Loading...
HomeMy WebLinkAbout83-1279 - Site Plan004LOTS J2 AN 4 AND 8 KELP LANE 2' LOT 5 5.60 W KELP LANE 5.5' 8,900 SF f RELOCATE WATER METER PIT AND WATERLINE 10' OFF SEPTIC SYSTEM T 37 6.40 6.44 EDGE 6 ° .... 6.66 VE P MENT _ EXISTING GAS NP OPO�SED SEPTIC SYSTEM ®L 5.06' 5 3' 7.0UTIUTY POLE 6.50 GAS 6.34 j 5 R 7 -7.60 p ' - UY = '-- I., 7.10 I WATER ME L 13.08 '- - s � `5• 100' BUFFER ° I �- 42o7� � REMOVE ALL UNSUITABLE MATERIAL 11' BELOW .THE INVERT ELEVATION FOR TOP AND SUBSOIL MEDIUM SAND - (FILL) ORGANIC LAYER MEDIUM TO -COARSE BROWN SAND 8.0 AREA : EXISTING LOT 6.0 REAR 20' FRONT : 30 2.5 WATER AT ELEV 2.5 NOTES : 1.0 1. BENCH MARK TOP OF WOOD PILE CAP ELEV: 6.57 (NGVD) 2. ALL CONSTRUCTION METHODS AND MATERIALS SHALL CONFORM TO MASS. D.E.P. TITLE 'V do -3.0 THE TOWN OFYARMOUTHBOARD OF HEALTH 3. OWNER ALEXANDER WILL AND CARY WILL 5' AROUND THE SYSTEM. REPLACE 80 BEAUMONT STREET z 8 N o - O s a 2 MIN/INCH BOSTON, MA 02124 WITH CLEAN PERC SAND HAVING A PERC RATE PROPOSED RELOCATED z 8'60 _o' •80 9to RATE OF 2 MIN./INCH. 4. APPLICANT : SAME WATERLINEs.9 INVERT PRIMARY : 7.0 to \ 6\\ 9.6BOTTOM PRIMARY .6.5 S: THE ENTIRE SITE LIES IN FLOOD ZONE A-12 (ELEV-12). - N9.00 9.00 HOUSE? 8.50 6. CONSTRUCTION NOTES: WILUAM BERNSTEIN a 3 \(1 -STORY B INVERT RESERVE . LOT J4 ° WOOD) N BOTTOM RESERVE DAVID MASON, BOH FOUNDATION WALL WILL BE A 4' FROST WALL AFTER 11 KELP LANE PROPOSED ao 9.4 GAS 20 2' �\ \. +-°' ss' NORWOOD ENGINEERING CO. DRYWELL FOR METER G, a�\ 10.2• o TEST PITS OBSERVED BY: FOUNDATION HAS BEEN STRIPPED THE WALLS WILL BE ROOF RUNOFF DATE FEBRUARY 2. T994 ___ BACKFILLED WITHIN 3 DAYS. SOIL WILL BE MULCHED Y\ ELS 9.4 o LORRAINE ALTIERI, TRUSTEE TO PREVENT EROSION UNTIL PERMANENTLY VEGETATED LOT J6, 3 KELP LANE PROPOSED CHTN DESIGN C A LC U LOA TI O N S : NO CHANGE IN EXISTING GRADES IS PROPOSED EXCEPT 2k5' ADDITION 3 3' \ 0.2 \� 210 \ \ WITHIN THE SEPTIC AREA AS SHOWN ON THIS PLAN. N FF: 12.0 9. o ® 70 9.50 3P \ \'S ROOF RUNOFF RESULTING FROM THE ADDITION WILL BE iYp^ \\ e.0' PERC RATE 2 MIN/INCH DIRECTED INTO DRYWELLS. , \a 8.30 12.7' y COSTING 8.50 No. OF BEDROOMS 4 AT 110 GAL/BR/DAY °E 1 DESIGN FLOW REQUIRED 440 Gam. STAKED HAYBALES EXISTING �4 i 1 a 90 Y zCo., 1 n C. 3 LIMIT OF WORK uriN �' w SEPTIC TANK SIZE �OOO GALLONS (NO GRINDER) Norwood Engineering `. N 4 LEACHING PROVIDED : 2. TRENCHES, -2 --5' WIDE. 43' LONG N -� 7so SIDE_ j��]�iSPD 95 State Road 1410 Route One 7.50 7.8 7.30 BOTTOM 2 2.' (43' (1 GSF) = 215 _GPD ss7 s5.o ' S G 3' WIDE Sa amore Beach, Ma. 02562 Norwood, Ma. 02062 -- 6.55 sroNE DUST WALK END : 4(.5')(2.5')(2.5 GSF) = 12.5 GPD 9 0 7.40 6.55 . RAMP 2"X12" WOOD 442.5 1-508-888-0068 