Loading...
HomeMy WebLinkAboutEngineered Plan - 2015LEGEND- - 99- ALL SHALL BE TEM SYSTEM PROFILE TTAPE X 99.1 EXIST. SPOT ELEV. MARK DS WITHCMAGNETIC OR PROPOSED CONTOUR 198.41 (NOT TO SCALE) COMPARABLE MEANS FOR FUTURE LOCATION. TH1 4. DESIGN LOADING FOR ALL PROPOSED PRECAST PROVIDE MIN. 20" DIAM. WATERTIGHT TEST HOLE 2� CAST IRON ACCESS COVERS TO GRADE CAST IRON COVER GRADE rond UTILITY POLE 2" PEASTONE OR GEOTEXTILE FIRE HYDRANT TOP FOUND. EL. 25.3' FILTER FABRIC OVER STONE NOT TO BE USED FOR LOT LINE STAKING OR ANY 24.5' MINIMUM .75' OF COVER OVER PRECAST 2% SLOPE REQUIRED OVER SYSTEM 21.0'-24.0' OTHER PURPOSE. NOTE: 2" MIN. WALL JF_ ' PRECAST H -to THICKNESS REQUIRED BLOCKS OR CONCEALED WITHOUT INSPECTION BY BOARD OF RISERS (TYP.) a, 2'0 PRECAST RISERS 4"OSCH40 PVC MORTAR ALL H-� OF HEALTH. 6" MIN. SUMP PIPES LEVEL 1 ST 2' COMPONENTS 12" MIN. INT. DIM. ENDS (TMP') 2 SIDES 20.25' *23.3' 10" 1500 GAL H-20 14~ Po "" o� ° ° ° ° 'o 0000 ono °o_° �. 20.02 TEE SEPTIC TANK TEE 19.77' OVERHEAD UTILITIES PRIOR TO COMMENCEMENT OF WATERTEST D'BOX 11. ANY UNSUITABLE MATERIAL ENCOUNTERED °oo°o°o°o-0-o 0 0 0 0 0 0°° GAS BAFFLE ;• ° ° ° ° ° ° FOR LEVELNESS°°°°°° °���� ° ,° SHALL BE REMOVED 5' BENEATH AND AROUND THE ° ° > 17.42 4' LIQ. LEVEL (ACME OR EQUAL) 19.69' 19.52' AND REMOVED OR PUMPED AND FILLED WITH CLEAN ,': opo°o°o°o°o°o°o°o°o°o°o°o°o°o°S°o°o°o°o°o°o°o `- SAND. �000°o°o0o„o„o,,o,,00°000°0000�o�o�o„o,�o"00000. H-20 500 GAL. LEACHING CHAMBER BY ACME PRECAST OR 3/4"-1-1/2"DOUBLE WASHED STONE 4 MIN. EQUAL. (4) LINITS REQUIRED ALL AROUND PRECAST STRUCTURES 6" CRUSHED STONE OR MECHANICAL OVERALL DIMENSIONS TO OUTSIDE OF STONE: 33.5' X 12.83' COMPACTION. (15.221 [2]) C14 LO 3O 12.0' BOTTOM TH-1 1 ( % SLOPE) ( % SLOPE) (-1-7. SLOPE) NO GROUNDWATER FOUND FOUNDATION 11' SEPTIC TANK 8' D' BOX 12' LEACHINGFACILITY LEGEND- - 99- EXISTING CONTOUR X 99.1 EXIST. SPOT ELEV. -[991-- PROPOSED CONTOUR 198.41 PROPOSED SPOT EL. TH1 4. DESIGN LOADING FOR ALL PROPOSED PRECAST a TEST HOLE 2� SLOPE OF GROUND rond UTILITY POLE 'vast FIRE HYDRANT NOTE: NOT ALL SYMBOLS MAY APPEAR IN DRAWING TEST HOLE LOGS ENGINEER: CRAIG J. FERRARI, SE #13871 WITNESS: AMY VON HONE, RS DATE: 10/28/15 PERC. RATE _ < 2 MIN/INCH CLASS I SOILS ELEV. 1 p" 4 24.0' LS 12" 1OYR 3/1 B LS 38" 1OYR 5/8 20.8' C PERC MS 1OYR 6/6 144" I 112.0' NO GROUNDWATER ENCOUNTERED LICE # 15-285 OPTION *THE INSTALLER SHALL VERIFY THE LOCATIONS OF ALL UTILITIES AND ALL BUILDING SEWER OUTLETS AND ELEVATIONS PRIOR TO INSTALLING ANY PORTION OF SEPTIC SYSTEM *NOTE: INTERIOR PLUMBING TO BE RE-ROUTED TO EXIT THE DWELLING IN LOCATION SHOWN ON PLAN VIEW. EXISTING TWO INVERTS TO BE CONNECTED INTO ONE. PLUMBER TO CONFIRM FEASIBILITY PRIOR TO INSTALLING ANY PORTION OF THE SEPTIC SYSTEM SAWCUT AND PATCH PAVEMENT AS REQUIRED x 22.81 VARIANCES REQUESTED: UNDER MAX. FEASIBLE COMPLIANCE 15.405: (1b): REDUCTION IN SETBACK, SAS TO FOUNDATION (20' TO 14.6') (1B): SAS TO BE > 3' BUT < 6' BELOW FINISH GRADE (VENT AND H-20 PROVIDED) x 26.64 /^19.94 NOTE: INTERIOR PLUMBING TO BE REROUTED AND CONNECTED. PLUMBER TO CONFIRM FEASIBILITY PRIOR TO INSTALLATION OF ANY PORTION OF THE SEPTIC SYSTEM SILL AT W/O DOOR = 18.0' VENT NOTES 0 OId S 1. DATUM IS NAVD 88 0 a s NEricP5 i on 2. MUNICIPAL WATER IS EXISTING oorin9 3. MINIMUM PIPE PITCH TO BE 1/8" PER FOOT. 4. DESIGN LOADING FOR ALL PROPOSED PRECAST a UNITS TO BE AASHO H-22 bon Ni h 5. PIPE JOINTS TO BE MADE WATERTIGHT. rond 6. CONSTRUCTION DETAILS TO BE IN ACCORDANCE 'vast WITH 310 CMR 15.000 (TITLE 5.) 