Loading...
HomeMy WebLinkAbout83-1176 - Site PlanSOUTH YARMOUT S V, RUN RD. RUN N PD. d j CJ _vpV LOCATION MAP Gj �ot,� N, \. �4k i 6 9• \\e5 I .4 \A30 IRA t c LOT 1258 \ x IPA a CONCRETE SIDEWALK AND BITUMINOUS CONCRETE ARE TO BE REPLACED AFTER SEPTIC SYSTEM IS INSTALLED. BITUMINOUS CONCRETE IS TO BE A MINIMUM OF 3'' THICK WITH A BASE OF 6" HARDENINGMINIMUM. r � v. KEY EXISTING ELEVATIONS 10x5 EXISTING CONTOURS crv/ PROPOSED CONTOURS c. TEST PIT LOCATION CATCH BASIN UTILITY POLE MANHOLE COVER 24' HEAVY DUTY FRAME "13 n I -Iqv r«=1Itzni Iliaa�vIll o zIUs?to;; ,ll ukzd wslu ..AND COVER SET TO GRADE. - DRAINA __� 6"WALL • 6" WALLS `J --SENT 8'b1A.INLET� CHECK , -1- VALVE \ "�_` a ,.. g,.. •>. g"DIA. v ID,r Q �. 3" $ 3" uneT r T 3/8" GRILLED p i. \ TRICKLE ` 11 HOLE s' -I 5 -g'„ ..LIQUID T' -It) LEVEL LOT 125C ,* , :' •:nt: .->• .'t. ..p, r- ... :.r, •_ r:': 3" SCHEDULE ..� 75,345 S. F 40 PVC \ / CROSS SECTION VIEW . 1000 GALLON ;\ PUMP CHAMBER % 4000 GALLON DUPLEX SYSTEM ON DISTRIBUTION i)\\ SEPTIC TANK RAIL SYSTEM BOX (LOW PROFILE TANK MAY BE USED) 9 OUTLET O EXISTING 3000 GST TO BE PUMPED, REMOVED OR CRUSHED AND FILLED WITH CLEAN SAND, SEPTIC' SYSTEM INVERT ELEVATIONS CROSS SECTION \ PROPOSED SEPTIC TANK DX IN 9.00 BOX OUT 8.83 3 LEACHING SYSTEM IN 8.50 6.22 SEPTIC TANK IN V. PROPOSED 16 FLOW DIFFUSORS WITH EXISTING GRADE 11.6 TO 11,2' 3 �y\0 STONE AROUND AND 8 ACCESS CHIMNEYS , �� WITH MANHOLE COVERS, EACH SET 54 -r• ,,,,..,,/„ ,;.., e 6 \\ \ v2 LONG BY 5.5 ,WIDE O \ • \ �\ c+ HIGHEST OBSERVED -2.8 \� :\119 WATER LEVEL \ \ N SEPTIC TANK OUT LEACHING SYSTEM BOTTOM \� ?� BENCHMARK ELEV. ON NAIL 11.06 6.05 ZOO 9 PUMP CHAMBER OUT ' 5.83 PUMP ALARM ON= 4,83 PUMP LAG ON = 4.83 \�L \\ • LEACHING SYSTEM AND CONTAMINATED PUMP ON = 4.33 \ SOIL TO BE REMOVED. PUMP OFF = 2.33 P PN \ • \\\ 9�tn IT SHALL BE THE RESPONSIBILITY OF THE INSTALLER TO NOTIFY STANLEY \2e0 R. SWEETSER INC. AND THE BOARD OF HEALTH WHEN READY FOR THESE �\ INSPECTIONS. FAILURE TO NOTIFY OR`COMPLETE-INSPECTIONS WILL RESULT .\ IN NON -CERTIFICATION OF SYSTEM. \ ALL PIPING WITHIN 10' OF THE BUILDING SHALL BE INSTALLED 1N ACCOR- DANCE, WITH THE MASSACHUSETTS PLUMBING CODE. :\ DUNES B COASTAL \0®h \0+0 BEACH \ O\AQ g oEO� SOIL TEST DATA HIGHEST OBSERVED WATER LEVEL ELEV. = 2.8 N. G.V. D. ELEV. DEPTH 900 FULL MOON HIGH TIDE 11.2 oII �E LOWEST OBSERVED WATER LEVEL 11.0 ASPHALT 3" GONORA i = 2.3 N.G.V.D. LOW TIDE 9.0 SUBSOIL 27" 5 MEDIUM :I SAND 2.3 WATER 0.9 1241, y •., 1�Ir N Q for 11 WATER FOUND WATER FOUND TEST MADE TEST MADE 12 18/91 tn�1v pati o WITH WITH D. MASON ,,��•°,t°=� ,, �� omJjD �ofj11 11.E PERC RATE LESS THAN 2 MINUTE PER INCH DROP D 21/2" 45 3M" VENT PIPE DETAIL 4" SCHEDULE 40 PVC ? GALVANIZED tea• R/ SCREEN 3 EXISTING IIJ �N 111 \a Ml // ,1/i/1�1//.