Loading...
HomeMy WebLinkAbout83-1451>� n _ �` 1 �Nrn o o� R mOc Z QY m T :xxti G y0 Ogg J Q —o C�� ;v 8p8 44 5� Locus LOCATION MAP LOT AREA 23,416 f S.F. (0.54 + AC.) ASSESSORS MAP. 71 PARCEL: W3 CURRENT ZONING: R-25 (1959 SUBDIVISION) BUILDING SETBACKS: F: 30' S: 6' R: 20' FLOOD ZONE: C. B ,& A6 (EL 7) KEY: EXISTING ONTOUR: - - - - PROPOSED'CONTOUR: EXISTING SPOT ELEVATION: 25.5 PROPOSEDSPOT ELEVATION: 25 TEST HOLE: -0 UTILITY POLE: -0- FENCE LINE: ' - HYDRANT: �� RETAININ WALL: 4 INFILTRATORS (MAXIMIZER CHAMBEIC ) WITH 4' OF STONE ALL AROUND (Sr x 1r x z DEEP (11r FROM RESERVE TO TOP OF COASTAL BANK) 29 28 \ .... -27- 28 .• - - i...i ....� ..F qg•4 25. !.• g0 i EDGE OF PAVE --' \ \ ` "aS iR I? 0-00 i so ljr BENCHMARK AT - 1::; (s ' i Ir CONCRETE BOUND _ _ T8' YI ELEVATION ® 26B s0. ` - SS s3 EEL NG 2238-2152 _ ZYIN YIN RC8 , 30A 4A 21.5'1. _ 0p05o0 Y 'i 25D Yg EDR NO so . 34 32_ _ - _ 4o8Ey11� 9 15A g9 TOP OF �p T ' 9✓~ 20a COASTAL BANK 6,O foA pq r nm7. ZLr 7. - • ' N 4.0 m - ' 0 fa 2a 3a 40' 50' D ' SECTION A -A ��+� �} �N 33 5e 15- 32' 11F I9.9A'.11r144A.rlr� i32 2217-21.26 $0.0 411F 25D 20.0 P or 15.0 99 N' COAASTAL BANK 10.0 pq 7t/R IMOD ZL■7D 4.0 0 10- 2a 3a 40' 50' SECTION B - B 212-2027 . 24117 30.0 36 25.0 20A �- TOP OF 15.0 4Z COASTAL BANK 10.0 Lr 7,0 4.0 0 fa 20' 30- 447 Sa SECTION C - C 2011-19.31 19.5 X-7 SOD 41 25A 20.0TTOPF 15D AS CAS70'AL BANK Z QD ZL 10D rQq I.tIR l.r 7D 4.0 0 fa 20. 3a 4a 50' SECTION D - D 30- - -_ - - - - _ _�_-_- - SO 28-- --- -Sr --- _ TOP OF -2s 26' - - - - - - - BANKK� - - - - - - - _- - _- _- _ - - - - _ _ 24-, ----- -- _---_- _ _ -7-7-7-7- ___ _-24 -20 ---___ --'~-- .-18 ------ 16-'= -- -_ _- - 14 fo __ _ _-_ =fo 6- rn. r rn nur,.r rJ rrrr,*rrTrR.r„r Q EDCE OF y Wunr Hann ARSB` 2' - - 'ME HIGH- _ WATER _ TEST HOLE LOGS ENGINEER: THOMAS McLELLAN, P.E. WITNESS: AMY VON HONE, RS. DATE: 3-18-98 PERCOLATION RATE: < 2 MIN/IN TH-1 28.0 TH-2 A HORIZON -� LOAMY SAND Ir rOYR 4/4 27.1 B HORIZON LOAMY SAND 3s' roYR s/8 251 C HORIZON FINE -MED SAND 25Y 7/3 ,s A HORIZON 10' %LOAMY SAND 4/4 27: B HORIZON LOAMY SAND s0' fOYR 5/8 1251 C HORIZON 2� 7/3 D SAND NO GROUNDWATER ENCOUNTERED NOTES: 1. VERTICAL DATUM: NGVD 2. MUNICAPAL WATER IS AVAILABLE. 