HomeMy WebLinkAbout83-1170.........................».......»_»........ ....... ».... ..-........-.................. ......_..............
......._................».......................»_..._.........._..:...�
To TOWN OF YARMOUTH CONSERVATION COMMISSION Issuing Authority
Please be advised that the Certificate of Compliance for the project at �'Cil e-(_! '0 /�! r
File Number SE 8 3 —117 0 bas been recorded at the Registry of BARN STAB L E
and has been noted in the chain of title of the affected property on . 19
If recorded land, the instrument number which identi • s this transaction is - - - - - -CUM T t
If registered land, the docu ber id lilies this transaction is
Signature 2h+ Applicant
8-2
(Leave Space Blank)
Effective 11/10/89 8_1
Form 8
DEPF%No. SE 83-1170
(To be provided by DECIE)
ciyrrow, YARMOU-M
Applicant JOSEPH GENTILE
Certificate of Compliance
Massachusetts Wetlands Protection Act, G.L. c.131, §40
and the Town of Yarmouth Wetland Bylaw
From TOWN OF YARMOUTH CONSERVATION COMMISSION Jssuing Authority
To Joseph Gentile 30 Grandview Drive, So. Yarmouth,MA
(Name)
Date of Issuance September 2. 1928
(Address) -
This Certificate is issued for work regulated by an Order of Conditions' issued to Joseph gentile
dated March 6, 199ind issued by the COMMISSION
1.` It is hereby certified that the work regulated by the above -referenced Order of Conditions has
been satisfactorily completed.
2. ❑ It is hereby certified that only the following portions of the work regulated by the above -refer-
enced Order of Conditions have been satisfactorily completed: (If the Certificate of Compliance
does not include the entire project, specify what portions are included.)
3. ❑ It is hereby certified that the work regulated by the above -referenced Order of Conditions was
never commenced. The brder of Conditions has lapsed and is therefore no longer valid. No future
work subject to regulation under the Act may be commenced without filing a new Notice of Intent
and receiving a new Order of Conditions.
.......................................................................................................................................................................................
(Leave Space Blank)
Effective 11/10/89 8-1
4. 0 This certificate shall be recorded a or the Land Court for the district in
which the land is located. The Or was r ed on March 11. 19 9 2 (date)
at the Registryof BARNSTABLE . Book . Page
LCC # 118686
5. O The following conditions of the Order shall continue: (Set forth any conditions contained in the
Final Order, such as maintenance or monitoring, which are to continue for a longer period.)
Issued by TOWN OF YARMOUTH CONSERVATION COMMISSION
Signature(s)
C
When issued by the Conservation Commision this Certificate must be signed by a majority of is members.
On this 9Z C �4 day of :,4!!4 ck5 �- . 19 _. before me
personally
to me known to be the
person described in and who executed the foregoing instrument and acknowledged that he/she executed
the same as his/her free act and deed.
Notary Public
;I-aU 2
My commission expires
-Detach on dotted line and submit to the CO N S ER VAT IO N COMMISSION
to TOWN OF YARMOUTH CONSERVATION COMMISSION Issuing Authority'
Please be advised that the Certificate of Compliance for the project at
File Number SE 8 3 -117 0 -has been recorded at the Registry of BARN STAB L E
and has been noted in the chain of title of the affected property on .19
If recorded land. the instrument number which identifies this transaction is
If registered land. the document number which identifies this transaction is
Signature Applicant
8-2
To
Issuing Authority
Please be advised that the Order of Conditions for the project at 30 Gl e4,y, � mow �/2 So - %t,��yro (
/ F le .Num�r O has been recorded at the Fe4ttr � t BA R N S TA B LE and
�V (1�
has been noted in the chain of tale of the affected property n accordance w[Getyra�.r,.pnditjon 8 on 19
If recorded land, the instrument number which identifies this tr, npac ion is
, Cd 7 i 7'" �Y ht
It registered land. the document number which identifies* _ -- !'agf�}n�
�- 0��r
C�f�7ri.CE
Aopl,c-,nt
s
Form 5
Commonwealth
of Massachusetts
DEP Re No.ISE - 1 17 0
(To De orwaed Dy DEP)
City. Town YA R M O U T H
Applicant JOSetah Gentile
Order of Conditions
Massachusetts Wetlands Protection Act
G.L. c. 131, §40
and the Town of Yarmouth Wetland Bylaw
From TOWN OF YARMOUTH CONSERVATION COMMISSION
To Joseph Gentilp same
(Name of Applicant) (Name of property owner)
Address--1 91 S State street Address same
Springfield, MA 01109
This Order is issued and delivered as follows:
O by hand delivery to applicant or representative on
(date)
Ek by certified mail, return receipt requested on March 6. 1992 (date)
This project is located at - 10 rrandyi ew Drive., South Yarmouth, Ma.
