELEV. �SL�_ z (T0 _BE PLACED ON FIRM BASE) �+ t /� p 1n ZONE A BAFFLE ADD GA SOIL ABSORPTION -(4/2016) NUMBER OF .BEDROOMS 4 LIQUID OUTLET. BAFFLE CHECK 3/4" TO 1 1/2" INDEX 7.24 VALVE . WASHED STONE SYSTEM, (SAS) ADJUST 1.04 GARBAGE DISPOSAL UNIT4 FEET 14.�NCHES DEPTH TEE (EXISTING) 12" CONCRETE TOTAL ESTIMATED FLOW 5 FEET 19 INCHES __: 2-MYER SR 4 T 4 OOO GALLON - ( 110 GAL./M/DAY X A ER.) �Q GAL../DAY 6 FEE 2 INCHES 0 4 HP ,MAX REQUIRED FIRST SEPTIC` TANK CAPACITY�. GAL. 7 FEET 29 INCHES (TO BE PLACED ON A FIRM BASE) ACTUAL SIZE OF FIRST SEPTIC TAN K(EXSMNG) !Q9 GAL:_ 8 FEET 34 INCHES SEPTIC TANK PULP (OR EQUAL) USGS.PROBABLE WATER TABLE ELEV., �,� 2000 GALL ". CONCRETE OBSERVED. WATER TABLE (5/12/2016) .ELEV. _ a.1 REQUIRED SECOND SEPTIC TANK CAPACITY' GAL, NCH A� BER 9 ACTUAL' SIZE OF SECOND SEPTIC TANK 2.__ GAL. BOTTOM OF TEST HOLE ELEV. = _=182_ SEPTIC TANK . �i � ® �y q �i CAPACITY OF SECOND SEPTIC. TANK �01£�'4'_2 GAL..: ELEV. AT INVERT INLET �$-0c PUMP- CHAMBER CALCULATIONS: SOIL CLAS5IFICATION p c ELEV. AT ALARM ON 4.30 DESIGN PERCOLATION RATE 5 5 MIN./N. SEWAGE DISPOSAL SYSTEM PROFILE REQUIRED FLOW PER CYCLE .25 X _ ��� 110 GAL./CYCLE EFFLUENT LOADING RATE _ 26.33 GAL./DAY%S.F. ELEV. AT .LAG PUMP ON x'15-- VOLUME PER CYCLE -110 GAL/CYCLE /7.48 GAL./CU. FT. 14_71 CU. FT:/CYCLE LEACHING AREA X26.33 SQ. FT NOT TO SCALE ELEV. AT PUMP ON 4-0� 11X �^ /� . A't VOLUME OF IN PIPE 3.14 X 0.00694 -X . _.55 FT. _ _1.2� CU. FT. ( 48)+(599,2X10/12) CAPACITY OF Zt1 SEPTIC TA1Vi� ELEV. AT PUMP OFF -3-- TOTAL MINIMUM VOLUME PER CYCLE -l= CU. FT. LEACHING CAPACITY (AREA X RATE) M101 GAL./DAY TOP OF CONCRETE BALLAST 2'75 DISCHARGE _1_5.91 CU. FT. / 36.11 CU.FT./FT. = : 0• .FT. (1000 G.S.T.) 626.33 X 0.74 BOTTOM OF INSIDE PUMP CHAMBER X00 - 1,63 FT. RESERVE LEACHING CAPACITY GAL./DAY 5X10X(5.33- 1_00 _)X7.48 1619.42 GALLONS BOTTOM OF OUTSIDE PUMP CHAMBER 1.50 STORAGE CAPACITY (___ GAL./DAY /7.48 GAC./CU.FT./36.11. CU.FT./FT. - _1,-0- REQUIRED _1,79, PROVIDED TES. .. I� O R y" : 9.2 G7 U O t !'11 �i C� CALCULATIONS. (FULL :'-:. 1. ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO.O.E.P. INUNDAIJON) : TITLE 5 AND THE TOWN'S RULES AND REGULATIONS FOR R�J 2000 GALLON PUMP CHAMBER '(H-20) 1000 ' GALLON PUMP CHAMBER (H-20) THE SUBSURFACE DISPOSAL OF, SEWAGE.. WEIGHT OF WATER DISPLACED WEIGHT OF WATER DISPLACED 2. ALL COVERS TO SANITARY UNITS SHALL BE BROUGHT TO S 11.0xS.Qx{7.33)x64.0 30,952 LBS, 9.0x5.25x(6.0)x54.0 18,144 LBS. WITHIN -6" OF FINISHED GRADE. WEIGHT OF TANK PER MANUFACTURER 25,0€;0 LBS. WEIGHT OF TANK PER ' MANUFACTURER 14 500 LBS. ALL COMPONENTS OF THE SANITARY .SYSTEM SHALL BE CAPABLE OF jJ Sy,00 NlEIGHT OF 12" CONCRETE WEIGHT OF WATER IN SUMP WITHSTANDING H-10 LOADING UNLESS THEY. ARE UNDER OR WITHIN' 0 , 10.0X5.00X1.00X135 6,750 LBS. 8.17M.42X0.83X62.5 1,873 LBS. 10 FT. OF DRIVES OR. PARKING AREAS.. H-20 LOADING SHALL BE LOT 85A EXCESS WEIGHT TO 'OFFSET FLOTATION WEIGHT OF , 9 CONCRETE USED UNDER OR :WITHIN 10 - FT. . OF DRIVES OR PARKING: AREAS. N 30862-(25080+6750) E58 Leg, 5.17X4.42X0.75X135. 