Loading...
HomeMy WebLinkAbout83-1444 - Site Plan002T.O.F. AT EL. 57.5 54.90' _ BOTTOM 54.58' FOOTINGS EL. 49.0' - - ACCESS COVER TO WITHIN 6" OF FIN. GRADE ' 56X1 MINIMUM .75' OF COVER OVER PRECAST PROPOSED 1500 GALLON SEPTIC 54.33' TANK (H- 10 ) GAS �6" CRUSHED STONE OR MECHANICAL DEPTH OF FLOW = 4 COMPACTION. (15.221 [2]) . TEE SIZES: INLET DEPTH = 10" OUTLET DEPTH = 19" FOUNDATION- 16' AT 2% - SEPTIC TANK JABEZ NEDS POND/ 0" 4" 9„ 18" 30" 50" 120" -391 OFF Sq AB. oy oHOUSE / �c .GEo�GE" vRAc� J TEST HOLE LOGS ENGINEER: SWEETSER WITNESS: P. BRYANTON DATE: 2/6/97 PERC. RATE _ <2 MIN./INCH CLASS 1 SOILS TH1 TH2 53.67 O" 0 ORGANIC 2„ 0 ORGANIC E MED. SAND E MED. SAND t0YR5/1 7' 10YR5/i A q L.S. 7.5YR3/3 12^ L.S.7.5YR3/3 96" 102" ACCESS COVER (WATERTIGHT) TO WITHIN 6" OF FIN. GRADE NOTE: FILL REQUIRED \ TO COVER PIPE / u VARIES 0. CROSS SECTION NOT TO SCALE ;O• ' °o°o o°o°o°°°oo ° 4'SCH40 PVC _�-TITLE 5 ORIFICES 2' 5' 2' I - 0.75, 100xO EXISTING SPOT ELEVATION so PROPOSED CONTOUR 2" DOUBLE WASHED PEASTONE 75" - 1.5" DOUBLE WASHED STONE _ BOTTOM LEVEL AT EL. 51.80' 2% SLOPE REQUIRED OVER SYSTEM PIPE LEVEL FIRST 2' 2" DOUBLE WASHED PEASTONE OVER CROWN 55.8 REGRADING REQ, FOR 3' MAX. 52.8 ------ ---------------------- 52.59' 0.75' ------ 52.76' 0.50' 4"OPERF.SCH40 PVC AT 0.005 FT FT 2 REQ.) INV. 52.30' INV. 52.55' / BOTTOM OF FIELD LEVEL AT EL. 51.8' .75" - 1.5" DOUBLE WASHED STONE TO CROWN PIPE 157' AT 1% D' BOX 4' AT 1% LEACHING FACILITY 6`rN0 M SwDy J.BEZ POND i N La '3 ROUTE 28 e LOCUS MAP 1"=2000' ASSESSORS MAP 33 PCL A4 PLAN REF.9-13-85 DCE PLAN DB 1441 PG 526 ZONING DISTRICT R-25 5.03' MIN LOT SIZE 25,000 BUILDING SETBACKS:* SEPTIC PROFILE FRONT: 30' SIDE: 15' (NOT TO SCALE) MIN. FRONTAGE 0' RON150' 5� FLOODZONE: C "B 46.77 (ZONE B AT EDGE POND) HSE ADJUSTED GROUNDWATER • MAY BE LESS AS L07 MAY /56 PRE -DATE ZONING CHANGES / SEPTIC DESIGN: (GARBAGE DISPOSER IS NOT ALLOWED) I/1.89"1 95 (3) BEDROOM RESIDENCE AT 110 GPD/BDRM = 330 GPD. NOTES. /' 1. VERTICAL DATUM IS ASSUMED. 26 h" 11 1 SEPTIC TANK: 2. MUNICIPAL WATER IS AVAILABLE. 1,1 1 330 GPD (2) :660 (1500 MIN.) I '�' 93 1 USE A 1500 GALLON SEPTIC TANK 3. MINIMUM PIPE PITCH TO BE 1/8" PER FOOT. RY"ELL �� 1 mss LEACHING: 4. DESIGN LOADING FOR ALL PRECAST UNITS TO BE AASHO H-10. t� /5T 11 5. PIPE JOINTS TO BE MADE WATERTIGHT. ss oF� 6. CONSTRUCTION DETAILS TO BE IN ACCORDANCE WITH MASS. W PPROX. PROP. WAT \H .°� 50' x 9' = 450 SF_ ENVIRONMENTAL CODE TITLE V. ,5o NNE 1 s BOTTOM: 7. THIS PLAN IS FOR PROPOSED WORK ONLY AND NOT TO BE a9 1 1 TOTAL: 450 S.F (.74 GPD/SF) =333 GPD USED FOR LOT LINE STAKING. 4jDRI 1 `ohl USE 50' x 9' LEACHING FIELD 8. PIPE FOR SEPTIC SYSTEM TO SCH. 40-4" PVC. 11 9• COMPONENTS NOT TO BE BACKFILLED OR CONCEALED WITHOUT WITH (2) DISTRIBUTION LINES SPACED \ INSPECTION BY BOARD OF HEALTH AND PERMISSION OBTAINED 6 \ \�1 �, 5' APART. FROM BOARD OF HEALTH. GROUNDWATER ADJUSTMENT: ZONE B 4817 MIW29 2/97 LEVEL = 7.3' ADJ. = 1.6' NOTE: GROUNDWATER OBSERVED BY DCE ADJUSTS TO SAME ELEVATION. 46.77 pADJ. WATER EL. }1.6' C7 1 45.17 OBSV. WATER EL. HIGH POINT Tj LEGEND 48.5 PROPOSED SPOT ELEVATION 100xO EXISTING SPOT ELEVATION so PROPOSED CONTOUR EXISTING CONTOUR UTILITY POLE TH1 0 TEST HOLE HOARD OF HEALTH APPROVED DATE .YARMOUTH, MA off 508-362-4541 fo< 508 362-9880 down cape engineering, inc. CIVIL ENGINEERS LAND SURVEYORS 939 main St. yarmouth, ma 02675 10. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION OF ALL UNDERGROUND & OVERHEAD UTILITIES PRIOR TO COMMENCEMENT OF WORK. 11. TOP OF FOUNDATION IS 1.0' BELOW HIGHPOINT IN ROAD, VARIANCE OF 3.0' IS REQUESTED. 12, SILTFENCE/HAYBALE LINE TO BE STAKED AND INSTALLED PRIOR TO ANY OTHER SITEWORK. SITE AND SEWAGE PLAN OF 75 PARTRIDGE VALLEY ROAD IN THE TOWN OF: (WEST) YARMOUTH, MASS. PREPARED FOR: PAUL KERRIGAN 30 0 30 60 90 Feet SCALE: 1" = 30' DATE: MARCH 10, 1998