HomeMy WebLinkAbout83-1377 - Sewage DisposalDEEP OBSERVATION HOLE LOGS
NO SCALE
DEEP OBSERVATION HOLE 1 EL. = 10.45 DATE OF TESTS: 12/13/95
DEPTH FROM
SURFACE
SOIL
HORIZON
SOIL
TEXTURE
SOIL COLOR
(MUNSELL)
SOIL
MOTTLING
OTHER
0" — 10"
Af
100
Vt = 1,172 GPD FOR TWO FIELDS
200
FILL
0" — 10"
A
LOAMY SAND
7.5YR 2.5/1
EXISTIN ONE ( 1 ) — 2500 GAL SEPTIC TANK
10" — 30"
B
LOAMY SAND
10YR 5/4
NONE
MEDIUM TO
COARSE SAN
30" — 101"
C
SAND
10YR 6/3
NONE.
MEDIUM TO
COARSE SA
PERCOLATION RATE ESTIMATED LESS THAN 2 MIN. PER INCH
IN THE C (SAND)STRATUM
WITNESSED BY : JOHN SCHNAIBLE, CEC
AMY VON HONE, R.S., AGENT
GROUNDWATER ENCOUNTERED AS NOTED
a
GROUNDWATER ENCOUNTERED
I AT A DEPTH OF 85", EL. - 3.4
DEEP OBSERVATION HOLE 2 EL. = 10.1
DEPTH FROM
SURFACE
SOIL
HORIZON
SOiL
TEXTURE
SOIL COLOR
(MUNSELL)
SOIL
MOTTLING
OTHER
0" -- 60"
Af
100
Vt = 1,172 GPD FOR TWO FIELDS
200
FILL
60" —"72"
A
LOAMY SAND
10YR 4/2
EXISTIN ONE ( 1 ) — 2500 GAL SEPTIC TANK
72" — 124"
C
SAND
10YR 6/3
NONE
MEDIUM TO
COARSE SAN
DESIGN CALCULATIONS
NQTE HIGH GROUNDWATER OBSERVED AT EL- - 3.4
CONSTRUCTION INSPECTION SCHEDULE
1. ENGINEER SHALL INSPECT WHEN THE REOUIRED EXCAVATION IS COMPLETE.
2. ENGINEER SHALL STAKE FOOTING PRIOR T4 INSTALLATION
3. ENGINEER SHALL INSPECT WHEN CLEAN FILL MEETING REOUIRED GRADATION
HAS BEEN PLACED.
4, ENGINEER SHALL INSPECT WHEN THE COMPONENTS OF THE SYSTEM HAVE
INSTALLED AND THE PUMP MECHANISM HAS BEEN INSTALLED.
CONSTRUCTION NOTES
1. MATERIAL SHALL NOT BE STOCKPILED ON THE NORTH SIDE OF
SOUTH SHORE DRIVE.
2. AREAS DISTURBED BY CONSTRUCTION SHALL BE REVEGETATED
PRIOR TO COMPLETION OF CONSTRUCTION.
PUMP SPECIFICATIONS
1. PUMPS (2) TO BE MYERS WHR5
SUBMERSIBLE SEWAGE PUMPS, 1/2 HP
SINGLE PHASE, 230 VOLTS
PUMP RATE = 75.9 GPM 0 15.9 TDH
2. CONTROLS ARE TO BE FOR A DUPLEX
ALTERNATING PUMP SYSTEM
3. FORCE MAIN TO BE 2' DIA. SCHEDULE 40
PVC PIPE WITH A MINIMUM OF 3' OF COVER.
1 C.F. THRUST BLOCKS ARE TO BE PROVIDED
AT FORCE MAIN ANGLE POINTS.
4. A SEPARATE CIRCUIT HIGH WATER ALARM
SHALL BE INSTALLED WITH THE PUMP CONTROLS.
5. A MYERS RW20S RAIL PUMP LIFT OUT
SYSTEM SHALL BE INSTALLED FOR EACH PUMP
PROPOSED
DISTRIBUTION
PROPOSED
44' L. X 18' W.
LEACHING FIELD
IS THE MAXIMUM OBSERVED FROM MONITOR WELLS ON SITE, AT THEBOX _
EDGE OF THE SEA MOTEL AND AT THE ADJACENT RIVIERA MOTEL- �. ALL PUMP INSTALLATION HARDWARE SHALL $E
.sZ.