3,65$ LBS. 4. ANY MASONARY UNITS USED TO BRING COVERS TO GRADE :SHALL 17,010.9 f S. - _ BE MORTARED IN PLACE. � - EXCESS WEIGHT TO OFFSET FLOTATION 18144-(14500+1873+3555) 1.8.35 LBS. 5. NO DETERMINATION* HAS BEEN MADE AS TO COMPLIANCE WITH DEEDED : OR ZONING .REGULATIONS. OWNER / APPLICANT IS .TO OBTAIN SUCH DETERMINATION FROM APPROPRIATE AUTHORITY. * 9.2 6,,. -UTILITIES' SHOWN ARE APPROXIMATE ONLY, EXCAVATION CONTRACTOR _ IS TO CAH "DIG -SAFE" AT 1-888-344-7233 AT LEAST, 72 HOURSPRIOR . ' ' S A� ELEVATIONS A W'ELL AS SITE. 7 CONTRA�TORM IS VERIFY GRAD AND TI S 8.3 "�/ - - - - tTE CONDMONS'PRtOft T 'C ENCING WORK' OtV "SITE. ANY' VARIATION / S TO BE BROUGHT TO THE ATTENTION OF THE DESIGN ENGINEER SOIL VENA LIMIT OF 5' / TEST OVERDIG ���P�1 NE �-1 8,2 \ - IMMEDIATELY. .8. PARCEL IS IN FLOOD ZONE O `�0 9. LOT IS .SHOWN .ON ASSESSORS MAP X20. AS PARCELIM _G1 9.4 10. PUMP .AND ALARM ARE TO. BE ON SEPERATE CIRCUITS.' ` D. IO,AND VISUAL-. 12. A11. LZABEL A18 OARM IS TO EFIBLTER S DO BE INSTALLED. \ BOX rk 0F' _ A: 13, AN ELECTRIC PERMIT IS REQUIRED TO WIRE PUMPS AND ALARM. - 14. ALL UNSUITABLE MATERIAL SHALL BE REMOVED FROM <UNDER AND . \ \. `J�G� - , , '1 .•- �y, FOR A MINIMUM OF 5' AROUND SOIL ABSORPTION SYSTEM AND BE REPLACED WITH MATERIAL AS SPECIFIED IN 310. CMR 15.255:(3). \ ���'�` 15, SEPTIC TANK AND PUMP CHAMBER ARE TO BE WATERPROOFED AT . 9.4 THE MANUFACTURER. 16. THE INSTALLER IS TO GIVE THE ENGINEER A MINIMU�A OF 48 HOURS \ 9.4 9.8 9.6 0010 v�tirif' (2 WORKING DAYS) NOTICE FOR THE FINAL `INSPECTION (NUMBER BELOW). Til Cp . l> �s ,�c�;k�' M %P.ik '0 17. EXISTING LEACHING FACILITIES ARE TO BE PUMPED AND REMOVED w 0 9.4 ¢ 31 rff Vis;..' ALONG WITH ANY POLLUTED SOILS ENCOUNTERED. 0.o } 0 1 1000 GALLON vi o \ ./ `',' 3 SEPTIC TANK $- * 8t 2000 GALLON � PUMP SEPTIC TANK CHAMBER DATE AGENT RK�N --- 0 o LEGEND: EXISTING SPOT ELEVATION 00,0 EXISTING CONTOUR---=00---- FINAL SPOT ELEVATION 0 . FINAL CONTOUR 00 SOIL TEST LOCATION UTILITY POLE -0- TOWN WATER -W-�_W- CATCH BASIN `11;1 GAS LINE CLEAN OUT C CESSPOOL C.P.0 - OOS D S'C SI` FOR "5/ .�"SS oc. �. U T O 1T 5 V CSS 508= P. O. BOX 485 ,64-8379 SOUTH DENNIS, MASS. 0266( SHORESDE LOCA' 3, -1-6 "= 24TMAY 1 F-' REV. JULY 2, 2016,Boa No. 7095-00:. LOCATION MAP REV. SHEET --.1 -OF 1 C.- �S8�PROl`7695-00`dwg�7695-SAS.OM 0 2016 T. M. HAYES, RS I