Loading...
HomeMy WebLinkAbout83-1230 - Site Plan1F•17 Nv� A! i4AIZOLO C. MAt)V`E- A. SMITi�!� fAILT:D TIVIBM VWLVHE/p cro tr_ .Rrmtwr--D) _17)? of eF1 Vov" R E rm r -VE fljT (V KE MAP 1*> A -A 61 y S-OLAQ D,PAr_14AqD Ad lu A 4 IN F_ NfI4 Wn=) 5TPPS Tv F E! 41Ev- p U c rr-I f f F F�,JLED T-IMJ3 E F_ BE prMovrc) To APPOO !14� 0 1 ilk 'r,�p cF CH 1 4 S70 N F- Ae- E4I`4P' W,)14, ej,' LAyF F -II &d! F_- s �T I L -TF- V, FA5R I Cf- I- LAYISIZ,, Cr 1TMCe4!> -To 0 C lQ1 >71L L f DWELLINrl A) Supply ail material, equipment and labor for removal of existing failed timber bulkhead and construction of a =r rock revetment along the coastal bank as described and shown on plan and details. Perforrance of the work shall be in compliance with.the plan and detail, order of Conditions issued by the Yarmouth Conservation Ca.Tmssicn for the referenced project and as described belay. Access to be from upland of the Omer's property.IUpon completion, all disturbed upland area to be re -graded re -vegetated to match existing contours and conditions. The Contractor shall be responsible to protect all underground utilities, and septic system prior to passage of equipment and vehicles. The Contractor shall have repair perforwd, at his om expense on any underground ;t4 utilities, and septic systems, which may become damaged as a result of the Contractor's efforts, or those of su�ltractor's efforts under his control and/or direction. Any fill material required shall be clean uniformly graded compacted sand or gravel brought onto site by contractor. r-rnre,-, SiAv�0 Ar- rrA4 P I I i 5TAI I It Filter cloth shall be of manufa cture and make as described in the plan, or equal, as approv ed by the Engineer. ` Thfilter cloth shall be placed in two layers on top of the graded slope of the bank, and beneath the toe 4 material. the joints of the filter cloth shall be staggered at least six feet apart. The filter cloth shall be overlapped at least three feet in each direction. Ends of filter cloth shall not butt each other.r VP CF a��Vs Ss F N5. s I fb equip-mt shall pass over, or material placed on any wetlands vegetation. 1451. 0,0' Al i 0 The Contractor shall provide clean fill, as required behiM the apron and the existing Dam, as reTnrea, inF \ , '--� , I t i r-110tArI.D.11AA)�21 order to provide a slope Pram the bank to the top of the revetrent not to exceed 2 to 1. The fill materialj) I S LLCYP) F�;_1-7-4 e1. -H shall not be of displaced beach sand, but a uniformly graded compacted sandy fill. N- g Upon ccmpleticn of the revetreincludin nt, the Contractor shall regrade the beach, c7mr over the base of the revetment, to match the original profile. Existing stair to beach to be replaced with new stairs into or o-mr the new revetmet..- All disturbedupland areas to be regraded & replanted with vegetation indiginous to the environment. P L A t,,.J r J, 0 L7 6B i NO DATE REVISION BY SHEET TITLE SLAOL71: V -z r, .=)IF A PROJECT NO DATE:4 7—ojFc, L) pr "Y' 777 t, DRAWN By CHECKED BY ng inecarintrCo. inc. CIVIL - STRUCTURAL ENVIRONMENTAL - ARCHITECTURAL 260 Cranberry Highway Orleans, MA 02653 (508) 255-6611 DRAWING NO e� 1 OFI—SHTS 6B i