GROUNDWATER ENCOUNTERED
AT A DEPTH OF 83", EL. - 3.2
DESIGN FLOW: 9 BEDROOMS AT 110 GAL. PER DAY PER BEDROOM = 990 GPD
1000± S.F. OFFICE AT 75 GPD/1000 S.F. = 75 GPD
SIZE
TOTAL DESIGN FLOW = 1065 GPD
41009
A 44' L, x 18 ' W. LEACHING FIELD CAN LEACH:
50
Vt="'€44( 18)1x.74=586 GPD PER FIELD
100
Vt = 1,172 GPD FOR TWO FIELDS
200
INSTALL: TWO ( 2 ) — 44' L. x 18' W. x 0.5' D. LEACHING FIELDS Vt =
1,172 GPD
ONE ( 1 ) — 2000 GALLON PUMP CHAMBER
3 max.
TWO ( 2 ) -- DISTRIBUTION BOXES ( 9 OUTLET) (H-20)
EXISTIN ONE ( 1 ) — 2500 GAL SEPTIC TANK
10, SEE Tgg�E
BELOW
NOTE: CAPACITY OF EXISTING SEPTIC TANK IS BASED UPON RECORD
INFORMATION. CAPACITY AND ADEQUACY OF TEES SHALL BE VERIFIED
AT TIME
OF CONSTRUCTION.
GALLON
NOTES
1) GARBAGE GRINDERS ARE NOT ALLOWED WITH THIS DESIGN,
2) THE INSTALLER IS RESPONSIBLE FOR ASSURING THAT COMPONENTS OF
W/SANITARY TEES
THE SEWAGE DISPOSAL SYSTEM ARE DESIGNED. WITH SUFFICIENT
.STRENGTH TO SUSTAIN ALL LOADS TO BE IMPOSED ON THEM. ANY
COMPONENT OF THE SYSTEM SUBJECT TO VEHICULAR TRAFFIC MUST
COMPLY WITH A MINIMUM STANDARD OF A.A.S.H,T.O. H-20 WHEEL LOADS.
3) PRIOR TO SETTING ANY SEWAGE DISPOSAL SYSTEM COMPONENT, INSTALLER
FOR
SMALL VERIFY EXISTING CONDITIONS, INCLUDING ELEVATIONS OF EXIT INVERTS,
AND REPORT ANY DISCREPANCIES TO THE DESIGN ENGINEER.
'IPE
4) ALL GRAVITY SEWER PIPE SHALL BE 4" DIA. SCH 40 PVC UNLESS OTHERWISE
NOTED. THE MINIMUM SLOPE OF 4" DIA, SCH 40 PVC SHALL BE 0.01 FT/FT,
LIOUID DEPTH
5) NO PART OF THIS DESIGN SHALL BE ALTERED WITHOUT PR10R APPROVAL
FROM THE DESIGN ENGINEER ,AND THE AGENT OF THE: LOCAL BOARD OF
BELOW FLOW UNE
HEALTH. ALL REQUESTS FOR CHANGES SHALL BE MADE IN WRITING PRIOR
4 FT
TO CONSTRUCTION.
6) THE USE OF ALTERNATE MANUFACTURERS FOR SYSTEM COMPONENTS
19 INCHES
SHALL NOT BE APPROVED IF THE USE OF THEIR EQUIPMENT REQUIRES
6 FT
CHANGES IN DESIGN.
7) THE INSTALLER SHALL ASCERTAIN THE LOCATION OF EXISTING UNDERGROUND UTILITIES PRIOR
29 INCHES
TO EXCAVATION, AND SHALL PROTECT UTILITIES WITHIN THE THE WORK AREA DURING CONSTRUCTION,
8) THE EXISTING EXISTING LEACHING FACILITY TO BE REPLACED SHALL BE REMOVED
WITH SURROUNDING CONTAMINATED SOILS AND BACKFILLED WITH CLEAN
COARSE SAND.
IF APPLICABLE:
VARIANCE
9) FILL MATERIAL FOR SYSTEMS CONSTRUCTED IN FILL SHALL BE CLEAN
X10 CMR: 1
GRANULAR SAND, FREE OF ORGANIC MATTER AND OTHER DELETERIOUS
MATERiAL.S. THE SAND SHALL BE GRADED SUCH THAT NOT MORE THAN
1 RE
45% OF THE SAMPLE, BY WEIGHT, SHALL BE RETAINED ON THE #4 SIEVE.
OF 5'
THE FILL SHALL NOT CONTAIN ANY MATERIAL LARGER THAN 2 INCHES.
