Loading...
HomeMy WebLinkAbout83-891 (2)UTILITY NOTE. ALL UNDERGROUND UTILITIES SHOWN WERE COMPILED ACCORDING TO AVAILABLE RECORD PLANS FROM THE VARIOUS UTILITY COMPANIES AND PUBLIC AGENCIES AND ARE APPROXIMATE ONLY. LOCATIONS MUST BE DETERMINED /N THE FIELD. BEFORE EXCAVATION, BLASTING, INSTALLING, BACKFILLING, GRADING, PAVEMENT RESTORATION OR REPAIRING, ALL UTILITY COMPANIES, PUBLIC AND PRIVATE, MUST BE CONTACTED, INCLUDING THOSE IN CONTROL OF UTILITIES NOT SHOWN ON THIS PLAN. SEE CHAPTER 370, ACTS OF 1963, MASS. WE ASSUME NO RESPONSIBILITY FOR DAMAGES INCURRED AS A RESULT OF UTILITIES OMITTED OR INACCURATELY SHOWN. BEFORE PLANNING FUTURE CONNECTIONS, THE APPROPRIATE UTILITY COMPANY ENGINEERING DEPT. MUST BE CONSULTED. THE CONTRACTOR MUST NOTIFY UTILITY COMPANIES 72 HOURS IN ADVANCE OF CONSTRUCTION. THIS MAY BE DONE BY CONTACTING THE DIG - SAFE CENTER (7-800-322-4844). NOTE: 1.) THE PROPERTY LINE INFORMATION SHOWN HEREON WAS COMPILED FROM A PLAN BY CHARLES N. SAVERY CO. DATED AUGUST 1, 1973, FOR ROBERT E. AND DANTE N. BRATTI. 2.) THE BENCH MARK USED: B. M. Y- 7 EL. = 20.32" (N. G. V. D.) "top flange bolt on Hydrant #1427 N.E. side of intersection of Rt. 28 and Main St., Yarmouth" 3.) THE TOPOGRAPHIC INFORMATION WAS OBTAINED BY AN ON THE GROUND SURVEY ON MAY 70, 7984, AND UPDATED ON MAY 9, 1988. 4.) THE ENTRANCE AND PARKING AREAS SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE TOWN OF YARMOUTH REQUIREMENTS. 5.) THIS PLAN REPRESENTS DESIGN OF PARKING, DRAINAGE, AND GRADING ONLY. 6.) PARKING REQUIREMENTS. 1 SPACE PER 7 OCCUPANTS OCCUPANTS: MASS BUILDING CODE TABLE 606 RETAIL BUILDING: FIRST FLOOR 2400 SF / 30 = 80 SECOND FLOOR 7800 SF / 60 = 30 STORAGE BUILDING: FIRST FLOOR 2400 SF / 100 = 24 TOTAL 134 OCCUPANTS PARKING SPACES REQUIRED: 134 / 7 = 19.1 PARKING SPACES PROVIDED: 23 ( 10' X 20' SPACES ) 7.) THE ZONE BETWEEN THE WETLAND LIMIT AND SITE IMPROVEMENTS IS TO BE VEGETATED IN COMPLIANCE WITH CONSERVATION COMMISSION REQUIREMENTS. 8.) TREES REQUIRED: ONE PER EIGHT PARKING SPACES 2" MIN. CALIPER 9.) ANY EXISTING BITUMINOUS PAVEMENT ON THE LOT SHALL BE REMOVED AND THE 70' WIDE BUFFER ZONE ALONG PROPERTY SIDELINES SHALL BE MAINTAINED WITH VEGETATION. 70.)THE ENTIRE UPLAND PORTION OF THIS SITE LIES ABOVE THE 700 YEAR FLOOD ELEVATION. (10.0' N.G.V.D.) 17.)THE SEWAGE DISPOSAL SYSTEM SHOWN WAS TAKEN FROM A PLAN PREPARED BY C.D. SPORE P.E., DATED OCT 28, 1982, TITLED "SEWAGE DISPOSAL SYSTEM FOR RENE'S AUTO SALES BLDG. PARCEL 1, IYANOUGH RD. BARNSTABLE - YARMOUTH" AND AS LOCATED BY C. D. SPOHR ON MAY 4, 7983. 12.)ALL SEPTIC SYSTEM M.H. COVERS SHALL BE BROUGHT TO GRADE DURING CONSTRUCTION. 13.)ALL CONSTRUCTION WORK IN THE RT. 28 RIGHT OF WAY SHALL BE PERFORMED IN ACCORDANCE WITH THE MASS D. P. W. RULES REGULATIONS, AND MASS D.P.W. PERMIT NO. 7-23253. 