HomeMy WebLinkAbout83-1424 - Site & SewageiI
CCNrKrE SEPTIC TAW-'
SEE NOTE A. I -
19 114' MN 1'
A I�
4 511 GAL I 17`0 GAL
Y.YESS TO NSKF,T NMA
CUTS NYKT !E TO V.2E6 -\ -
trcrt,. ePnc ra caA¢r
MST
VA". TIE.
!NT NJSL BE WATERi1fA,i.
I y
Fr -
WASTE MET
(NIN Y ABC'
EUtul,
(f\ AIA IU -E
i
o
SPECIFICATI(YAS FOP
SINGLE HOME FAST RASTEWATER
TREATMENT SYSTEM
GENERAL
THE CONTRACTOR SHALL FURNISH
A140 INSTALL (1) SING-£ HOME
FAST TREATMENT SYSTEM AS
MANUFACTURED SY
BIO-MICROBICS, INC THE
TREATMENT SYSTEM SHALL BE
COMPLETE PATH ALL NEEDED
EOIJTPMENT AS SHOWN ON THE
DRAWINGS AND SPECIFIED
HEREIN
ME PRINCIPAL ITEMS OF
EOUIPMENT. SHALL INCLUDE FAST
SYSTEM INSERT. BLOWER
ASSEMBLY, CONTROLS. ALARMS,
VENTILATION SYSTEM AND ALL
OTHER APPURTENANCES REQUIRED
FOR PROPER INSTALLATION AND
OPERATION, THE SINGLE HOME
FAST UNIT SHALL BE SITUATED
WITHIN A -1,250 GALLON
(MINIMUM) TANK, AS SHOWN ON
THE PLANS- .THE CONTRACTOR ,
SHALL PROVIDE COORDINATION
BETWEEN THE FAST SYSTEM MID
TANK SUPPLIER WITH REGARD TO
FADRICATION OF THE TANK.
INSTALLATION OF THE FAST
UNIT AND DELIVERY TO JOB
SITE..
EQUIPMENT SHAL. BE FURNISHED
TO THE PROJECT SITE FACTORY
TESTED AND ASSEMBLED.
SEPARATE SUBASSEMBLIES
SUBJECT TO DAMAGE IN
SHIPMENT OR HANDLNG SHALL
BE PACKAGED OR CRATED FOR
ON-SITE CONTRACTOR
NSTALLATICEI.
2. OPERATING CONDITIONS
1HE SINGLE HOME FAST
TREATMENT SYSTEM SHALL BE
CAPABLE OF TREATNG THE
WASTEWATER PRODUCED BY
TYPICAL FAMILY ACTIVITIES
(BATH, LAUNCRY, KITCHEN, ETC)
RANGING FROM (1) ONE TO (12)
TWELVF PERSONS.
3. MEDIA
THE FAST MEDIA SHALL DE
MANUFACTURED OF RIGID PVC OR
POLYETHYLENE AND IT SHALL BE
SUPPORTED BY THE
'POLYETHYLENE INSERT. THE.
MEDIA SHALL BE OF SUCH A
DESIGN THAT BACTERIAL GROWTH
IS UNIFORM OVER ALL MEDIA '
SURFACES. THE MEDIA SHALL
BE FIXED IN POSITION AND
CONTAIN NO MOVING OR *FARING
PARTS AND SHALL NOT COP.ROOE.
THE MEDIA SHALL BE DESIGNED
AND INSTALLED TO ENSURE THAT
SLOUGHED SOLIDS IMMEDIATELY
DESCEND THROUGH MF MEDIA TO
THE BOTTOM OF THE SEPTI^.
TANK.
A: YS: PST 91M'CRI EIICI
SEE NOTE 1
1 6' etn
)� II
MF
r—� 141 NIN
I'
I iiW' I
! I I f
W A -A
4 BLOWER
THE SINGLE HOME FAST
UNIT SHALL COME
EQUIPPED WITH A.
PEGENERATIvE TWE
BLOWER CAPABLE OF
DELIVERING 22 CFM.
THE BLOWER ASSEMBLY
SHALL INCL' TIDE A4
INLET FILTER WITH
REPLACEABLE FILTER
ELEMENT.
3 REMOTE MOUNTED
BLOW'YEP
THE BLOWFR SHALL BE
NOJNTED REMOTE, UP
TO 100MAYIMUM.
FPOM THE SINGLE HOME
FA- 'j NIT ON A
CCWi -FACTOR SUPPLIED
C01,7 -_TE BASE.THE
BLOWER ELEVATION
MUS.' BE EQUAL TO Of?
H;'.:HEP. THAN THE
WA -ES LEVEL WMMIN
THE TPEATMENT
S Y, "Em A ONE-PIECE
RECTANGULAR HOUSING
SHALL BE PROVIDED
W'. TAMPEPPROOF
S-PEWE THE
E.. SC}IAPC:F AIR LINE
FP,^nA THE BLOWER TO
TNF SNGLE HOME FAST
SHALL BE PRONGED
AND INSTALLED BY THE
CONTRACTOR.
E. ELECTRICAL
THE TREATMENT
SYSTEM SHALL BE
DESIGNED TO OPERA-_
04 STANDARD
HOJSEHCLD CJxENT
THE INPUT PC+e7-
REQUIRED IS ItErLt. TC.