1-617-762-0143 6• DOCK PILE CAP (TYP) TOTAL _ GAL/DAY 7.40 306 S.F. Civil Engineers * Land Surveyors * Planners NOTI MHW - 1.8 t NGVD EXISTING STRUCTURE MLW - -1.1t NGVD CH 91 UC. 592 I�GD01Y BREAKOUT :CALCULATION : NOTICE OF INTENT MAX LEACHING ELEV. _PRIMARY RESERVE IN SLOPE AT, ELEV. _PRIMARY YARMOUTH RESERVE PROFILE SCALE : 1" = 4' BREAKOUT SETBACK : _`PRIMARY PREPARED FOR 150 x SLOPE) RESERVE ALEXANDER p ^ p 24" DIA. CONCRETE RISER 18" DIAMETER CONCRETE PRIMARY ALEXANDER AND CAR I WILL TOP OF FOUNDATION 9.3 WITH COVER TO WITHIN 12" MAINTAIN 2 R SLOPE RISER, WITH COVER TO BE ELEV. AT BREAKOUT SETBACK BROUGHT TO W THIN 12" RESERVE GROUND 9.o OF FINISHED GRADE AS REQUIRED. OVER LEACHING PIT OF FINISHED GRADE AS REQUIRED. 9.25 e.s DATE : FEBRUARY 24, 1994 REVISED LOCUS PLAN: PRAWN BY • DAJ CHECKED BY: MDS 7' ® 27 7.9 +- scn 40 pvc 7.76 TEE CONNECTION OUTSIDE TANK min. Ilquld levet 1000 GALLON SEPTIC TANK ZV HEADERS TO BE 6' O .5% n cvri rna �' .....`.-..-... 7.51 TA� O 7.37 ZBO 4' eeh 40 pvc X WITH 5 OUTLETS 6.5 2" LAYER 'OF 1/8" - 1/2" /WASHED STONE 2 TRENCHES 1 1 mot DEPTH 7.D • �. I. .✓ ' 1. p . rMe+rt �' .. i calci tI CIf�d e a R JOB No 0020-96 SCALE: SHEET, 1 OF 1 •.im. ammar� S +.-'nt .-.>•e..m v CIVIL Q- 7sfJ��C�STEe'� �'` iia tpc3ii.�"4.4�° - L LPN6 R jFs�OtfAtft'� 3/2 `f 7/z/ 9�f SOIL REQUIREMENTS LOGS :_ ZONING _PLAN CARL IACCARINo TEST PIT 1 ZONE SCALE 1" = 20' D J3 o SIDE 10' LOTS J2 AN 4 AND 8 KELP LANE 2' LOT 5 5.60 W KELP LANE 5.5' 8,900 SF f RELOCATE WATER METER PIT AND WATERLINE 10' OFF SEPTIC SYSTEM T 37 6.40 6.44 EDGE 6 ° .... 6.66 VE P MENT _ EXISTING GAS NP OPO�SED SEPTIC SYSTEM ®L 5.06' 5 3' 7.0UTIUTY POLE 6.50 GAS 6.34 j 5 R 7 -7.60 p ' - UY = '-- I., 7.10 I WATER ME L 13.08 '- - s � `5• 100' BUFFER ° I �- 42o7� � REMOVE ALL UNSUITABLE MATERIAL 11' BELOW .THE INVERT ELEVATION FOR TOP AND SUBSOIL MEDIUM SAND - (FILL) ORGANIC LAYER MEDIUM TO -COARSE BROWN SAND 8.0 AREA : EXISTING LOT 6.0 REAR 20' FRONT : 30 2.5 WATER AT ELEV 2.5 NOTES : 1.0 1. BENCH MARK TOP OF WOOD PILE CAP ELEV: 6.57 (NGVD) 2. ALL CONSTRUCTION METHODS AND MATERIALS SHALL CONFORM TO MASS. D.E.P. TITLE 'V do -3.0 THE TOWN OFYARMOUTHBOARD OF HEALTH 3. OWNER ALEXANDER WILL AND CARY WILL 5' AROUND THE SYSTEM. REPLACE 80 BEAUMONT STREET z 8 N o - O s a 2 MIN/INCH BOSTON, MA 02124 WITH CLEAN PERC SAND HAVING A PERC RATE PROPOSED RELOCATED z 8'60 _o' •80 9to RATE OF 2 MIN./INCH. 4. APPLICANT : SAME WATERLINEs.9 INVERT PRIMARY : 7.0 to \ 6\\ 9.6BOTTOM PRIMARY .6.5 S: THE ENTIRE SITE LIES IN FLOOD ZONE A-12 (ELEV-12). - N9.00 9.00 HOUSE? 