74.)PROPOSED PLANTINGS WITHIN 20 FEET WETLAND BUFFER STRIP TREES: 5 - ACER RUBRUM RED MAPLES 70 - JUNIPERUS VIRGINIANA RED CEDAR SHRUBS' CLETHRA ALN/FOLIA SWEET PEPPERBUSH MYRICA PENNSYLVAT/CA BAYBERRY PRUNUS MARITIMA BEACH PLUM ROSA RUGOSA RUGOSA ROSE VACCINUM CORYMBOSUM H/GHBUSH BLUEBERRY VIBURNUM CASS/NOIDES WILD RAISIN V. RECOGNI TUM ARROWWOOD PLANTING SEQUENCE: PLACE HAYBALE SILTATION BARRIER ALONG TOP OF SLOPE. PLANT TREES 10 FEET ON CENTER, PLANT SHRUBS 4 FEET ON CENTER TO CREATE THICKET. MULCH AREA WITH SCA TIERED HA Y OR WOOD CHIPS. 15.)THE LOCATION OF EXISTING DRYWELLS FOR DOWNSPOUTS ON EXISTING BUILDING TO BE VERIFIED BY CONTRACTOR/OWNER BEFORE CONSTRUCTION. I6.) OW/VERS'ENGINEER TO INSPECT B CERTIFY ALL WORK. / Route 28 PARCEL / 2.6t /i/ICRES E.Mofn St. Mill Pond LOCUS 3 soon, 3 c / h � . Hyvnnis Harbor WETLAND LIMIT LOCA TION MAP � Scale 1'"=2083+ v BOTTOM OF SLOPE , ASSESSORS MAP: 30 PARCEL. D2 O / 9� Q�- o�ZONE. GENERAL BUSINESS V " \ / TOP OF SLOPE l ✓ _ "^ \ Qj WETLAND LIMIT � /� L�, I Zo0E 0� / SA I _\ A � 7Q_ 9 80, , \Wf'TLAND LI'RT i 14' R.C.P. r°, EXISTING CATCH BASIN/ - �N� / �' 2p F I = /l �t 1 v / / / T �• RIM EL. = 11.90 J •�1 /��� �a l \\`� / O1 i� 12.80' �e • l � 50 J / Fki La,gM SEE��� /" �s°00/40 / \ OY ° � ,./t2 j F cA CON TRA CTOP / OWNER NOTE: s 2.50 \ of s�cF< IFRIFY IF SEPTIC SYSTEM STRUCTURES ARE / \ ✓2-c 4 ., 4s °� \ H-70 OR H-20 LOADING. H-20 STRUCTURES 5o F� A.4E RE QUIRED UNDER PA VED AREAS REPLACE \ EX/SANG If NECESSARY. CATCH BASINLEACH/NG AREA /// ` 1 \ RIM EL. = 10.89' ( # / 8 ey9r+ �$ I �iye 6F / • S ell U. POLE _UNREGISTERED- \ REGISTERED 71 2 � 9. 7 �N � , p 6Us�i4c,'Qr ®rP. ,p'•s i 1140, I 2 BENCHMARK /`\ C•C F., III, /t �Q {\ ��> 7 9 l- L. C. C. 15805 A I Top of S.B. £l. =11.52' N.G. V.D. �� oFc� a y I I Existing . Curbed Island31SS. -F°'w. ( to be remov \ CD 9(iAfei� / -:5",V Ext Paved Aoren I `' eP d• of PAUL LESLIEr ANDERSON ET UX / (to be oved and seeded) ' X18 ?'P� '�,..{Y25 cV LG A(�H/NG AHtA ' O{ # 2 6 Cf/fJNB R=4D• / I c tv 0 y11.2G EX/SAC. NG � ' o_ B.RJ' �7 CATCH RimEL 811.87' T h•i'7,7 iQ RcE• GA TE Existing PCv O"�' /'q ` s (to be removed I OLE I I Existing Granite Curbed d � ( to be re. -roved ) 00' I 1607'NGV.D ?'7^==•:T SEE NOTE 13 \ I \ S.B. Ft0. . I c�! j� ML G I (1 REVISIONS: NO DATE REFERENCES: PROJECT TITLE: SITE PLAN SHOWING PROPOSED BUILDING, DRIVE, AD PARKING /N YARMOUTH, MASS. PREPARED FOR: LUKE LALLY j The BSC Group �� a The BSC Group -Cope Cod Inc Modaket Place 812 Route 28 Moshpee, Mo. 02649 �����N°relrss'c 677) 477-2525 o R. `-' W'EAVER H A!o. 3361 AL LAND S e►'e. DAVID J. i CIISIIN CIVIL'"^., Me, 32112 e; 'XT0Wo 4- lfftOURt t ;. 2, fz SITE PLAN SCALE: 1`--20' 0 X10 20 30 40 FEET DATE: JUNE 2, 7988 COMP/DESIGN: S.A.H./D.A.J. CHECK: DRAWN: R.L'H. FIELD: J. V. B./J. H. C. FILE NO: DWG. NO: SHEET 1 OF 2 JOB NO: 3.3207.40 c�! j� ML G I (1