7. THIS PLAN IS FOR PROPOSED WORK ONLY AND NOT TO BE USED FOR LOT LINE STAKING OR ANY OTHER PURPOSE. 8. PIPE FOR SEPTIC SYSTEM TO SCH. 40-4" PVC. 9. COMPONENTS NOT TO BE BACKFILLED OR CONCEALED WITHOUT INSPECTION BY BOARD OF HEALTH AND PERMISSION OBTAINED FROM BOARD OF HEALTH. 10. CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING DIGSAFE (1-888-344-7233) AND VERIFYING THE LOCATION OF ALL UNDERGROUND & OVERHEAD UTILITIES PRIOR TO COMMENCEMENT OF WORK. 11. ANY UNSUITABLE MATERIAL ENCOUNTERED SHALL BE REMOVED 5' BENEATH AND AROUND THE PROPOSED LEACHING FACILITY. 12. EXISTING LEACHING FACILITY SHALL BE PUMPED AND REMOVED OR PUMPED AND FILLED WITH CLEAN SAND. Permit valid for REPAIR t►I SFI'II(' SYSIEM ONI,Y, due to State and 1 ,u al septic variaitves. Board, of Itealth resiew and apliimal is ieyuucd fur any f store to sewage facilities and/or Yarmouth lleaalsh Oupartancnt A11PR0N" E1) /�ee 'e�l (w ame Date 5' REMOVAL OF UNSUITABLE SOIL REQUIRED AROUND PORTION OF PERIMETER OF LEACHING FACILITY, DOWN TO SUITABLE SOIL LAYER. REPLACE WITH CLEAN MED. SAND, TO MEET SPECIFICATIONS OF 310 CMR 15.255(3) 't.80 PROP. VENT WITH CHARCOAL FILTER AND BUGSCREEN (FINAL PLACEMENT BY 18.47 CONTRACTOR WITH HOMEOWNER PROVIDE 28' OF 40 MIL LINER AT 5' CONSULTATION) OFF SAS IN AREA SHOWN. TOP AT ELEV. 19.5', BOTTOM AT EL. 15.5'± Scale: 1 "= 20' 0 10 20 30 40 50 FEET RECEIVED MAR 2 5 2016 HEALTH DEPT. LOCUS MAP NOT TO SCALE ASSESSORS MAP 92 PARCEL 15 SYSTEM DESIGN: GARBAGE DISPOSER IS NOT ALLOWED EXISTING 4 BEDROOM DWELLING DESIGN FLOW: 4 BEDROOMS @ 110 GPD = 440 GPD USE A 440 GPD DESIGN FLOW SEPTIC TANK: 440 GPD (2) = 880 USE A 1500 GAL. SEPTIC TANK LEACHING: SIDES: 2 (33.5 + 12.83) 2 (.74) = 137 GPD BOTTOM 33.5 x 12.83 (.74) = 318 GPD TOTAL: 615 S. F. 455 GPD USE (3) 500 GAL. LEACHING CHAMBERS (ACME OR EQUAL) WITH 4' STONE ALL AROUND APPROVED DATE BOARD OF HEALTH I -L-1-15 DATE DANIEL A. OJALA, P.E., P.L.S. , MA TITLE 5 SITE PLAN OF 12 GRANDVIEW DRIVE SOUTH YARMOUTH, MA PREPARED FOR ALFRED NEAL DATE: DECEMBER 4, 2015 off 508-362-4541 fax 508-362-9880 downcape.com down cape engineering, ifc. civil engineers land surveyors 939 Main Street ( Rte 6A) YARMOU THPOR T MA 02675 15-285 NEAL.DWG m 0 OId S 0 a s NEricP5 i on oorin9 LOCUS a bon Ni h o rond 'vast Hidd Shore5 LOCUS MAP NOT TO SCALE ASSESSORS MAP 92 PARCEL 15 SYSTEM DESIGN: GARBAGE DISPOSER IS NOT ALLOWED EXISTING 4 BEDROOM DWELLING DESIGN FLOW: 4 BEDROOMS @ 110 GPD = 440 GPD USE A 440 GPD DESIGN FLOW SEPTIC TANK: 440 GPD (2) = 880 USE A 1500 GAL. SEPTIC TANK LEACHING: SIDES: 2 (33.5 + 12.83) 2 (.74) = 137 GPD BOTTOM 33.5 x 12.83 (.74) = 318 GPD TOTAL: 615 S. F. 455 GPD USE (3) 500 GAL. LEACHING CHAMBERS (ACME OR EQUAL) WITH 4' STONE ALL AROUND APPROVED DATE BOARD OF HEALTH I -L-1-15 DATE DANIEL A. OJALA, P.E., P.L.S. , MA TITLE 5 SITE PLAN OF 12 GRANDVIEW DRIVE SOUTH YARMOUTH, MA PREPARED FOR ALFRED NEAL DATE: DECEMBER 4, 2015 off 508-362-4541 fax 508-362-9880 downcape.com down cape engineering, ifc. civil engineers land surveyors 939 Main Street ( Rte 6A) YARMOU THPOR T MA 02675 15-285 NEAL.DWG m