Loading...
HomeMy WebLinkAbout83-1414 - Site Plan - Sheet2F. PLAN PAVEMENT DIMENSIONS, DRAINAGE & GRADING FLARED END SECTION (FES1) i i 12" HDPE FROM CB8 MANHOLE 1 SEE DETAIL SHEET 3 I 18'0 SMOOTH BORE _ HDPE PIPE •+ 12' HDPE FROM LT9 00 FRAME I F. PLAN PAVEMENT DIMENSIONS, DRAINAGE & GRADING FLARED END SECTION (FES1) i i 12" HDPE FROM CB8 MANHOLE 1 SEE DETAIL SHEET 3 I 18'0 SMOOTH BORE _ HDPE PIPE •+ 12' HDPE FROM LT9 00 FRAME DATE: MAY 7, 1997 EXCAVATOR: BORTOLOTTI OUTLET B.O.H. AGENT: NA u SOIL TEST DATA FRAME DATE: MAY 7, 1997 EXCAVATOR: BORTOLOTTI OUTLET B.O.H. AGENT: NA NO ENGINEER: DOWN CAPE ENGINEERING, INC. I I LOCATION: TP2 9' WIDE GATE LOCATION: TP1 ELEV. DEPTH INV. ELEV.. DEPTH 27.4 0.0 I 26.7 0.7 ORG. LOAM 26.3 0.0 26.1 1.3 Y SAND 25.5 0.8 ORG. LOAM LOAMY SAND LOAMY SAND AND GRAVEL 24.0 2.3 TR. FINE GRAVEL 24.2 3.2 5 COARSE SAND '& GRAVEL COARSE SAND 23.0 3.3 19 17 COARSE SAND 17.85 TR. GRAVEL 15.85 21.3 5.0 PERC 2 MIN./IN z 0-16 20.7 6.7 PERC 2 MIN./IN 17.4 10.0 LT3 17.05 BOTTOM 2:1 SLOPE J, NO GROUNDWATER 14.3 12.0 CB4 BOTTOM 14 NO GROUNDWATER 16.85 LOCATION: TPS I z 0 ELEV. DEPTH ORG. LOAM LOCATION: TP44 16.9 0.0 LOAMY SAND ELEV. DEPTH 20.6 16.7 I Qt I 41 * 16.2 0.7 16.1 0.0 A COARSE SAND BURRIED DEBRIS 5% GRAVEL PEASTONE 14.1 2.0 15.85 LT6 MED. SAND 12.9 4.0 TR. GRAVEL MED -COARSE SAND 98 10.0 6.1 EST. HIGH GW 9.3 7.6 EST. HIGH GW 9.1 7.0 OBS. GW 8.4 8.5 OBS. GW BOTTOM 7.6 8.5 Cb USGS HIGH GROUNDWATER EST, BOTTOM INDICATOR WELL• MIW-29 USGS HIGH GROUNDWATER EST, ZONE: C INDICATOR WELL- DATE: 4/97 MIW-29 ZONE: ADJ. FACTOR: C .9 DATE: 4/97 NOTE., HOLE CAVED IN BEFORE ADJ. FACTOR: .9 GOOD GROUNDWATER MEASUREMENT J COULD BE MADE. 14.30 NOTE, 1. ORG. LOAM (TOPSOIL) MAY BE STRIPPED, STOCKPILED AND RE -USED AS PLANTING SOIL FOR LAWNS PROVIDED IT IS PROCESSED TO MEET THE REQUIREMENTS OF THE SPECIFICATIONS. c� 2. LOAMY SAND OR LOAMY SAND AND GRAVEL (SUBSOIL) SHALL BE REMOVED FROM TO 3 FT BELOW PAVEMENT AND BELOW AND 10' LATERALLY FROM DRAINAGE STRUCTURES TO ITS MAXIMUM DEPTH. LOAMY SAND AND GRAVEL MAY BE USED FOR FILL OUTSIDE OF THE PAVEMENT AREA. - 3. MEDIUM SAND MAY BE USED AS FILL IN ALL AREAS. 11 4. ALL EXCESS SOIL MATERIALS SHALL BE REMOVED FROM SITE. SCHEDULE OF ELEVATIONS FRAME OUTLET INLET OUTLET ���(`(�p� � ``��JJ NO TRENCH I I ELEV 9' WIDE GATE STCT. INV. O I CHAMBERS LENGHT 2:1 SLOPE 22.9 18.65 LTl 18.45 16.45 5 40 I 22,3 19 17 12' 17.85 15.85 7 z 0-16 CB3 21.5 17.25 LT3 17.05 W15 2:1 SLOPE J, 10 77 CB4 21.3 14 LT4 16.85 I z 0 10 13 o� BOTTOM LEVEL 20.6 O �_ I Qt I 41 * N A AT ELEV 13.0 11 84 I "' 00 20.1 15.85 LT6 15.65 2:1 SLOPE 13.65 13 98 CB7 19.8 .15,55 LT7 15.35 Cb Cb 77 CBS 19.2 14.95 LT8 14.75 14.75 12.75 9 69 CB9 18.5 14.50 J 14.30 14.30 2:1 SLOPE O 98 c� 1918 mem. 0 15.35 w 11 SLOPE 5:1 MAX MH1 14.55 TO EXISTING GRADE 2:1 SLOPE 18.00 14.1 FROM LT9 O I FES1 13.35 13.00 OVERFLOW E 15,75 L ---------Q-------------- I 24'--- 6' HIGH CHAIN LINK FENCE SCHEDULE OF ELEVATIONS LO WOD I�,',' c) m cli CN MM i�1i