The property is recorded at the Registry of B A R N S T A B L E
Sook Pace
Certificate (if registered) r. _ C. C.-118686
The Notice of Intent for this project was filed on January 10, 1992 (date)
The public hearing was closed on February 20, 1992 (date)
Findincs
The Town of Yarmouth Ccrrs;rjcflcn C-cmmissien has reviewed •~e atove-referenced Nonce of
Intent ane cans anio has he!d a Ct:b!ic hearing cn the project. Eased en the infcrma:icn avaiia=:e to the
COMMISSION at this time. the COMMISSION has te:errmned that
the area on wn,cn the crcccsec wcrx is ;c oe cone !s significant to the fc!icwing interests ;n acccrcance with
the Presurn:,;;cns c' Sicnficance set'crm in ;he re7uiations'or each Area Suejec: to c:ev:on Uncer ;ne
Act (c^ecx as acorc:nate):
._ P;;!:;1;water su^o:y r:o n rC„_.rc :cn-a!n;rc,.e/,{
sn
_
_ Private water suC :y S:orm --rage prevertlon F:'sn.er'es
Grouna water sucpry Prever,acn e' pollution 1 Preterocn of wiic!i'e hab:=t
Tc:al ^ling =ee S',_ :ne^ State Share
C„v17cwr. e C `.ee in excess
Teat Fet,.;,c Cue S C,::Town ?c-:cr 5 State F .....,. _
Therefore, the COMMISSION hereby finds that the following conditions are
necessary, in accordance with the Performance Standards set forth in the regulations, to protect those inter-
ests checked above. The COMMISSION orders that all work shall be performed
in accordance with said conditions and with the Notice of Intent referenced above. To the extent that the fol-
lowing conditions modify or differ from the plans, specifications or other proposals submitted with the Notice
of Intent. the conditions shall control.
General Conditions
1. Failure to comply with all conditions stated herein, and with all related statutes and other regulatory meas-
ures, shall be deemed cause to revoke or modify this Order.
2. This Order does not grant any property rights or any exclusive privileges; it does not authorize any injury
to private property or invasion of private rights.
3. This Order does not relieve the permittee or any other person of the necessity of complying with all
other applicable federal, state or local statutes, ordinances, by-laws or regulations.
4. The work authorized hereunder shall be completed within three years from the date of this Order unless
either of the following apply:
(a) the work is a maintenance dredging project as provided for in the Act; or
(b) the time for completion has been extended to a specified date more than three years, but less than
five years, from the date of issuance and both that date and the special circumstances warranting
the extended time period are set forth in this Order.
5. This Order may be extended by the issuing authority for one or more periods of up to three years each
upon application to the issuing authority at least 30 days prior to the expiration date of the Order.
6. Any fill used in connection with this project shall be clean fill, containing no trash, refuse, rubbish or de-
bris, including but not limited to lumber, bricks, plaster, wire, lath, paper, cardboard, pipe, tires, ashes,
refrigerators, motor vehicles or parts of any of the foregoing.
7. No work shall be undertaken until all administrative appeal periods from this Order have elapsed or, if
such an appeal has been filed, until all proceedings before the Department have been completed.
8. No work shall be undertaken until the Final Order has been recorded in the Registry of Deeds or the Land
Court for the district in which the land is located, within the chain of title of the affected property. In the
case of recorded land, the Final Order shall also be noted in the Registry's Grantor index under the name
of the owner of the land upon which the prcoosed work is to be done. In the case of registered land. the
Final Order small also be noted on the Land Court Certificate of Title of the owner of the land upon which
the proposes work is to be done. The recording information shall be submitted to the COMMIS_ ICON
on the for-i at the end of this C,-cer prior tc-cmmencement of the work.
9. A sign shall be displayed at the site not less than two square feet or more than three scuare feet in size
bearing the words. "�Mlassachusetts Department of Environmental Protection,
Fie Number SE 83-1170
10. Where the Department of Environmental Protection is requested to make a determ,naticr. and to issue
a Suoersecing Order, the Conservation Commission snail be a party to all acency p cceec:ncs and
hearings oefore the Department.
1 1 . Upon como,et,on of the work cescr:bed herein, the apolicant shall forthwith reauest in wnt,ng that a
Certificate of Compiiance pe :ssuec stating ;nat the work has been satisfactoniy cornmetec.
2. The work snail ccntcrm to the 'o,icwing plans and special conditions:
5-2
Plans:
Title Dated Signed and Stamped by: On File with:
Site Plan for "Revised" Rnht-rt M perr?, p Conservation
Joseph Gentile by 2-18-92 Commission Office
Schofield Bros., Inc.
Special Conditions (use additional paper if necessary)
13. The applicant shall be held responsible to advise 'the contractor of all
these orders of conditions.
14. The Conservation Officer shall be notified at least 48 hours.prior to
the commencement of the proposed work. Tel.#398-2231 Ext. 284.
15. These orders of conditions shall apply to any successor in interest or
successor in control.
16. The floats are to be removed seasonally.
17. Boats shall be docked at the floats only.
18. Four cement blocks shall be placed at each corner of the float,
in order to prevent the float from touching the bottom at low
tide.
19. The proposed patio shall never be closed in (i.e. built upon or
enclosed).
20. There shall be no dredging in connection with this.project.
21. The pilings shall be hammered driven.
22. All cut up ends and debris shall be cleaned up at the end of each work
day and not allowed to enter the waterway.
