Loading...
HomeMy WebLinkAbout2015 Dec 29 - Email from Downcape Engineering' vonHone, Amy o From: Daniel Gonsalves<dgonsalves@downcape.com> Sent: Tuesday, December 29, 2015 10:59 AM To: vonHone, Amy Subject: 12 Grandview Drive Attachments: 15-285 NEAL SEPTIC OPTION 2.pdf Amy, The pians for Early Red Berry Lane are done and should get delivered either today or tomorrow. I had a question about a plan we are doing for 12 Grandview Drive.They currently have two inverts out of the house that feed five cesspools.We will need to pump up to the leaching from the rear invert. Because we will have a tank in the front can I combine the two tanks I show in the back into one 1500 gallon septic tank/pump chamber combo? I am not sure what the split in the design flow is between the front and rear but we still should have enough daily storage capacity. I have attached a pdf for your reference. Let me know what you think. Thanks, Danny E. Gonsalves, EIT Engineer in Training Down Cape Ens�ineerina, Inc. Tel:508-362-4541 Fax:508-362-9880 This Electronic Message contains information from the engineering firm of down cape engineering,inc., which may be privileged. The information is intended to be for the use of the addressee only. If you are not the addressee,note that any disclosure,copy,distribution or use of the contenis of this message is prohibited. 1