THE MATERIAL THAT PASSES THE 44 SIEVE SHALL MEET THE
2 REI
FOLLOWING GRADATION REQUIREMENTS:
SIEVE
PERCENT
SIZE
PASSING
41009
3 MAX.
50
10q-100
100
09-209
200
07-59
I STAINLESS STEEL. 3
o 7. AN ELECTRICAL PERMIT WILL BE REQUIRED FOR PUMP — — — — — — — —
EXISTING AND CONTROL INSTALLATION. 4" 4 SCH. 40 PERF. PIPE LEGEND
MANHOLE — — — — — — — ..- .._., —
—7Y1�icAi
r-- --- ,� EXISTING CONTOUR
R°p r PROPOSEC-"------------- ----'-'- — PROPOSED CONTOUR
VENT N OT E '• 4.
{J) _ - »_ MPOSEDEXISTING SPOT GRADES
L.
EXISTING 44' x IS' W. SYSTEM #I SERVES 9 UNITS -------- ------T
DRAINAGE SYSTEM O r s PROPOSED SPOT GRADE
(DOES NOT DRAIN TO WETLAND) � � V LEACHING HELD •# 1 , 2 & 3 — 36 THRU 41
CF 'f EXISTING
RTE RETAlNNG # 2 SERVES 22 UNITS WATER SUPPLY LINE W
=
WALL,
(FACE OF WALL !S COASTAL BANK) # 3 SERVES 14 UNITS �
# 4 SERVES 18 UNITS
RUN POND x :�',5 .. I Of
LEACHING FIELD D ETAI L
O fly • .r (SCALE: 1" - 10')
,n F ., .! , OTE_
s r T�
` f ' PROPr -SE�-UPGRADE
DRAY r
WILL SERVE "-9-U-N.ITS AND
VALVE ,:l1000±S-F. -OF OFFIC1r i- NOTE:
1 VAULTI `
i 4 ; r' l f'r — 100 YEAR FLOOD EL. 10.0
EDGE OF 1 �WETLAND CEJOF
EXISTING FIRST S12P
'SEPTKTANK'
HELPpm t
,
! r
PROPOSED Qa►, '' r"f r
2800 GALLON VEINY To ROpF' I SE'p
a `;PUMP CHAMBER ,' f Jr �` _-. j `1 C S YS r �..
y ' rPROPOSED
PROPOSED 1 "' r"3 ��`.��� DIST. BOX
`fl• LEACM�II3 FIELD ,; k'' r'(1'YPICAL) ! r
31Ccw4¢R (B.S.
(SEE. DETAIL)
LPIPE' RAIL ', t C
TOP OF WALL \ + _ �- r �,. � r • •`• ,r` - - V
EL . $:0 1 4•� SLEEVE RS3 r T f
j., r� CRAWL SPACE!. x � � 1 SEP
� -
INTO GONG s r� 1 ;. �- 1
FOR PIPE POST , i; C _
FIN GREE SET IN EPDXY 1 i5t
Ll 4012' vEFT (fI It%% 11 3 ` �+ (_
P�OI.Yv htYl 0TH SIDES S 1 —
WRIER 1ff MIN. C - �• , f f 1 I �.,'`. _-"_-
souTH �HORrz NORTH, ---� F, �` f f , I _ _ SEpric Y
FX S7lrG RESO r 5M
IL
�y
MnW ADE ook 2 ' , ' BUILL)WG
fr i CArCCiq
I.. r'
ii TO Rod /_. I r Y�! L
PROPOSED r r .' - -a
ri ��ouPACTED Fru REINFORCED
2■4 KEY 16• CONCRETE WALL vTxm 7
1 POLE I
�3 15 WORM EXISTING ' .�" ,r- ,� - rf, ' Q � -.� pQOt
co
CONCRETE WALL
/4 O 1 f4„ 2'-O` 0 12. O.C.
I 1 LIMIT OF 100 YEAR FLOOD
LOCATION
FLOOD EL - 10 OF EXISTING WATER SERVICE
1
R U I Q ALL n EA1�
(NO SCALA S r ' ✓ j J f /' F~ r ^r �i
DECK
f
A' J r� �/fJ t
PLAN r f f
ONC. SLAB
JIRED(MAXIMUM FEASIBLE COMPLIANCE)
_LOCAL UPGRADE APPRQVAL (SCALE: 1 " = 30')
REQUIRED GROUNDWATER SEPARATION SOIL REMOVAL NOTE
D 4' 7
t.,m "., r• nr nnnnnn rn nnn •nr-nnnr,n„ nvrTr.,r nt•t,itt,r - �x` SYL �
9" MIN.
3 MAX.
L
DROP:7r` mirPLOW UNE
3 max.
