Loading...
HomeMy WebLinkAbout83-1219 - Septic System DetailsAPPLY 4" ORG. LOAM AND 15' MIN. SEED WITH NATIVE GRASSES DO NOT PLAN BEACH GRASS WITHIN TEN FEET OF LEACH FIELDS (NIC) PLANT DISTURBED AREAS WITH BEACH GRASS 2" MIN. PEASTONE 10 LIMIT OF CLEAN SAND FILL (NIC) r3 '.:: +•. ' : : '.•. '.: 1 ORDINARY FILL SLOPE PERF. PIPE: 'O:ObSFTfFT" qpm SCH40 PVC VENT �1M 1I1 ELEV: 7.7' �7 tl41i iL IG =. VARIES- 6" ARIES 74"0 6" MIN2 SCH40 PERF. PVC --ELEV_ 6.7-_ _--- -.�---==------------------------- --- --_ ----------- -1/2" WASHED STONE EXISTING GRADE LIMIT OF SOIL REMOVAL IS 25 FEET LATERALLY IN ALL DIRECTIONS FROM THE PROPOSED LEACHING FIELDS. (SEE SHEET 1) THE DEPTH OF REMOVAL VARIES FROM SEVEN TO TEN FEET FROM EXISTING GRADE. DEPTH OF REMOVAL SHALL BE DETERMINED BY THE ENGINEER DURING FIELD INSPECTION OF THE EXCAVATION MEDIUM SAND FILL J PROCESS. REMOVAL WILL EXTEND THROUGH PEAT, DEBRIS AN SANDS WITH FINES IN EXCESS OF FOUR PERCENT BY WEIGHT. moi-. � i'• i 'i`, ..i ,. .� .. . SECTIO1 15' MIN. A-A(SHEET 1), GROUNDWATER OBSERVATIONS 1/2" - 1'- 0" YKV SNI .W Al _EiE.�Af 4rJ PARKERS MMR W.TF.L_GQNMEN:S Wti.L B-1 WELL B-7 WELI. 8--3 WELL B-4 WELL B-5 cuVAna� 1+/14 /89 11/14/89 11 /14/89 11/15/89 11/15/89 DATE TIME - TIMf OF MEASUPEM ENT HIGHJi TIDE 11/27 3.30 PM 11.•R AM 2.41 196 2.00 1.76 2.02 12/07 7 30 AM ':26 AM 2.52 2.26 2.3 2.26 2.32 12/11 7:30 AM 11:03 AM 1.71 1.76 1.7 1.86 1.72 12/13 1:10 PM 12:45 PM 2.62 2.46 2.65 2.66 2.52 3.33 STOCKADE FENCE AT PROPERTY LINE 25' MIN. PLANT DISTURBED AREAS WITH BEACH GRASS 4"0 SCH40 PERF. PVC 10 LIMIT OF CLEAN SAND FILL (NIC) 2" MIN. PEASTONE 77Z// ORDINARY FILL IlAid ,A .. VARIES - 1 _ -:Y FAIR _ _ __�_ _ _ _ _ _ _ _ T- r _ _ _ - _ _ _ _ - _ _ 4� _ _ _ _ _ _ _ _ _ 1U---1 6' J3'- 3" r-f-----------------i�G---- ------------- -----------..- �-----Imo---------- ---_-- 3/4" TO 1-1/2" WASHED STONE J MEDIUM SAND FILL x � 4" PVC ECTION B -B (`. 1/2" = 1'- 0" CONC. INV. HD. C.I. FRAME k COVER r FIN. GRADE \ BRICK ADJ COURSE \ PC TANK RISER REINF. CONC. CON C. INV. I \ FLOW / A 1.0e - 1.42 #4 ® 8" E.W. 1.42 2" MIN. COVER 2.42 PLAN SECTION A -A SEWER MANHOLE 1/2" = 1'- 0" 4" PVC 1/2" = 1'- 0" L1 TANK WIDTH VARIES q - 2'-2"- 2'- 10"- 26 -2'-10"- LEBARON LT105, 430LBS iA 26 = FULL MORTAR BED BRICK ADJ. COURSE PC CONC. RISER .. IF 'D' EXCEEDS 18" TOP OF STRUCTURE SECTION A -A TYPICAL TANK- ER, ANKER, FRAME & D 1/2" = 1'- 0" SPECIFI( DNS cc �. Dense Graded Stone Base: Dense graded stone base shall comply with Mass. DPW Standard Specification M2.01.7 as amended except that the aradation requirements shall be as follow=_: Sieve size Percent Passinq 1-1/2" 100 3/4" 00-100 #4 30-60 #50 10-35 #200 2-10 G. Where water service pipes cross septic system pipe both pipes shall be placed such than no joint occurs within ten feet offhe crossino. Encase water pipe in 2" Sch40 PVC for ten feet either side of the crossing. Fill space between service pipe and encasement with mortar at both ends of the PVC. PART 3 EXECUTION 3.01 INSPECTION A. General: 1. Examine areas and conditions under which septic system's materials and products are to be installed. Note that the base of precast system components will be located as much as five feet below hiah groundwater level. Provide dewatering durino construction sufficient to reduce groundwater to at least one foot below the base of each component to allow excavation and placement of foundation materials on undisturbed soil. and proper compaction of backfill materials. �. Do not proceed with Work until unsatisfactory conditions have been corrected in a manner acceptable to Engineer. Mak,­ sufficient subsurface investigations to determine the extent of existina septic system leaching area and components. Obtain approval of the Yarmouth Board of Health for disposal site and method of disposal for exlstlno system Components. 