23. Excess material, if any, excavated from the area of the building
foundation and septic system, not required for backfill and grading,
shall be disposed of only at locations approved by the Conservation
Administrator.
24. Any fill required, (See General Order #6 in Order of Conditions)shall
be of clean sand and contain nb material over 12 inches in diameter.
25. A hay bale dike shall be staked in place as shown on the plan,
before any work begins on the project.
26. This dike shall constitute a work limit line. No work of any kind wil
be permitted on the wetland side of this line.
27. Any area proposed for removal of vegetation for a period of more than
seven days, shall be mulched or otherwise treated to prevent erosion.
28. The deck shall not be closed in without a filing of either a Notice of
TntPnt or a Reauest for Determination of Applicability.
29. The applicant shall be responsible for having a copy of the Orders
of Conditions on the job site at all times. Failure to do so could
possibly result in a revocation of the Order, or a fine, or both.
30. The Conservation Commission, its agents or assigns, shall have the
express right of entry upon the property for the purposes of
establishing compliance to the conditions stated herein.
31. Upon completion of the project a Certificate of Compliance shall be
requested. This Order shall be considered incomplete until the
Certificate of Compliance is recorded.
Issued By TOWN OF YARMOUTH Conservation Commission
This Order must be signed by a majority of the Conservation Commission.
On this_ 1� ' day of
personally appeared �o, F
19�9-2J , before me
to me known to be the
person described in and who executed the foregoing instrument and acknowledged that he/she executed
the same as his/her free act and deed.
Note Public My c mission expires
The arioncant, the owner, any person aggneved by this Order, any owner of land abutting the land upon which the proposed work is to be
done. or any ten residents of the city or town in which such land is located, are hereoy notified of their right to request the Department of
Environmental Protection to issue a Superseding order, providing the request is made by cenffiec mail or hand delivery to the Department,
with tine appropriate filing fee and Fee Transmittal Form as provided in 310 CMR 10.03(7), within ten days from the date of issuance of this
Determination. A copy of the request small at the same time be sent by certified mail or hand delivery to the Conservation Commission
and the applicant.
Detach on dotted tine and submit to the CONSERVATION COMMISSION prior to commencement of work.
To TOWN OF YARMOUTH CONSERVATION COMMISSION Issuing, Authority
Please be advised :hat the Oraer of Conditions for the prclect at
Fiie Numoer
has Ceen recorcea at the ;egistry o: E A R N S TA E L E and
has Ceen notea in the chain of title of the atfec:ed property in accordance with General ConCaon 8 on
If recorcea lane, the instrument numcer wnch identifies tmis transac::en is
If reg-stereo land, the cCcLment nUnlCer wnicn identifies this transac::Qn is
99
Signature
5.4r
-cphCznt
.. �rArta�am�
. �g<RVA110M
N
weby i
%vep6 Gem
extend
tam and
of BASS Rive[
1i
`and VWARW
!
aillai aoutat beach
36
Drive.
sift On the above,
be
iliF it the, Y9a&.
�ottte 28. So
ra>
1"2 at &15 ps
,VATiON
_SIGN
iOF YARMOUIP
0
Jim
YARMOUTH CONSERVATION COMMISSION,,,
NOTICE
Notice is hereby given of the intent of:
ti
�w
Joseph Gentile
1515 State Street
Springfield, MA 01109 -�
To renovate and extend an existing peir, ramp and float over the waters at
Bass River and to add fill and vegetation to an existing coastal beach at
30 Grandview Drive, South Yarmouth, MA.
Hearing on the above will be held in the Yarmouth Town Hall,
Route 28, South Yarmouth, MA on Thursday, February 6, 1992 @ 8:15 p.m.
JAMES H. QUIRK, JR. CHAIRMAN
CONSERVATION COMMISSION
TOWN OF YARMOUTH
� r i
S.
==,fit_
DANIEL S. GREENBAUM
Commissioner
GILBERT T. JOLY
Regional Director
REO:NOTIFICATION OF FILE NUMBER DATE: February 5, 1992
WETLANDS/ YARMOUTH
This Department is in receipt of the following application filed in
accordance with the Wetlands Protection Act (M.G.L., Chapter 131, Section
40):
APPLICANT: Joseph Gentile OWNER OF LAND: Same
ADDRESS: 1515 State Street ADDRESS:
Springfield, MA 01109
PROJECT LOCATION: 30 Grandview Drive
This project has been issued the following file # SE 83-1170
Although a file # is being issued, please note the following:
310 CMR 10 25, 10 27 10 30 10.34. Land Subject to Coastal Storm
Flowage.
No file # will be assigned to this project until the following missing
information is sent to this office to complete the filing in accordance
with the Act: PLEASE RETURN THIS FORM WITH REQUESTED INFORMATION.
( ) Notices of Intent ( ) Locus Maps ( ) Fee Transmittal Form
( ) Title 5 Plans ( ) Appendix A Documentation ( ) Plans
COMMENTS:
(x) Application has been forwarded to the Waterways Licensing Program to
determine if a Chapter 91 License is required.