10, SEE Tgg�E
BELOW
XfSTfNG
5500
EXISTING
GALLON
SEPTIC TANK
W/SANITARY TEES
INSTALL
GAS BAFFLE
USE `TUF-TITE`
FOR
OR APPPOVED
EOUNALENT
'IPE
LIOUID DEPTH
I OUTLET TEE DEPTH
BELOW FLOW UNE
4 FT
14 INCHES
5 FT
19 INCHES
6 FT
24 INCHES
7 FT
29 INCHES
I STAINLESS STEEL. 3
o 7. AN ELECTRICAL PERMIT WILL BE REQUIRED FOR PUMP — — — — — — — —
EXISTING AND CONTROL INSTALLATION. 4" 4 SCH. 40 PERF. PIPE LEGEND
MANHOLE — — — — — — — ..- .._., —
—7Y1�icAi
r-- --- ,� EXISTING CONTOUR
R°p r PROPOSEC-"------------- ----'-'- — PROPOSED CONTOUR
VENT N OT E '• 4.
{J) _ - »_ MPOSEDEXISTING SPOT GRADES
L.
EXISTING 44' x IS' W. SYSTEM #I SERVES 9 UNITS -------- ------T
DRAINAGE SYSTEM O r s PROPOSED SPOT GRADE
(DOES NOT DRAIN TO WETLAND) � � V LEACHING HELD •# 1 , 2 & 3 — 36 THRU 41
CF 'f EXISTING
RTE RETAlNNG # 2 SERVES 22 UNITS WATER SUPPLY LINE W
=
WALL,
(FACE OF WALL !S COASTAL BANK) # 3 SERVES 14 UNITS �
# 4 SERVES 18 UNITS
RUN POND x :�',5 .. I Of
LEACHING FIELD D ETAI L
O fly • .r (SCALE: 1" - 10')
,n F ., .! , OTE_
s r T�
` f ' PROPr -SE�-UPGRADE
DRAY r
WILL SERVE "-9-U-N.ITS AND
VALVE ,:l1000±S-F. -OF OFFIC1r i- NOTE:
1 VAULTI `
i 4 ; r' l f'r — 100 YEAR FLOOD EL. 10.0
EDGE OF 1 �WETLAND CEJOF
EXISTING FIRST S12P
'SEPTKTANK'
HELPpm t
,
! r
PROPOSED Qa►, '' r"f r
2800 GALLON VEINY To ROpF' I SE'p
a `;PUMP CHAMBER ,' f Jr �` _-. j `1 C S YS r �..
y ' rPROPOSED
PROPOSED 1 "' r"3 ��`.��� DIST. BOX
`fl• LEACM�II3 FIELD ,; k'' r'(1'YPICAL) ! r
31Ccw4¢R (B.S.
(SEE. DETAIL)
LPIPE' RAIL ', t C
TOP OF WALL \ + _ �- r �,. � r • •`• ,r` - - V
EL . $:0 1 4•� SLEEVE RS3 r T f
j., r� CRAWL SPACE!. x � � 1 SEP
� -
INTO GONG s r� 1 ;. �- 1
FOR PIPE POST , i; C _
FIN GREE SET IN EPDXY 1 i5t
Ll 4012' vEFT (fI It%% 11 3 ` �+ (_
P�OI.Yv htYl 0TH SIDES S 1 —
WRIER 1ff MIN. C - �• , f f 1 I �.,'`. _-"_-
souTH �HORrz NORTH, ---� F, �` f f , I _ _ SEpric Y
FX S7lrG RESO r 5M
IL
�y
MnW ADE ook 2 ' , ' BUILL)WG
fr i CArCCiq
I.. r'
ii TO Rod /_. I r Y�! L
PROPOSED r r .' - -a
ri ��ouPACTED Fru REINFORCED
2■4 KEY 16• CONCRETE WALL vTxm 7
1 POLE I
�3 15 WORM EXISTING ' .�" ,r- ,� - rf, ' Q � -.� pQOt
co
CONCRETE WALL
/4 O 1 f4„ 2'-O` 0 12. O.C.
I 1 LIMIT OF 100 YEAR FLOOD
LOCATION
FLOOD EL - 10 OF EXISTING WATER SERVICE
1
R U I Q ALL n EA1�
(NO SCALA S r ' ✓ j J f /' F~ r ^r �i
DECK
f
A' J r� �/fJ t
PLAN r f f
ONC. SLAB
JIRED(MAXIMUM FEASIBLE COMPLIANCE)
_LOCAL UPGRADE APPRQVAL (SCALE: 1 " = 30')
REQUIRED GROUNDWATER SEPARATION SOIL REMOVAL NOTE
D 4' 7
t.,m "., r• nr nnnnnn rn nnn •nr-nnnr,n„ nvrTr.,r nt•t,itt,r - �x` SYL �