3. SCHEDULE 40 - 4" PVC PIPE TO BE USED THROUGHOUT SEPTIC SYSTEM. 4. ALL PRECAST UNITS TO CONFORM WITH AASHTO H-10 LOADING SPECIFICATIONS. 5. PIPE PITCH = 1/4" PER FOOT, (UNLESS NOTED OTHERWISE). 6. FIRST 2' OF PIPE OUT OF D -BOX TO BE SET LEVEL. 7. THE SEPTIC SYSTEM HAS NOT BEEN DESIGNED TO ACCOMODATE THE USE OF A GARBAGE DISPOSAL. 8. ALL CONSTRUCTION DETAILS ARE TO BE IN CONFORMANCE WITH THE STATE OF MASS. ENVIRONMENTAL CODE (TITLE FIVE) AND LOCAL HEALTH REGULATIONS, 9. CONTRACTOR TO VERIFY LOCATIONS OF ALL UTILITIES PRIOR TO CONSTRUCTION. 10. GROUND COVER OVER ALL SEPTIC SYSTEM COMPONENTS NOT TO EXCEED 3.0'. 11. ALL UNSUITABLE SOIL (A & B HORIZON, APPROX. 36" DEEP) WITHIN 5' OF PROPOSED LEACH AREA IS TO BE REMOVED AND REPLACED WITH CLEAN MEDIUM SAND. 12. WORK LIMIT LINE TO BE DOUBLE STAKED HAY BALES OR SILT FENCE. LINE TO BE STAKED PRIOR TO CONSTRUCTION. 13. ROOF RUN-OFF TO BE DIRECTED TO DRYWELLS OR STONE TRENCHES AT DRIP LINES. 14 ALL DISTURBED AREAS TO BE REVEGETATED OR MULCHED UPON SEPTIC SYSTEM DESIGN COMPLETION OF PROJECT. FLOW ESTIMATE: A_ BEDROOMS AT 110 CAL/DAY/BEDROOM =KCAL/DAY SEPTIC TANK: 440 CAL/DAY x 2 DAYS = 880 GAL USE 1500 GALLON SEPTIC TANK LEACHING AREA: USE 4 INFILTRATORS (MAXIMIZER CHAMBERS WITH 4' OF STONE ALL AROUND (37" x 11 x 2' DEEP) SIDE AREA: (37 + f1)2 x 2 = 192 SF (.74) = 142 GAL/DAY BOTTOM AREA 37' x 1r = 407 SF (74) = 301 GAL/DAY CAPACITY = 443 GAL/DAY SEPTIC SYSTEM SECTION 33.0 TOP OF FOUNDATION Poor _--120' + 120'± EDGE oF'YARS .rr..., r,..rJr..rr...,r.... SECTION D -D SECTION B -B BASS RIVER SECTION A -A SECTION C -C 28.0 1500 GAL ELEV. SEPTIC TANK 28 5 (6" OF STONE UNDER OR ELEV. MECHANICALLY COMPACTED) DM DEMAREST-MCLELLAN ENGINEERING 24 SCHOOL STREET PD. BOX 463 98-03 (D28F5) WEST DENNIS, MASSACHUSETTS 02670 DM # PHONE d• FAX : (608) 398-7710 TEE SIZES: INLET: 6" UP, 13" DOWN OUTLET: 6" UP, 14" DOWN APPROVED BY: Vlo "A51 NciEWkl CAIL COVERS WITHIN 1r OF FINISHED GRADE (NOEF COR DRE) 0 BE WITHIN 27.75 t==;i ELEV. D -BOX 5 27.67 (6" OF ELEV. \ ELEV. STONE UNDER) GAS BAFFLE AT OUTLET TEE DATE: AZT Al THOMAS MCLELLAN, P.E. I JOHN Z. DEMAREST JR., ELEV. rs PD 3' 24' 24' 76' ' 26' 24' PROPOSED Di7ELLINC 2" PEASTONE 3/4" - 1 1/2" �-WASHED STONE � ELEV.