• GRADE 18" HEAVY DUTY CAST IRON COVER SET TO GRADE INSPECTION MANHOLE ACCESS CHIMNEY TO BE MORTARED _(11=III=fII=l11=III=III-�,-� =III -Ill III_ t _ 'F'Z_ 4" VENT VIII= 1!1 111 =11- PIPE SCH. INFLUENT PIPE II=1)r!!t 111=1_- III=tl1- 40 PVC `c 11 I t =Yt\S 111 _/1 It I 0000000 .: e=oopa°° 2" MIN. 1/8" - 1/2._S--' 000 o<a nrao3 o°m WASHED STONE p0a61g ?i; o..• apo a0oo 3/4" -I/2" WASHED STONE 1 X11-1t1=1t1 .''•I�E11�4 V 1 -I _II IIl=jtMk= Ilt III=11( 18" r 18" CONCRETE SPLASH PAD 7/2" HOLE FIBERGLASS MESH OR PLASTIC DESIGN CALCULATIONS FOR MOTEL UNITS' 22 UNITS 9 S60 S.F OFFICE \ \\ p NOTES PUMP CHAMBER NOTES STONE SIDES EA 1' �0 SIDEWALL= HEIGHT 0LRENGTH • WIDTH)29 1.5' [(54' t 5.5 )2] = 178.5 0 X 2.5 GPO/o =446.25 GPD \ �A 54' X 5.5' OF EXCAVATION AND FILL, THE CONTRACTOR 1) PROPOSED ARE 2 PUMPS AND THEY ARE TO 1902 TOTAL(4SETS) = 2973 GPD DESIGN FLOW = 2459 GPO WITHIN THE LIMITS GpO T SHALL REMOVE ;ALL UNSUITABLE MATERIAL' AND BACKFILL WITH ALTERNATE EACH SEQUENCE. CLEAN SAND. G 2) PUMPS ARE TO BE MYERS WHV - 5 OR EQUIVALENT. 02 ®gINSTALLATION OF THE SEWAGE DISPOSAL SYSTEM SHALL BE -INSPECTED SPECIFICATIONS 1/2 HORSEPOWER, SINGLE PHASE MOTOR STANLEY R. SWEETSER INC. AND BY,THE BOARD OF HEALTH. WITH A MINIMUM OF 60 GPD AT 22 T.D.H. 0 \ e .\• INSPECTION 111 I SHALL BE MADE WHEN EXCAVATION IS COMPLETE AND3) EACH PUMP IS TO HAVE A PUMP OFF, PUMP ON, ALARM BEFORE BACKFILLING BEGINS. ON AND LAG ON CONTROLS. ®0 O \ \\ m INSPECTION #2 SHALL BE MADE WHEN BACKFILLING AND COMPACTING \2 OF SELECT GRAVEL HAS BEEN COMPLETED. 4) THE ALARM PANEL WITH BELL IS TO BE LOCATED IN \ THE MANAGER'S OFFICE. INSPECTION #3 SHALL BE MADE WHEN COMPLETE SYSTEM HAS BEEN INSTALLED AND BEFORE COVERING OVER. 5) PUMPS SHALL BE EQUIPPED WITH AN ALARM POWERED \ BY A CIRCUIT SEPARATE FROM THE PUMP POWER. IT SHALL BE THE RESPONSIBILITY OF THE INSTALLER TO NOTIFY STANLEY \2e0 R. SWEETSER INC. AND THE BOARD OF HEALTH WHEN READY FOR THESE �\ INSPECTIONS. FAILURE TO NOTIFY OR`COMPLETE-INSPECTIONS WILL RESULT .