V Coco �� V J Q y., V .0 0 STORMWATER MANAGEMENT COMPLIANCE DATA: -� STANDARD #i: No discharge of stormwater to wetlands The destination of runoff from the portion of this site to be affected by construction is vegetated wetland bordering on drainage ditches and cranberry bog drainage systems, and ultimately. Lewis Bay - . Treatment of stormwater runoff from impervious areas prior to discharge is required. STANDARD 42: Post Development peak runoff rates must not exceed pre -development runoff. rates. Town of Yarmouth Regulations require recharge of lOo% of stormwater runoff generated on site during a 25yr storm. Therefor, the peak rate of runoff will remain approximately the same as pre -development conditions for storms with a return frequency of 25yr or less. The 100yr storm will likely be accompanied by coastal flooding to the margins of the proposed parking area. STANDARD #3: Loss of annual recharge The proposed drainage system will infiltrate all runoff from storms with a return frequency of 25yr or less. The recharge capacity of the drainage system is therefor greater than required of meet this standard. STANDARD 04: TSS removal This project will incorporate water quality inlets at each of the ten infiltration units to be Placed under the pavement of the proposed Parking area. Each infiltration unit consisting of a stone trench 6.8' wide and three foot deep is considered equivalent to an infiltration basin yielding an 80% TSS removal.... Pretreatment in a water quality inlet is considered to provide 25% removal of .TSS. EFFECTIVE TSS REMOVAL: 85% STANDARD #9 Operation and Maintenance Plan Maintenance of this drainage system will be annual inspection of each catch basin,.and periodic removal of accumulated sediments when the level of accumulation is within two feet of the outlet trap. In addition, the overflow basin (FES1) will be annually inspected . and sediments removed as required. Drainage inlets''wiil be kept free of leaves and debris which would decrease inlet capacity. .: The parking lot will be swept free of sand and debris annually after the last snowfall. Y= � � •AAdA , � f t j. O 0 v1 0 1 O W D_ LIJ0 o H = H p o ¢ o z 03LL mzw` >_ Q _J = w U 0 CD J K Q w I L) vi z N a N .J o V) < �_ U O UV) w Z O w V) Q X Q y CL Q O W O t;" QEL V)U j O_ N w d W Er U w X 0_ 7 0_ ur . O Qw U 5 '- m U 96-161 SHEET 2 OF 4 ETAIL - FL NOTES: SECTION A - A 1. STONE FOR THIS STRUCTURE SHALL BE DURABLE BROKEN ROCK WITH A SIX INCH MIN. DIMENSION. EACH STONE SHALL WEIGH NOT LESS THAN 15 POUNDS NOR MORE THAN 75 POUNDS. AT LEAST 75% OF THE VOLUME SHALL CONSIST OF STONES WEIGHING NOT LESS THAN 50 POUNDS EACH. ARED END SECTION (FES1) 1/4" = 1'- 0" FRAME OUTLET INLET OUTLET BOT NO TRENCH STRUCTURE" ELEV INV. STCT. INV. INV. TRENCH CHAMBERS LENGHT CB1 22.9 18.65 LTl 18.45 16.45 5 40 CB2 22,3 18.05 LT2 17.85 15.85 7 55 CB3 21.5 17.25 LT3 17.05 15.05 10 77 CB4 21.3 17.05 LT4 16.85 14.85 10 77 CB5 20.6 16.35 LTS 16.15 14.15 11 84 C116 20.1 15.85 LT6 