8.50 6. CONSTRUCTION NOTES: WILUAM BERNSTEIN a 3 \(1 -STORY B INVERT RESERVE . LOT J4 ° WOOD) N BOTTOM RESERVE DAVID MASON, BOH FOUNDATION WALL WILL BE A 4' FROST WALL AFTER 11 KELP LANE PROPOSED ao 9.4 GAS 20 2' �\ \. +-°' ss' NORWOOD ENGINEERING CO. DRYWELL FOR METER G, a�\ 10.2• o TEST PITS OBSERVED BY: FOUNDATION HAS BEEN STRIPPED THE WALLS WILL BE ROOF RUNOFF DATE FEBRUARY 2. T994 ___ BACKFILLED WITHIN 3 DAYS. SOIL WILL BE MULCHED Y\ ELS 9.4 o LORRAINE ALTIERI, TRUSTEE TO PREVENT EROSION UNTIL PERMANENTLY VEGETATED LOT J6, 3 KELP LANE PROPOSED CHTN DESIGN C A LC U LOA TI O N S : NO CHANGE IN EXISTING GRADES IS PROPOSED EXCEPT 2k5' ADDITION 3 3' \ 0.2 \� 210 \ \ WITHIN THE SEPTIC AREA AS SHOWN ON THIS PLAN. N FF: 12.0 9. o ® 70 9.50 3P \ \'S ROOF RUNOFF RESULTING FROM THE ADDITION WILL BE iYp^ \\ e.0' PERC RATE 2 MIN/INCH DIRECTED INTO DRYWELLS. , \a 8.30 12.7' y COSTING 8.50 No. OF BEDROOMS 4 AT 110 GAL/BR/DAY °E 1 DESIGN FLOW REQUIRED 440 Gam. STAKED HAYBALES EXISTING �4 i 1 a 90 Y zCo., 1 n C. 3 LIMIT OF WORK uriN �' w SEPTIC TANK SIZE �OOO GALLONS (NO GRINDER) Norwood Engineering `. N 4 LEACHING PROVIDED : 2. TRENCHES, -2 --5' WIDE. 43' LONG N -� 7so SIDE_ j��]�iSPD 95 State Road 1410 Route One 7.50 7.8 7.30 BOTTOM 2 2.' (43' (1 GSF) = 215 _GPD ss7 s5.o ' S G 3' WIDE Sa amore Beach, Ma. 02562 Norwood, Ma. 02062 -- 6.55 sroNE DUST WALK END : 4(.5')(2.5')(2.5 GSF) = 12.5 GPD 9 0 7.40 6.55 . RAMP 2"X12" WOOD 442.5 1-508-888-0068 1-617-762-0143 6• DOCK PILE CAP (TYP) TOTAL _ GAL/DAY 7.40 306 S.F. Civil Engineers * Land Surveyors * Planners NOTI MHW - 1.8 t NGVD EXISTING STRUCTURE MLW - -1.1t NGVD CH 91 UC. 592 I�GD01Y BREAKOUT :CALCULATION : NOTICE OF INTENT MAX LEACHING ELEV. _PRIMARY RESERVE IN SLOPE AT, ELEV. _PRIMARY YARMOUTH RESERVE PROFILE SCALE : 1" = 4' BREAKOUT SETBACK : _`PRIMARY PREPARED FOR 150 x SLOPE) RESERVE ALEXANDER p ^ p 24" DIA. CONCRETE RISER 18" DIAMETER CONCRETE PRIMARY ALEXANDER AND CAR I WILL TOP OF FOUNDATION 9.3 WITH COVER TO WITHIN 12" MAINTAIN 2 R SLOPE RISER, WITH COVER TO BE ELEV. AT BREAKOUT SETBACK BROUGHT TO W THIN 12" RESERVE GROUND 9.o OF FINISHED GRADE AS REQUIRED. OVER LEACHING PIT OF FINISHED GRADE AS REQUIRED. 9.25 e.s DATE : FEBRUARY 24, 1994 REVISED LOCUS PLAN: PRAWN BY • DAJ CHECKED BY: MDS 7' ® 27 7.9 +- scn 40 pvc 7.76 TEE CONNECTION OUTSIDE TANK min. Ilquld levet 1000 GALLON SEPTIC TANK ZV HEADERS TO BE 6' O .5% n cvri rna �' .....`.-..-... 7.51 TA� O 7.37 ZBO 4' eeh 40 pvc X WITH 5 OUTLETS 6.5 2" LAYER 'OF 1/8" - 1/2" /WASHED STONE 2 TRENCHES 1 1 mot DEPTH 7.D • �. I. .✓ ' 1. p . rMe+rt �' .. i calci tI CIf�d e a R JOB No 0020-96 SCALE: SHEET, 1 OF 1 ZN OF AfA S "" --No.951t .` a µo_36569 y - CIVIL Q- 7sfJ��C�STEe'� �'` iia tpc3ii.�"4.4�° - L LPN6 R jFs�OtfAtft'� 3/2 `f 7/z/ 9�f