(x) Please forward'a copy of the Notice of Intent to the Army Corps of
Engineers for Sec. 404 review (Call 1-800-362-4367 for information.)
(x) Project may require a Water Quality Certificate. Applicant is
advised to contact the DEP Division of Water Pollution Control (1
Winter Street, Boston, MA 02108; Tel: (617) 292-5673) for forms and
further information.
ISSUANCE OF A FILE NUMBER INDICATES ONLY COMPLETENESS OF FILING SUBMITTED,
NOT APPROVAL OF APPLICATION.
DFG/jt
cc: Conservation Commission
(x) DEP Water Pollution Control-ATTN: J. Perry
(x) U.S. Army Corps of Eng., Reg. Branch ( ) Coastal Zone Management
( ) RnarA of Woa 1 tb ( 1 Btu i 1 d i na TnAnees--tor
, .ecvcjed Paper
ra. } OEP File No.
.,, commonwealth
of Massachusetts ��' fro bepmy*W 9EPj
Vty.Town • YA
RMO
Applicant _ Joseph Gentile
Notice'of Intent
Under the
Massachtisetts Wetlands Protection Act G.L.
the Town Of Yarmouth • Vtiletland �, and1.
§40
' Application for a Department of the
�e Army Permit
Part l: General Information
' 1. location: Street Address 30 Grandview Drive South YarmoMA.
Lot Number Ni _ testa Rl u� �'
' Waterfront •
2. Project. -Type Residential Renovation and extension of existing stin g pier
' with ramp and float; addition of fill in the immediate area of existing dwelling
as a measure of flood damage prevention. '
3. Registry: County Barnstable
Current l3pok Page___________
Certificate (If Registered land) 118686
4. Applicant Joseph Gentile
Tel. (413) 734-8251
Address 1515 State Street, Springfield, MA 01109
----------------
5. Prcaerty Owner Same as above
Tel.
Address Same as above
6. Reoresentative �rt M. Perry, Schofield Brothers, Inc.
Tel. 1508) 255-2098.
Address P. 0. Box 101, Orleans, MA 02653
7. a. Have the Conservation Commission and the Department's Regional O;fice eacn been sent, b certified
mail or hang oelivery, 2 copies intent, with sues of completed Notice of Iy
Yes X No Faorting plans and documents?
b. Has the fee been submitted? 2 Yes Q No
C. Total Filing Fee Submittea $406.00
d. Ciryli own Share of Fitirg Fee _ S21 S r,n
State Share of Fiing Fee _$190 50
(sent :o C;tv/Town) (tl: of fee in excess of S2;., e. Is a or,ef s;a:?ment athchea ina;ca:ing how the applicant calculateC :he fee? � Yes en^ No~��
EHecuve
J
I
' CE OF IN'I�NI+ FED TRhN AL fl7RM
DEPARMW OF MMONMM
ON
DIVISION OF WL* LVW AND 'WATT S
NOTICE OF 32nW (NOI) APPLICANT': PR3PEE2TY "Wm:
' Name Joseph Gentile Same
Name '
1515 State Stren•F Sam
Street1515 State Street Same
Street
' City/Ita,,n SPringfield
City/Zbwn Same
State MA Zip Code 01109
' Zip Oode
Phone Mmber (413) 734-8251
Pm7e t Location: Street/Lot thmber Lot N12, Grandview Drive
' City/Z South Yarmouth, MA
' DEP 17 F NUMBER (if available)
- tdOI FTL.'rtx FEE
' DISPUI� ME
NOI Filing Fee: $ 406.00
7btal Disputed Fee: $
' ate Share of Filing Fee: $ 190.50 (as determined in Notice of
(1/2 of fee in excess of $25.00) Insufficient Fee letter from
Servation ooa:anission)
City/Z1own Share of n
' Filing Fee: $ 215.50 State Share of Fee: $
(1/2 of total disputed fee)
' CitY/ThM Share of Fee: $
(1/2 of total disputed fee)
INSTRUCTIONS
' I. Send this Fee Transmittal form with a check or
the CM=nwealth of Massachusetts to the DEP money offer, payable to
Lock Box at.
' WPartnent of Ehvironmental Protection
Box 4062
tBoston, M 02211
2. Attach 'a oopy of this form to the Notice of Intent sub fitted to the
local conservation Om mission.