= 27.0 L o �: 24.5 <4 ELEV. 4' E--- 37' 4 INFILTRATORS (MAXIMIZER CHAMBERS) WITH 4' OF STONE ALL AROUND (37' x 11' x 2' DEEP) SITE AND SEWAGE PLAN LOCATION LOT WS SALT BOX ROAD SOUTH YARMOUTH, MA PREPARED FOR. - DAVID HEALY SCALE. I"= 30' DATE. 5113198 REFERENCE: PLAN BOOK 154 PACE 29 REVISED: 6-9- ASSESSORS MAP. 71 PARCEL: W3 gory CURRENT ZONING: R-25 (1959 SUBDIVISION) ¢ rn S"IRR BUILDING SETBACKS: F: 30' S: 6' R: 20' FLOOD ZONE: C. B & A6 (EL 7) Locus LOCATION MAP LOT AREA 23,416 f S.F. (0.54 ± AC.) vi KEY. EXISTING CONTOUR: - - -- PROPOSED CONTOUR . .............................. EXISTING SPOT ELEVATION: 25.5 PROPOSED SPOT ELEVATION: 25 TEST HOLE: UTILITY POLE: -o- FENCE LINE: - HYDRANT. -6 RETAINING WALL: TREE: 4 INFILTRATORS fYAXIYIZER CHAMBERS) WITH P OF STONE ALL AROUND 3T s 1f s 2' DEEP llf FROM RESE E TO TOP OF COASTAL BANK) 29 28 \ 0 . ....... -27_ 28 Ss /i...i ....i• 79'44 25 Ir EDGE OF PAVE .99 R , GAg�g2 ) t ,29 s0 1 � 9t BENCHMARK AT ` 10 �s4s , 32 CONCRETE BOUND ELEVATION m 26.6 30. �' ' 33 1NG SS. ' i �aLLIP1G 22.38-2152 a 21.59. 30.0 4.0' 25.0 204 .� TOP OF 154 39 COASTAL BANK 10.0 144TIlRl&9PDdIr7D 44 0 f0 20 301 40 50' _ OSEDM i •'�.� i � 32_ 34 SECTION B - B 212-2027 247 SOD 3B 25.0 20A rTOP OF f5A 4COASTAL BANK f0A mrm J,v,, -7A 4.0 0 10 20 30' 40' 50 SECTION C - C 2011-1931 1 30A 41 9.5 X 25A 7 20.0 T 154 45 CONAL BANK 10A ...... TliR %WDdL"70 4A 0 10 20' 30 40 50 SECTION D - D vn 8i1 - 14 TN�� i 9 i 200' t+ PE 53' 15- o L(• l. N` 33Q 32' '_ RIIT Il 1411: 1,1 1 IIf 1111 IT( 111 ll ll?I� /32 30- _ _ - --- - - - - - - - - _ so 2 _ _ 8-- ------ -37'- _ - - - _28 OAL T 26 - -- - -- - - - -- --- -- -26 K'- -_ -_-_- - - - 24-; _ -- � --- _ -24 220- '-•�•'_ -_- _i_'r_ _ 1-_� -�•� �20 Imp '-48 16 14-�� -- _ - 14 12; - _ __---__ =_ _ --z -12 10= --------- - --= -__ _ -10 8. -'--- - - - - -- _-- _8 6 ; __ t - 11111.1111111111111111 - - - IIF.�rtI ^•, 111n nn• - 1J 141 w1, - ESE ,R•R.ly.11... - ......1. .....I OF F MARSH TEST HOLE LOGS ENGINEER. THOMAS McLELLAN, P.E. WITNESS: AMY VON HONE, R.S. DATE: 3-18-98 PERCOLATION RATE: < 2 MIN/IN TH-1 _ TH-2 A HORIZON LOAMY SAND 12" lOYR 4/4 271 B HORIZON LOAMY SAND 36" fOYR 5/8 1251 C HORIZON FINE -MED SAND 2.5Y 7/3 B HORIZON LOAMY SAND 30- 10YR 5/8 25J C HORIZON 25Y 7/3 FINE -ND SAND NO GROUNDWATER ENCOUNTERED NOTES: 1. VERTICAL DATUM. NCVD 2. MUNICAPAL WATER IS AVAILABLE. 