\ IN NON -CERTIFICATION OF SYSTEM. \ ALL PIPING WITHIN 10' OF THE BUILDING SHALL BE INSTALLED 1N ACCOR- DANCE, WITH THE MASSACHUSETTS PLUMBING CODE. :\ DUNES B COASTAL \0®h \0+0 BEACH \ O\AQ g oEO� SOIL TEST DATA HIGHEST OBSERVED WATER LEVEL ELEV. = 2.8 N. G.V. D. ELEV. DEPTH 900 FULL MOON HIGH TIDE 11.2 oII �E LOWEST OBSERVED WATER LEVEL 11.0 ASPHALT 3" GONORA i = 2.3 N.G.V.D. LOW TIDE 9.0 SUBSOIL 27" 5 MEDIUM :I SAND 2.3 WATER 0.9 1241, y •., 1�Ir N Q for 11 WATER FOUND WATER FOUND TEST MADE TEST MADE 12 18/91 tn�1v pati o WITH WITH D. MASON ,,��•°,t°=� ,, �� omJjD �ofj11 11.E PERC RATE LESS THAN 2 MINUTE PER INCH DROP D 21/2" 45 3M" VENT PIPE DETAIL 4" SCHEDULE 40 PVC ? GALVANIZED tea• R/ SCREEN 3 EXISTING IIJ �N 111 \a Ml // ,1/i/1�1//.• GRADE 18" HEAVY DUTY CAST IRON COVER SET TO GRADE INSPECTION MANHOLE ACCESS CHIMNEY TO BE MORTARED _(11=III=fII=l11=III=III-�,-� =III -Ill III_ t _ 'F'Z_ 4" VENT VIII= 1!1 111 =11- PIPE SCH. INFLUENT PIPE II=1)r!!t 111=1_- III=tl1- 40 PVC `c 11 I t =Yt\S 111 _/1 It I 0000000 .: e=oopa°° 2" MIN. 1/8" - 1/2._S--' 000 o<a nrao3 o°m WASHED STONE p0a61g ?i; o..• apo a0oo 3/4" -I/2" WASHED STONE 1 X11-1t1=1t1 .''•I�E11�4 V 1 -I _II IIl=jtMk= Ilt III=11( 18" r 18" CONCRETE SPLASH PAD 7/2" HOLE FIBERGLASS MESH OR PLASTIC DESIGN CALCULATIONS FOR MOTEL UNITS' 22 UNITS 9 S60 S.F OFFICE { SEPTIC TANK:2459 X 150%..361919.5 USE A 4000 GALLON TANK USING t6 -1.5'X3.5X13' CHAMBERS WITHI'"'• STONE SIDES EA 1' STONE END` SIDEWALL= HEIGHT 0LRENGTH • WIDTH)29 1.5' [(54' t 5.5 )2] = 178.5 0 X 2.5 GPO/o =446.25 GPD BOTTOM= LENGTH X WIDTH 54' X 5.5' = 297 X 1.0 GPO/m = 297 GPD 475.5 TOTAL (I SET) GPD/L71 = 743.25 GPD 1902 TOTAL(4SETS) = 2973 GPD DESIGN FLOW = 2459 GPO RESERVE = 514 GpO NOTES ELEVATIONS SHOWNARE IN FEETABOVE: NATIONAL GEODETIC VERTICAL DATUM OF 1929. THERE IS TO BE ONE FOOT OF GROUND COVER OVER THE SEPTIC SYSTEM. CONSTRUCTION OF THE SEPTIC SYSTEM IS TO CONFORM TO THE STATE SANITARY CODE, TITLE V, AND THE TOWN OF YARMOUTH BOARD OF HEALTH REGULATIONS. DESIGN LOADING OF SEPTIC SYSTEM SEPTIC TANK = H - 20 STRENGTH DIST. BOX = H - 20 STRENGTH LEACHINGCHAMBER=H- 20 STRENGTH PUMP CHAMBER= H- 20 STRENGTH ALL PIPING IS TO BE 4" SCHEDULE 40 PVC OR EQUIVALENT UNLESS NOTED OTHERWISE. SEPTIC SYSTEM REPAIR SITE PLAN OF LAND IN SOUTH YARMOUTH, MASSACHUSETTS AS PREPARED FOR OCEAN CLUB RESORT JANUARY 17, 1992 SCALE: I"= 30' 0 15 30 60 90 120 STANLEY R. SWEETSER,INC. 97 SEA STREET DENNISPORT, MASS. 02639 (508) 398-3922 YB92 PLAN REF. LAND COURT PLAN 14114 C DATED 8/2/39 BY WHITNEY & BASSETT SHEET I OF 2 T.A.W. i