' 3. Attach a pW of this form and a of the
Notice of Intent forms VJ11dtted a DP regional offices. of the
1
11/10/89
_— `%JJur,1iuty WORKSHEET
1
ATEGORY 1
' s55 PER ACTIVITY
plants, roadways/driveways NOT subject to 310 CHR
10.53(3e) SHALL NOT BE SUBJECT TO
$
A. Existing House/residential
ADDITIONAL FEES
No. if said activities are reviewed under a SINGLE Nol
lot (addition, deck
garage)pool, shed,or DRIVEWAY) '
C. Construction of EACH ROADWAY/DRIVEWAY within
-- Buffer
t B. Site Preparation (removal
the
zone or Coastal Floodzone NOT reviewable
under 310. CHR 10.53 tie) and NOT
of vegetation, axes- _ vstion grading where home construction Isn't
associated with e
`-' D. HAZARDOUS h'ASTE
proposed under this NOI)
CLEANUP (except as noted in
category 4)
'
C. Control of nuisance vegetation by removal, herb-
icides, etc. within a Resource
TOTAL CATEGORY 3 ACTIVITIES
Area PER LOT
pursuant to 310 CHR 10.53(4)
-�
' D. Resource Area Improvement
ATEGORY 4 $725 PER ACTIVITY
pursuant to 310 CMR
10.53 (4) other than 1C above
A. EACH WETLAND FILLING/CROSSING
E. SEPTIC SYSTEMS or an y part thereof/repairs,
replacement, UPGRADING
LIMITED PROJECT
ACCESS ROADWAY/DRIVEWAY under 310 CHR 10.53 (3e)
-�
associated with COMMERCIAL,
—
INDUSTRIAL, INSTITU-
-- TIONAL DEVELOPMENT'OR RESIDENTIAL
F. Monitoring Wells/well
SUBDIVISION
CONSTRUCTION. (*see category 29 for SFH driveways*)
TOTAL CATEGORY 1 ACTIVITIES
B. flood C
es (construction, REPAIR,
end/or
modification)
odifi ation) —
1
CATEGORY 2 $250 PER .ACTIVITY
C. LANDFILLS -public a private
A. EACH NEW single family house (SFH) INCLUDING
D. SAND 6 GRAVEL OPERATIONS
site
utilities, SEPTIC SYSTEM,retentioroadway/drivewaynother
E. NEW railroad lines or EXTENSIONS of EXISTI lines NG
than those Pursuant to 310 CHR 10.53(3e)
If reviewed under a SINGLE NOI
F. Control
• B. Parking lot/ ANY site
of NUISavCE VECEfA►ION under 3lOCMR
10.53(4) other than---
on a SFH lot
--
C. Beach Nourishment
250 1
G. BRIDGES (construction, reconstruction, expansion,
maintenance) ASSOCIATED
Coastal Activities
with a SFH lot
'D.
pursuant to 310 CHR 10.24
(7e-c) including ?a -Electric Generation
H. Raising or lowering WATER LEVELS
Feellities,-
7b-Public Utilities, 7c-Coastal Limited Projects
including REPAIR/MAINTENANCE
I. ALTERATION OF RESOURCE AREA A diversion
of EXISTING piers, buildings culverts, etc.
of water
associated with HAZARDOUS WASTE CLEANUP, non- �--"
' F.. LIMITED PROJECT ACTIVITIES
ol
rojects, or rot
NOT EXPRESSLYmosquito cIDEN1IFIED ELSEWHEREAIN THISNY RFEEPURPOSE
pursuant to 310 CHR
10.53 (a-d) AND 310 CHR 10.53 (f-1) per footprint '-'
SC SCHEDULE
3, DREDGING ACTIVITIES
'F. NEW agricultural/aquecultural projects
not associated with a NEW _
dock, pier or other structure described in category S
G. EACH WETLAND DRIVEWAY CROSS N with
TOTAL CATEGORY 4 ACTIVITIES
e SFH pursuant to 310 CHR 10.53(3ejciated _
'H. ANY point source discharge
CATEGORY S $2 PER LINEAR FOOT; TOTAL FEET NOT TO BE LESS•
THA j5'p NOR MORE THAN $1000
I. ANY OTHER ACTIVITY not described in categories
A S
A. Construction, reconstruction, REPAIR, or replace- i 56 1
T1,3,4
OTAL CATEGORY 2 ACTIVITIES
ment of DOCKS, PIERS, REVETMENTS, DIKES, or other
engineering structures on COASTAL or INLAND RESOURCE
.21;D._1
AREAS including the placement of RIP -RAP or other
material
ATECORY) E525 PER ACTIVITY
on coastal or inland resource areas
.
TOTAL CATEGORY S ACTIVITIES
. SITE PREPARATION for ANY development other than
for a SFH INCLUDING
1
TOTAL FILING FEE CALCULATED
removal of vegetation,
excavation & grading when actual construction is
N01 proposed under this NOI
$ 4 06
PERSpp CaLCU�ATt�C fEE SCfiEOULE (Print Name)
Jef ery V. Eyes nne
B. CONSTRUCTION OF EACH BUILDING within commercial, —
Industrial,
ADDRESS Schofield Brothers, Inc., P.O.Box 101
'
ofn
is nwhich
is in
ears, MA 653
NUMBER
a BUFFER ZONE or RESOURCE AREA. associated
activities: site preparation
5_ _
retention/detention
basin construction,septic
SIGNATURE
DATE 7411 6P M f'
systems, parking lots,
utilities, point source discharges, sewerage
�—
treatment
`
'MACC Newsletter
Have all obtainable permits, varlan
ces and a
Yes No pprovals required by local by-law been obtained?