3. SCHEDULE 40 - 4" PVC PIPE TO BE USED THROUGHOUT SEPTIC SYSTEM. 4. ALL PRECAST UNITS TO CONFORM WITH AASHTO H-10 LOADING SPECIFICATIONS. 5. PIPE PITCH = 114" PER FOOT, (UNLESS NOTED OTHERWISE). 6. FIRST 2' OF PIPE OUT OF D -BOX TO BE SET LEVEL. 7. THE SEPTIC SYSTEM HAS NOT BEEN DESIGNED TO ACCOMODATE THE USE OF A GARBAGE DISPOSAL. 8. ALL CONSTRUCTION DETAILS ARE TO BE IN CONFORMANCE WITH THE STATE OF MASS. ENVIRONMENTAL CODE (TITLE FIVE) AND LOCAL HEALTH REGULATIONS. 9. CONTRACTOR TO VERIFY LOCATIONS OF ALL UTILITIES PRIOR TO CONSTRUCTION. 10. GROUND COVER OVER ALL SEPTIC SYSTEM COMPONENTS NOT TO EXCEED 3.0. 11. ALL UNSUITABLE SOIL (A do B HORIZON, APPROX. 36" DEEP) WITHIN 5' OF PROPOSED LEACH AREA IS TO BE REMOVED AND REPLACED WITH CLEAN MEDIUM SAND. 12. WORK LIMIT LINE TO BE DOUBLE STAKED HAY BALES OR SILT FENCE. LINE TO BE STAKED PRIOR TO CONSTRUCTION. 13. ROOF RUN-OFF TO BE DIRECTED TO DRYWELLS OR STONE TRENCHES AT DRIP LINES. SEPTIC SYSTEM DESIGN 14. ALL DISTURBED AREAS TO BE REVECETATED OR MULCHED UPON COMPLETION OF PROJECT. FLOW ESTIMATE: 4 BEDROOMS AT 110 GAL/DAY/BEDROOM = 440 GAL/DAY SEPTIC TANK: 440 GAL/DAY x 2 DAYS = 880 GAL USE 1500 GALLON SEPTIC TANK LEACHING AREA: USE 4 INFILTRATORS (MAXIMIZER CHAMBERS) WITH 4' OF STONE ALL AROUND (37'x 11' x 2' DEEP) SIDE AREA.- (37 + 11)2 x 2 = 192 SF (.74) = 142 GAL/DAY BOTTOM AREA: 37' x 11' = 407 SF (74) = 301 GAL/DAY CAPACITY = 443 CAL/DAY SEPTIC SYSTEM SECTION 33.0 TOP OF FOUNDATION l00 /i I 28.0 1500 GAL ELEV. SEPTIC TANK\ 28.5 (6" OF STONE UNDER OR ELEV. MECHANICALLY COMPACTED) ATER �-- Y------ .111111111111 1 111/1111 1 1......111 OF1Y lA[f C,H 1. 11111111 1 1.......jj 1. 1111. RS 111111.11 SECTION D -D SECTION B -B BASS RIVER SECTION A -A SECTION C -A DM DEYAREST-MCLELLAN ENGINEERING 24 SCHOOL STREET P.O. BOX 463 98-038 (D28F5) WEST DENNIS, MASSACHUSETTS 02670 DM PHONE k FAX : (508) 398-7710 TEE SIZES: INLET: 6" UP, 13" DOWN OUTLET: 6" UP, 14" DOWN APPROVED BY: p4,,a�4�t COVERS WITHIN 12" OF FINISHED GRADE (ONE COVER TO BE WITHIN 6" OF GRADE) ,27.75 t ELEV. 1-BOXL_27B27.67(6" OF ELEV. \ ELEV. STONE UNDER) GAS BAFFLE AT OUTLET TEE DATE: L fla86£Yt` G. THOMAS