3.02 INSTALLATION A. Existi.nu Septic System: Preserve existing buildino sewers whicn may be properly connected to new components. Pump existing components dry and remove to the level of the lowest invert in the structure or to such depth or extent as required for placement of new construction. Fill remainlna volume in precast structures with clean sand sufficiently compacted to maintain the level of finish orad-. B. Septic System Pioina: 1. Make all PVC joints permanently gas and watertight usino appropriate solvent -weld methods. _. Make all Pipe connections at knockout locations provided in Precast structures. 3. SUopprt Pipe at prover elevation and fill openino aroupn D>_oe with mortar. �. Flat- nioina on firm and undisturbed base of natural soil or compacted fill and backfill with clean granular soil properly compacted. C. Septic Tank. Grease Traps. Pump Pits and Distribution Boxes: 1. Place on level base of 3/4" to 1-1/2" washed stone at least one foot in depth. 2. Backfill with clean granular soil compacted to 90% of maximum dry density as determined by ASTM D.699 or AASHO D:T99. 3. Assemble tank components in accordance with manufactures instructions to achieve guaranteed watertight structures. Assemble tanks in dewatered excavations, pump dry and demonstrate watertight construction by absence of leakaoe through construction ioints fora 72 hour Period after restoration of high groundwater level. 4• Demo,strate equal distribution of fluids to laterals by water tasting. D. Leaching Fields: 1. Remove pavement, vegetation and debris from leaching field area including proposed side slopes, and remove from site. 2. Excavate and stockpile existing clean sand fill and native soil which meets backfill specifications. 4. Excavate and remove from site all peat, debris, and soils with excessive fines from beneath the leaching field to the lateral limits indicated. Removal will included all soils with an excess four percent passing the number 200 sieve. 5. Backfill excavation with clean stockpiled sand and sand borrow. Clean medium sand backfill (<0.2% passing #200 sieve) may be placed in groundwater. Allow sufficient time to re-establish natural groundwater elevation before constructing fields. Fill above the water table shall be placed in lifts not to exceed one foot compacted to eo% maximum dry density. Demonstrate Percolation rate of in-place fill to be less than two minutes Der inch. 6. Construct leaching fields on prepared level surface in accordance with these drawinas. Support distribution laterals to achieve uniform 0.005ft/ft Pitch. Do not subject field to heavy vehicle loading until one (1) foot of cover material is in place. E. Temporary. Construction: 1. Provide. install and remove temporary shoring or bracing as required to protect underground utilities. fo,ndations or structures from damage during construction. 2. Provide and install siltation barriers and/or other measures as required to Prohibit transport of sediment to drainage systems on or adjacent to the site or to Parker's River. F. Site Restoration 1. Provide fill materials. fill and orade construction area to elevations shown on these plans. 2. Provide and install dense 6" oraded stone base on areas de=_ionated for paving or vehicle use. Finish grade to elevations required for subsequent surfacing. c�Ln Ln N O E --H �U71 Ln X- F-- LIJ I- O � m= I� 0< 1n In E Q Z O Cnn Do ICn Q W "t L1J 0 Z O (n W rr ~U U W Li Q W 1 > (Y (.D f%1 Z Q J Q N rn r U M O Q I- EC W U W W O (n O (n O 0 D (n ~ N Vi ., ~ W 0 o J H } J I- f 3 W W Ey U Q (n N WO o O N M X a w0 m V) CY Q a . 3 89-040 SHEET 5 OF 5