' Obtained:
Applied For: Not Applied For:
' Crder•of Conditions under
Yarmouth Wetland Bylaw
9. Is any portion of the site subject to a Wetlands Restriction Order pursuant to G.L.
' c. 130• § 105? Yes r" No IR c.131 • § 4 0A or G.L. '
10. List all plans and supporting documents submitted with this Notice of Intent.
' Identifying
Number -Letter
Title. Date
' Figure 1 Locus Map Portion of USGS Dennis
Quadrangle
Figure 2 Locus Map Portion of the Yarmouth Assessors' Map #8I.;•
Figure 3 Portion of the F.I.R. Map for Yarmouth
Figure 4 Site plan showing Lot N12 and Propose ite
t Improvements. Dated December 31, 1991.by Schofield '
Brothers, Inc.
1
�-NA:-- 1 ti
' Narrave describingthe project.
11. Check those resource areas within which work is proposed.
(a) x Buffer Zone
(b) Inland:
Bank*
Bordering Vegetated Wetland • Land Subject to Flooding.
' Land Under Water Body & Waterwa • Bordering
Y Isolated
(c) Coastal:
' Land Under the Ocean •
G �
'Coastal Beach • Designated Port Area •
Barrier Beach ' Coastal Dune
' w Rocky Intertidal Shore • _� Coastal Bank
Land Under Salt Pond • Salt Marsh •
Fish Run • x Land Containing Shellfish •
x Coastal Flood Plain
• Likely to involve U.S. Army Corps of Engineers concurrent jurisdiction. See General Instructions for
Completing Notice of Intent
3.2
�....
' `12. Is the wetlan
resource area to be altered by the proposed work located On the most recent
Estimated Habitat Map (if any) of rare, "state -fisted" vertebrate and invertebrate animal species
' occurrences provided to the conservation commission by the Natural Heritage and Endangered.:
Species Program? gered
YES [ ) . NO [X ] -Date printed on the E
' NO MAP AVAILABLE [ ) (ify) man•9 an 1 91 stimated Habitat Map issued
If yes, have you completed an Appendix A and a•Notice of Intent and filed•them
' supporting documentation with. the Natural Heritage and Endangered, along with
program b
certified mail or hand delivery, so that the Program shall have received A pend z A prior to the
filing of this Notice of Intent?
YES [ ] No
3.3
' Part It: Site Description
Indicate which of the following Information has been provided (on 8 plan, in narrative description r
' tions)'to clearly, completely and accurately describe existing site conditions. p calcula-
Identifying
' Number/Letter
(of plan, narrative
' ' • • or calculations)
Natural Features:
, ' • . 4 NA-1 ig. Soils r
F,
Fias. 1,4 Vegetation
Topography
' Fi
Fig. 1 (including Open water bodies 1, NA-1 g ponds and lakes)
Flowing water bodies (including streams and rivers)
' Fig. 4 Public and private surface water and groundwater supplies on or within 100 feet of site
-- Maximum annual groundwater elevations with dates and location of test
Pigs. 1.4 Boundaries of resource areas checked under Part 1, item 11 above
— N/A • Other
' Man-made Features:
Fia• 4, � 1
Structures (such as buildings,
' Fig. 4, NA-1 piers, towers and headwalls)
Drainage and flood control facilities at the site and immediately off the site, includ
culverts and open channels (with inverts), dams and dikes ing
NA-1
WA Subsurface sewage disposal systems
---_ Underground utilities
Flg' 4 Roadways and parking areas
Fias. 2 4 Property boundaries, easements and rights-of•way
N/= Other
' Part III: Work Description
Indicate which of the following information has been provided (on a plan, in narrative
bons) to clearly. completely and accurately describe work proposed within each of the resource arescription or eas
' checked in part 1. item 11 above. eas
Identifying
Number. -Letter
' (of plan. narrative
or calculations)
Plainview and Cross Section of:
Fig.. 4, .NA-1 Structures (such as buildings, piers. towers and headwalls)
Drainage and flood control facilities, including culverts an
dams and dikes d open channels (with inverts).
N--/A- Subsurface sewage disposal,systems & underground utilities
1Filling, dredging and excavating, indicating volume and . •
composition of material
Compensatory storage areas, where required In accoedance with Part Ill, Section 10:57
N/A (4) of the regulations .
Wildlife habitat restoration or replication areas
N/A Other
' N/A Point Source Discharge
Description of characteristics of discharge from point source (both closed and open
channel), when point of discharge falls within resource area checked under Part I. item
11 above, as supported by standard engineering calculations. data and plans. including
but not limited to the following:
3.4
1. Delineation of the drainage area contributing to the point of discharge;
2• ' Pre, and post -development peak run-off from the drainage area, at the point of discharge, for at least th
10-year and 100-year frequency storm- • ' e
3. Pre. and Post -development rate of Infiltration contributing to the resource area checke
11 above; - d under Part 1, item
4. Estimated wafer quality characteristics of Pre- and post -development run-off at the Dint
p of discharge.
Part IV: Mitigating Measures
1. • Clearly, completely and accurately describe, with reference to Supporting
Plans
necessary. 9 P and calculations where
(a) All measures and designs proposed to meet the performance standards set forth un
source area specified in Part II or part III of the regulations: or der each re.