McLELLAN, P.E. JOHN Z. DEMAREST JR., P.L.S. ELEV 1s DECK 1z 24' 3' 24' [GARAGE ROPOSED BEDROOM 24' UELLING 4' 26' 76'18' s' PFXB 14, 12' 8' 2T 24' PROPOSED DIPELLING 2" PEASTONE 3/4" - 1 1/2" WASHED STONE � ELEV: 27.0 I:I -h.l 24.5 E4 <4 ELEV. E- 37' --� 4 INFILTRATORS (MAXIMIZER CHAMBERS) WITH 4' OF STONE ALL AROUND (37' x 11' x 2' DEEP) SITE AND SEWAGE PLAN LOCATION.' LOT W3 SALT BOX ROAD SOUTH YARMOUTH, MA PREPARED FOR DAVID HEALY SCALE: I" = 30' DATE: 5113198 REFERENCE: PLAN BOOK 154 PAGE 29 SECTION A - A 2217-2126 30D 227. 418' % 25.0 20.0 TOP OF 154 g9y COASTAL BANK 1010 14Q T.IJR fwQD dlr 7,0 1 4.0 0 f0 20 30' 40' 50 SECTION B - B 212-2027 247 SOD 3B 25.0 20A rTOP OF f5A 4COASTAL BANK f0A mrm J,v,, -7A 4.0 0 10 20 30' 40' 50 SECTION C - C 2011-1931 1 30A 41 9.5 X 25A 7 20.0 T 154 45 CONAL BANK 10A ...... TliR %WDdL"70 4A 0 10 20' 30 40 50 SECTION D - D vn 8i1 - 14 TN�� i 9 i 200' t+ PE 53' 15- o L(• l. N` 33Q 32' '_ RIIT Il 1411: 1,1 1 IIf 1111 IT( 111 ll ll?I� /32 30- _ _ - --- - - - - - - - - _ so 2 _ _ 8-- ------ -37'- _ - - - _28 OAL T 26 - -- - -- - - - -- --- -- -26 K'- -_ -_-_- - - - 24-; _ -- � --- _ -24 220- '-•�•'_ -_- _i_'r_ _ 1-_� -�•� �20 Imp '-48 16 14-�� -- _ - 14 12; - _ __---__ =_ _ --z -12 10= --------- - --= -__ _ -10 8. -'--- - - - - -- _-- _8 6 ; __ t - 11111.1111111111111111 - - - IIF.�rtI ^•, 111n nn• - 1J 141 w1, - ESE ,R•R.ly.11... - ......1. .....I OF F MARSH TEST HOLE LOGS ENGINEER. THOMAS McLELLAN, P.E. WITNESS: AMY VON HONE, R.S. DATE: 3-18-98 PERCOLATION RATE: < 2 MIN/IN TH-1 _ TH-2 A HORIZON LOAMY SAND 12" lOYR 4/4 271 B HORIZON LOAMY SAND 36" fOYR 5/8 1251 C HORIZON FINE -MED SAND 2.5Y 7/3 B HORIZON LOAMY SAND 30- 10YR 5/8 25J C HORIZON 25Y 7/3 FINE -ND SAND NO GROUNDWATER ENCOUNTERED NOTES: 1. VERTICAL DATUM. NCVD 2. MUNICAPAL WATER IS AVAILABLE. 3. SCHEDULE 40 - 4" PVC PIPE TO BE USED THROUGHOUT SEPTIC SYSTEM. 4. ALL PRECAST UNITS TO CONFORM WITH AASHTO H-10 LOADING SPECIFICATIONS. 5. PIPE PITCH = 114" PER FOOT, (UNLESS NOTED OTHERWISE). 6. FIRST 2' OF PIPE OUT OF D -BOX TO BE SET LEVEL. 7. THE SEPTIC SYSTEM HAS NOT BEEN DESIGNED TO ACCOMODATE THE USE OF A GARBAGE DISPOSAL. 8. ALL CONSTRUCTION DETAILS ARE TO BE IN CONFORMANCE WITH THE STATE OF MASS. ENVIRONMENTAL CODE (TITLE FIVE) AND LOCAL HEALTH REGULATIONS. 