15.65 13.65 13 98 CB7 19.8 .15,55 LT7 15.35 13.35 10 77 CBS 19.2 14.95 LT8 14.75 14.75 12.75 9 69 CB9 18.5 14.50 LT9 14.30 14.30 12.30_ 13 98 CB10 1918 15.55 LT10 15.35 13.35 11 84 MH1 14.55 FROM LTB FRAME & COVER 18.00 14.1 FROM LT9 FES1 13.35 13.00 OVERFLOW E 15,75 LO WOD I�,',' c) m cli CN MM i�1i V Coco �� V J Q y., V .0 0 STORMWATER MANAGEMENT COMPLIANCE DATA: -� STANDARD #i: No discharge of stormwater to wetlands The destination of runoff from the portion of this site to be affected by construction is vegetated wetland bordering on drainage ditches and cranberry bog drainage systems, and ultimately. Lewis Bay - . Treatment of stormwater runoff from impervious areas prior to discharge is required. STANDARD 42: Post Development peak runoff rates must not exceed pre -development runoff. rates. Town of Yarmouth Regulations require recharge of lOo% of stormwater runoff generated on site during a 25yr storm. Therefor, the peak rate of runoff will remain approximately the same as pre -development conditions for storms with a return frequency of 25yr or less. The 100yr storm will likely be accompanied by coastal flooding to the margins of the proposed parking area. STANDARD #3: Loss of annual recharge The proposed drainage system will infiltrate all runoff from storms with a return frequency of 25yr or less. The recharge capacity of the drainage system is therefor greater than required of meet this standard. STANDARD 04: TSS removal This project will incorporate water quality inlets at each of the ten infiltration units to be Placed under the pavement of the proposed Parking area. Each infiltration unit consisting of a stone trench 6.8' wide and three foot deep is considered equivalent to an infiltration basin yielding an 80% TSS removal.... Pretreatment in a water quality inlet is considered to provide 25% removal of .TSS. EFFECTIVE TSS REMOVAL: 85% STANDARD #9 Operation and Maintenance Plan Maintenance of this drainage system will be annual inspection of each catch basin,.and periodic removal of accumulated sediments when the level of accumulation is within two feet of the outlet trap. In addition, the overflow basin (FES1) will be annually inspected . and sediments removed as required. Drainage inlets''wiil be kept free of leaves and debris which would decrease inlet capacity. .: The parking lot will be swept free of sand and debris annually after the last snowfall. Y= � � •AAdA , � f t j. O 0 v1 0 1 O W D_ LIJ0 o H = H p o ¢ o z 03LL mzw` >_ Q _J = w U 0 CD J K Q w I L) vi z N a N .J o V) < �_ U O UV) w Z O w V) Q X Q y CL Q O W O t;" QEL V)U j O_ N w d W Er U w X 0_ 7 0_ ur . O Qw U 5 '- m U 96-161 SHEET 2 OF 4 ETAIL - FL NOTES: SECTION A - A 1. STONE FOR THIS STRUCTURE SHALL BE DURABLE BROKEN ROCK WITH A SIX INCH MIN. DIMENSION. EACH STONE SHALL WEIGH NOT LESS THAN 15 POUNDS NOR MORE THAN 75 POUNDS. AT LEAST 75% OF THE VOLUME SHALL CONSIST OF STONES WEIGHING NOT LESS THAN 50 POUNDS EACH. ARED END SECTION (FES1) 1/4" = 1'- 0"