(b) why the presumptions set forth under each resource area specified in part 11 or Part III of there
Lions do not apply, gula-
$ Coastal Resource Area Type.
lnta^d end under the ocean/land containing shellfish I Identifying number or letter
of support documents ' I
Please see Narrative
NA-1
'� � � ., .. •' .. � , +, ��.._. _ .gas+�.;-rrrrr•':4�y.3'�Cf:::•.c�-.'vtv: ,;.?!3S-
.fir•. � ;e`,-} t'.� �.:i:•. i n.... • 5.+� f..(;.:: •
' Coastal Resource Area Type:
Inland Land subject to Coastal Storm Flowage (FlooIdentifying
p number
umbe defter
d Plain)
ts
Please see Narrative
NA-1
2. Clearly, completely and accurately describe. with reference to supporting plans and calculations where
' necessary: e
(a) all measures and designs to regulate work within the Buffer Zone so as to ensure that said work -
' does not alter an area specified in Part I. Section 10.02(1) (a) of these regulations: or
(b) If work in the Buffer Zone will alter such an area, all measures and designs proposed to
meet the '
Performance standards established for the adjacent resource area specified In Part II or
Part III of these regulations.
X Coastal Resource Area Type Borcered By t 00-Foot Cfscreaonary tone.
Coastal Beach/Coastal Bank ( Identifying number of letter
Of suMvi cocumems
Please see Narrative '
NA-1
i
t
' 3.6
Part V: Additional Information fora Department of the Army Permit
' . 1. COF Application No. 2 Bass River
(to be provided by COE) (Name of waterway)
' 3. Names and addresses of property owners adjoining your property:
Zh the North: '
Harbour Haven Association, Inc.
C/o Mrs. Stuart Rowe
46 Harbour Hill Road
' South Yarmouth,.MA 02664
r1b the South:
Henry'J. Nassar
P. O. Box 250
Andover, MA 01810
' 4. Document other project alternatives (i.e.. other locations and or con trt
ion that Would eliminate the discharge of dredged or fill material into waters ory elandsjds. particularly those
' No alternatives are feasible.
x 11 " drawings in planvlew and C(OsS•Secfton, showing the resource area and the proposed activ-
ity within the resource area. Drawings must be to scale and should be clear enough for photocopying.
' Please see attached plans.
Certification is required from the Division of Water Pollution Control before the Federal permit can be
Issued. Certification maybe obtained by contacting the Division of Water Pollution Control, Winter Street.
' Boston, Massachusetts 02108.
' Where the activity will take place within the area under the Massachusens approved
Management Program, the applicant certifies that his proposed activity complies with and will be conducted
In a manner that is consistent with the approved program.
Information provided will be used in evaluating the application for a permit and Is made a matter of public
record through issuance of a public notice. Disclosure of this informal►on is voluntary, however, if necessary
Information Is not provided. the application cannot be processed nor can a permit be issued.
hereby certify under the pains ano penalties of perpry that the foregoing Notice of Intent and accom n
plans, documents and supporting data are true and complete. to the best of my knowle0ge Pa y,ng
Signature of Appl,r►t
Date
MID FORM 100
1 MAY 82
Date
"Eottptton to rm; r•rrtm •atS ortto.te t. liOUSACE 6 Mr. 11f2'
REST)..
TAu •otvntat tonto,no o loin Dtroromtat of the Atm% ••t fUlt of Mootorhurtttt •ppl,r•t,,,r for Is ptr,ntt to ot•tou ptt•n.otron to ptrJe•r, ortntt,et to Caltt/ Sut►o ••tyro TAt Olht•
of Ffoaottmrnl •n1 boetrt IU!!bt hro es'""tC lao., 6vtottp" r►a•ur/ I'% the l'S Arm• C•rlt
of Enttnttrt OMB Aenat► 0*02.0036 ono otperstion 9814' Of JO StpltmEtr 110F3 oppl,t• TAn
otoltment •ttl tt tit to 6 point tlpt
3.7
Q
BBSCHOFIELD
BROTHERS,INC.
ENGINEERING -SURVEYING -PLANNING
I
NARRATIVE NA-1
The area subject to this Notice is land in and adjacent to Bass
River in South Yarmouth, MA. Please see Locus Map (Figure 1) for
exact location.
The site is a residential parcel with an existing dwelling and
existing timber pile supported pier, ramp and float. To the river
side of the dwelling the land is very low (el = 3-6 NGVD), and
flat, resembling a beach plain with clean fine sand sparsely
vegetated with American beach grass. This low exposed face of the
dwelling received a dose of flooded Bass River tidal water during
recent weather related coastal floods.
The pier is of a typical timber construction located predominantly
in the intertidal zone. A ramp and float provide additional
length to reach somewhat navigable water at low tide. The tidal
flat in this region is considered a shellfish resource. The river
bottom is shallow and silty with pockets of eel grass in
locations.
The project is two fold:
1. Earth fill is proposed for the area east of and adjacent to the
dwelling. See plan for proposed elevation contours. The fill
is intended to significantly protect the cellar area in the
event of a coastal flood event of any significant magnitude.
