Loading...
HomeMy WebLinkAbout83-1274 - Site Plan�� qw ASSESSORS MAP: 71- �� PARCEL: W-1 LOCUS CURRENT ZONING: R-40 BUILDING SETBACKS: F: 30' S: 6' R: 20' R op FLOOD ZONE: g G k0 Si° 6 LOCATION MAP - \ \ UTILIrr Porn 6. r<Z•� h BINCHMARK AT waTXR cars aLavr 35.4 (NGVD) s� \ LOT AREA 62, 798 ± S. F. sarsrlNo g/ \ (1. 44 -FAC. I BUILDING 1 gq \ / I 30 i// /i /#1010 01 I 6 � g� azrsrlxc �? Gaasr Housa70:t cp 4 ♦ 16 6 _ axrsrrNG X10. s _ \ 2 MROOY BH / / THj! 1tF 6 DWXLLING i / L/P DECK Ar AAr All / 1p- 6'--- - ' 6- - - - AS�� /1100/ - - - - C.0 _ ' / SALT MARSH KEY: EXISTING CONTOUR: - - - PROPOSED CONTOUR: o EXISTING SPOT ELEVATION: 18.6 PROPOSED SPOT ELEVATION: 18.6 TEST HOLE: -$ UTILITY POLE: -6-- FENCE LINE: -x--x x x HYDRANT: -6 DM # 13-152 11 C'0 � Eg ll II- � $ASSR 1 d 1 EXISTING DOCK EXISTING BOATHOUSE TO BE REMOVED AND REPLACED. TEST HOLE LOGS ENGINEER: THOMAS McLELLAN, P.E. WITNESS: DAVE MASON, R.S. DATE: 12-15-93 PERCOLATION RATE: < 2 MIN/INCH TH-1 TH-2 21.0 roP r n v. sUops Y* F1 2f l to. 0 9.0 NO GROUNDWATER ENCOUNTERED SEPTIC SYSTEM DESIGN NOTES: 1. VERTICAL DATUM: NED 2. MUNICAPAL WATER IS AVAILABLE. 3. SCHEDULE 40 - 4" PVC PIPE TO BE USED THROUGHOUT SEPTIC SYSTEM, 4. ALL PRECAST UNITS TO CONFORM WITH AASHTO H-10 & H-20 LOADING SPECIFICATIONS. 5. PIPE PITCH = 114- PER FOOT MIN. 6. FIRST 2' OF PIPE OUT OF D -BOX TO BE LAID LEVEL. 7. THE SEPTIC SYSTEM HAS NOT BEEN DESIGNED TO ACCOMODATE THE USE OF A GARBAGE DISPOSAL. S. ALL CONSTRUCTION DETAILS ARE TO BE IN'CONFORMANCE WITH THE STATE OF MASS. ENVIRONMENTAL CODE (TITLE FIVE) AND LOCAL HEALTH REGULATIONS. 9. CONTRACTOR TO VERIFY LOCATIONS OF ALL UTILITIES PRIOR TO CONSTRUCTION. 10. EXISTING CESSPOOLS TO BE PUMPED AND FILLED WITH SAND OR REMOVED. 11. CONTRACTOR TO VERIFY LOCATION OF EXISTING WATER SERVICE TO BOATHOUSE. PROPOSED SEWER LINE FROM BOATHOUSE TO BE f0' MIN FROM EXISTING WATER SERVICE. FLOW ESTIMATE: ._3_ BEDROOMS AT 110 GAL/DAY/BEDROOM =330 GAL/DAY SEPTIC TANK: 330 GAL/DAY * 1.5 DAYS = 495 GAL USE 1000 GALLON SEPTIC TANK LEACHING AREA: LSE ONE LEACH PI T (6' * 4' ) WI TH 3' OF STONE 112'EFFECTIVE DIAMETER * 4' DEEP) SIDE AREA' 12* PI * 4 = 151 SF (2.5) = 377 GAL/DAY BOTTOM AREA: 6 * 6 * PI = 113 SF (1.0) = 113 GAL/DAY TOTAL CAPACITY = 490 GAL/DAY SEPTIC SYSTEM SECTION 35.6 n FIRST FLOOR ELEV. 11 (DWELLING) 32.9 ELEV. (EXISTING) COVERS TO WITHIN 12" OF GRADE (2) 22.75 ,cavi 1500 GAL ELEV_ ELEV. SEPTIC TANK 11.2' FIRST FLOOR ELEV. TEE SIZES: (BOATHOUSE) INLET: 6" UP, 10" DOWN OUTLET: 6" UP, 19" DOWN 9.1 ELEV. (USE MYERS SRM4PC-1 EJECTOR PUMP INSIDE BOATHOUSE WITH SJ101HL ALARM PACKAGE, POWERED. BY A CIRCUIT SEPARATE FROM THE PUMP POWER. USE 2" PVC PIPE TO SEPTIC TANK.) EQST-McLELLAN ENGINEERING 24 SCHOOL STREET P.O. BOX 463 HEST DENNIS. MASSACHUSETTS 02670 7. \ THOMAS McLELLAN, P.E. JOHN Z. DEMAREST, P.L.S 6.0 ELE 2.0 14% ELEV 29' 2� COASTAL BANK SECTION (SCALE: 1"= 30') 18.0 ELEV (TOP OF COASTAL BANK) 2" PEASTONE OF 3/4" - 1 1/2" WASHED STONE 1;=a 0 0 D -BOX 22,48 4' o 22.65 ELEV. 13.0 ELEV. t� .�-ELEV. 17.0 3 ELEV. 12' > ONE LEACH PIT (6'* 4') WITH 3' OF STONE (12' EFF. DIAM.* 4' DEEP) (H-20) SITE AND SEWAGE PLAN LOCATION: 30 HIGH GROVE ROAD YARMOUTH MA PREPARED FOR - ARTHUR ANTON SCALE: I"= 30' DATE: 12-31-93 REFERENCE: PLAN BOOK 154 / PAGE 29