SINGLE PHASE, H'
HERTZ. 20AM�5 A_
CONDUIT AND W'R^,
BETWEEN THE
ELECM.'AL CCNTlpn-
PANEL AND THE P7 eA'c
S'JPPIr A',- FCTA*.EN
THC PANEL A'+J
�r
BLOWER S4ALL PE
FURNISHED AN
INSTALLED B, THE
CONTRACTOR
7. ALARMS
THE ALARM SrSc"
SHALL CONSST CF A
VISUAL AND AJ^B-E
ALARM TO If@I:A—E
FAILURE OF THE
BLOWER. T'HE ALA' -'M
SHALL BE LOCATED A3
SHOWN CNI M- PL -4S
A MANUAL S. FN_E
SWATCH IS INC LODEC
I
I
�In[i E NR na
2 52B• NN S� 21 AND 6' CLEAN31TS
l`t VSE SPECIALf F HMVK.
A9 Vv ArA A 12' OIA, HICS
WFFNY
UL L - 6 MU IN P- PIK.
LE vfa3 2 6 6 ALLYLS O, 2' PIK.
16 eTi ES IN 6• PINE.
' SCC NOTE A -
I � ! AIIK_R NM KC11 -
!r B C N.Cp.e,CSI \
IA SEF !F"E ,
�. 41� r ��
ATTAJ N:C:t
�tv:vn -1ii�
Y AN AIP VENT 7
SLE AC'C 2
1
}
—2' S _E PORT I Y M,r AN PTIW,,
% WArGR U1TLEi I
�la l`Ir
1
r;FTALLATION AND
ATATNG INSTP'JCTIONS
!`-+!_LATICN OF THE
TGE HOME FAST SNA;;
17 ERjNE IN ACCORCANCE
1^' THE WRITTEN
1`Ir� C.TIONS PROVIDED
B ME MANUFACTURER.
Orr AT'Oi MANUALS SHALL
B
Vo-i"ED WHICH WILL
It -,C_£ A EESCRIPTICsH OF
iAE=A-T AND SYSTEM
U. EEP PR'W'fDURES.
T..'v '+-4L BE A
E NAN'JAL FOR THE
II5"AuAT10N, SERVICE
A_ •_WIER, TAILORED TO
EC..
TE DS�IBUTOR SHALL
PC ` THE SERVICES OF
ATT.'T�RY TRAINED
PE"tENTATIVE FOR A
MAYVJM PERIOD OF ONE
CA" CN -SIRE TO PERFOPM
III' A; START UP OP T -IE
FAT- SYSTEM AND TO
RIFE_T THE OPERAT71
AC:- :I STALLATION OF
Ed `VENT.
Id AARRANTY
TE MANUfACTUPER CY '+•E
S41E HOME FAST
TEATMENT SYSTEM SHa_.
WH"ANT FOR THREE
YOBS. FROM THE DAT' CF
SG, -ENT OR TWO YEA=S
RPA THE DATE OF
51,--,P, SIA-IICHE+F_R
OCP'S FIRST, THAT T..E
Ed'°'`,ENT THEY PPI.`
WL E` FREE FROM
DFE'T5 N MATERIA_ A'.^
WP MANSHIP.
IT,!` EVENT A
C41- 04T FAILS Tv
PP°?M AS SPECIF,,- _F
IS> __.EN DEFECTIVE Y,
SB+:-; DURING M1
Wt- -'.TY PERIOD, T>•E
M#.---CTURER SHALL
PCA OR REPLACE S':,
GEF W PARTS TQC
PFIA'EM.NT OP, PFPA>
OFT 3E ITEMS Nnoy L_I Y
CCE.. ^F0 IN SERVICE
SUM AS AIR FILTER., E'^_,
SHE, BE CGNSIDEPEC AS
PAT OF ROUTINE
MAT_4ANCE AND UPaa_P
IT " N.7 IN7t4DEC THAT
THE MAN1,I4CTLTFEF
FO- CON TRIrc:1T
LI IF LIT;E< .w
Ch; �[hJEF: TIq DANAGES
CF ANY NATV�E
FE' 'LT' , FPiM CC ECTS
IN CF`KV, MA`AL CP
OP CELAY'
IN LELWF_P r,
REF LA CEMG4 T, OR,
OTHEPw,SE.
CENfC1 PANEL
„E.
I KE,`C N1,:. X NTHN IN FEET OP FA:o
1 f f5 !!St KfS FP of ER iMW :Oi
"IT - CR ILLT F,YT"r. Kof YT
MST K LOC.IEA AXA VAX UAL
A. P f :% U T.
2 PA, VENT `rC p[ -.-D LOCAIM Ae,
CC 'EF Urv:ti WIT. INSECT SCWFn
M.E LCR; NAi Ir Kiv4T--KE NAww
3 OCESS PIPE CJVEP MDr ALLOW WIN
INE 1AFa-E P I ANC VFf
M PAS Ate FAILa r TCM WEN* PETE.
LID MIST NAVE A PAkOCX EP PEMPE
SPEE.K m FT ""k,
V' -4i 1CC� FBF A $V4^PTC VSNI PR.
CAP PIK: J•'N 6' An; Y Prf ttl+r6-• ':
W-.1 IHEI [S N 2' G!"C W916le, Ei
Iw 6• APE A? UP" T{ P.0 CAP[
F N PE CAP,
A ALL . ITENN'•iS T'J S!•' rpf FAIA
leg S TIC TANA NW OUTS, ETC,
CO"
TY r ALL �TPT, V.1F
ro"i?CL AAC L'Sh CCYS
Z. 1 is
-�-' SINGLE HOME FAS'
f ti SPECIFICATIDTtS
n EA
f ..e SN�ASTSRECS -.T
i. .i :A iwaoca