Closing in the cellar window and walkout openings with mortared
and sealed joints and creating a vegetated bank will blend in
very well with the surrounding area, furthering the interests
of flood protection for the subject property and those
adjacent.
The coastal flood plain is not necessarily significantly
impacted by a volume of fill. The subject flood zone is an "A"
zone not a zone of velocity flood water where scour may be of
greater concern. No compensatory volume need be created, as we
are dealing with a coastal flood zone. The fill project shall
not affect utilities as there are none in the project area. The
subsurface sewage disposal system is on th.e street side of the
dwelling.
All construction access to deposit and landscape the proposed
' filled bank area shall be via the route shown on the plan in
conformance with staked work limits. The toe of the proposed
slope shall be temporarily stabilized with staked hay bales
' until such time as the proposed bank has been vegetated in
accordance with the site plan. Snow fencing is recommended to
control foot traffic and reduce wind velocity near the slope.
E--=--`-`SCH0FIEI.D
BROTHERS,INC.
ENGINEERING -SURVEYING -PLANNING
Additional measures for stabilization and mitigation also
' appear on the site plan:
. Downspouts and drywells or gravel drains shall be provided to
' contain roof runoff.
. No chemical fertilizer shall be used to supplement plantings.
. No construction activity shall take place beyond the staked
' work limit or silt fence except that necessary for pier
construction and maintenance.
. Planting may take place beyond the work limit.
. Snow fence shall be staked in place along the toe of slope
' during the off season as a minimum.
2. The Pier Extension
Due to long term shoaling of this reach of the river, depth of
water at low tide is a diminishing quantity. The applicant seeks
' to extend the permanent portion of the existing pier approximately
12 feet for a total length of 60 feet +/-. An additional 8'W x
16'L float shall be connected to the existing 8'W x 20'L float to
provide access to adequate navigable water. See Plan for details.
The pier, damaged in Hurricane Bob, requires complete
reconstruction. In so doing, the total number of support pilings
' shall remain the same with the extension.
There is no salt marsh vegetation near the work area associated
' with the pier or any aspect of the project.
All accessible pier pilings shall be hammer driven where possible.
All timber shall be wolmanized for marine application. All
' hardware shall be steel, hot dip galvanized. During the off
season, the existing float shall be stored at an upland site.
' The project, as proposed, serves to further the interests of the
MGL Chapter 131 and the Yarmouth Wetland Bylaw. The fill bank
furthers the interests of storm damage prevention via a "soft
solution"; the proposed pier extension and reconstruction reduces
piling number and provides improved navigability at the site where
the riparian access has been well established.
' December 23, 1991
0-8331
' Figure 1 - Locus Map
Portion of U.S.G.S.
' Dennis Quadrangle Map
Scale: 1" = 2,083'
BE3 SCHOFIELD
BROTHERS,INC.
ENGINEERING -SURVEYING •PLANNING
I � �P� moo° ♦� � j
9
oil
�3VI A
/ � � S N ♦y •��y S1 \VV ♦ ♦ti � N ty •� � �
01
e• My, + y` y 1Q�Oo +•ae $�i� +°: �: , �0 GU
l� y
y
1 ♦ ' GZ �� ,t` fill
.16
1 w
As 0 .16l0
fie! +♦1 Q 4 s 0 46
E' INSERT
SIXT _
D� 1 FOR 1.0! IN THIS AREA .
1 Fi
gure 2 Locus Map
Portion of the Yarmouth
1 Assessors' Map #81
1 •
1
i
0o SCHOFIELD
BROTHERS,INC.
AbRTENRE��
ORIVE
ZONE
CYPRESS
POINT
WAY
zoo
PJ �J.B
6J MONTEREY
LANE
s es
BURNING r:
TREE LANE
SNUG HARB
DRIVE_
ZONE B
' N pYS=ER
.1 RpAO
HIGHGROVE ZONE B
KENRICK
THIMBLEBERRY WAY
9p LANE
SALT BOX ROAD BOAT HAUL
O
Z
ZCC <
w�CC FAIRWAY
I ROAD '
ZONEB
Figure 3 --Portion of the
Flood Insurance Rate Map
Yarmouth Panel-4 of 7
ZONE C
RM1
./ \ 17nnlG
ZONE B �o//
0U;)
ooSCH®FIELD
BROTHERSINC.
�.nc�ncFRinc,•���K��ri•inc•rL,»n�i�c,
. .. . ......
. .... .. ........
. ... . ......
. . . . . . . . . .
.. . ..... .... .... ... . ....
....... ....
.. . . ........
..........
............
..... .......
. . . .. ..........
...........
.. ...... ......
.. .. ...............
. . . . . . . . . .
........ ..... ...
..........
................. ....... ...... . ..
........... ...................
..........
..........
. ....... ...
.. .. ... ... .....
.. ..... ... ...
44W 44
. . ......... ............. .... ..... ..
9i
25
......... .
.. ... ....... ... ....
7 X
...............
.............. ... .............. .. .
..... ......... ... . ..... . ...
........... . .............
..............
.......... I .........
..........
.............. ..
.................
...........
.........
.
•