9. CONTRACTOR TO VERIFY LOCATIONS OF ALL UTILITIES PRIOR TO CONSTRUCTION. 10. GROUND COVER OVER ALL SEPTIC SYSTEM COMPONENTS NOT TO EXCEED 3.0. 11. ALL UNSUITABLE SOIL (A do B HORIZON, APPROX. 36" DEEP) WITHIN 5' OF PROPOSED LEACH AREA IS TO BE REMOVED AND REPLACED WITH CLEAN MEDIUM SAND. 12. WORK LIMIT LINE TO BE DOUBLE STAKED HAY BALES OR SILT FENCE. LINE TO BE STAKED PRIOR TO CONSTRUCTION. 13. ROOF RUN-OFF TO BE DIRECTED TO DRYWELLS OR STONE TRENCHES AT DRIP LINES. SEPTIC SYSTEM DESIGN 14. ALL DISTURBED AREAS TO BE REVECETATED OR MULCHED UPON COMPLETION OF PROJECT. FLOW ESTIMATE: 4 BEDROOMS AT 110 GAL/DAY/BEDROOM = 440 GAL/DAY SEPTIC TANK: 440 GAL/DAY x 2 DAYS = 880 GAL USE 1500 GALLON SEPTIC TANK LEACHING AREA: USE 4 INFILTRATORS (MAXIMIZER CHAMBERS) WITH 4' OF STONE ALL AROUND (37'x 11' x 2' DEEP) SIDE AREA.- (37 + 11)2 x 2 = 192 SF (.74) = 142 GAL/DAY BOTTOM AREA: 37' x 11' = 407 SF (74) = 301 GAL/DAY CAPACITY = 443 CAL/DAY SEPTIC SYSTEM SECTION 33.0 TOP OF FOUNDATION l00 /i I 28.0 1500 GAL ELEV. SEPTIC TANK\ 28.5 (6" OF STONE UNDER OR ELEV. MECHANICALLY COMPACTED) ATER �-- Y------ .111111111111 1 111/1111 1 1......111 OF1Y lA[f C,H 1. 11111111 1 1.......jj 1. 1111. RS 111111.11 SECTION D -D SECTION B -B BASS RIVER SECTION A -A SECTION C -A DM DEYAREST-MCLELLAN ENGINEERING 24 SCHOOL STREET P.O. BOX 463 98-038 (D28F5) WEST DENNIS, MASSACHUSETTS 02670 DM PHONE k FAX : (508) 398-7710 TEE SIZES: INLET: 6" UP, 13" DOWN OUTLET: 6" UP, 14" DOWN APPROVED BY: p4,,a�4�t COVERS WITHIN 12" OF FINISHED GRADE (ONE COVER TO BE WITHIN 6" OF GRADE) ,27.75 t ELEV. 1-BOXL_27B27.67(6" OF ELEV. \ ELEV. STONE UNDER) GAS BAFFLE AT OUTLET TEE DATE: L fla86£Yt` G. THOMAS McLELLAN, P.E. JOHN Z. DEMAREST JR., P.L.S. ELEV 1s DECK 1z 24' 3' 24' [GARAGE ROPOSED BEDROOM 24' UELLING 4' 26' 76'18' s' PFXB 14, 12' 8' 2T 24' PROPOSED DIPELLING 2" PEASTONE 3/4" - 1 1/2" WASHED STONE � ELEV: 27.0 I:I -h.l 24.5 E4 <4 ELEV. E- 37' --� 4 INFILTRATORS (MAXIMIZER CHAMBERS) WITH 4' OF STONE ALL AROUND (37' x 11' x 2' DEEP) SITE AND SEWAGE PLAN LOCATION.' LOT W3 SALT BOX ROAD SOUTH YARMOUTH, MA PREPARED FOR DAVID HEALY SCALE: I" = 30' DATE: 5113198 REFERENCE: PLAN BOOK 154 PAGE 29