Loading...
HomeMy WebLinkAbout83-1453 - Septic System 003ACCESS COVERS MUST GENERAL NOTES: BE TO FINISH GRADE 9' MINIMUM. DES I GN CRITERIA: SOIL TEST PIT DATA e l8 5 PENT FIRST 2' TO 4'PERF PVC MIN. Z' OF DESIGN FLOW: 1. THIS PLAN IS FOR THE DESIGN AND CONSTRUCTION BLOB III MIN BE LEVEL SCHED 40 yp�� INDICATES INDICATES OF THE SEWAGE DISPOSAL SYSTEM ONLY. I6.2 MIN 2x PEASTONE ?BEDROOMS AT 1/0 G.P.D. PER r TESTOLATION GROUNDWATER TOP WALL 15.4 MIN BEDROOM EQUALS 220 G.P.D. 4' DIAM PIPE i FAST 15.39 2. VERTICAL DATUM IS NGVD. FOR BENCH MARKS uNrr TP •2A TP w3A -- 005 14.79 NO GARBAGE GRINDER SET. SEE SITE PLAN. 15.76 4 QdQ 4334vQ 14.24 15.4630'x !0' LEACH o 12.94 0 12.94 J. ALL CONSTRUCTION METHODS AND MATERIALS AND 3 OUTLETEPTIC TANK REOUIRfO: SAND LRAM � $98dt"eM > FIELD aor Tau !!.4 MAXwx 12'- 220 G.P.D. X 200x - 440 GAL.F/tt s0esOIL MAINTENANCE OF THE SEPTIC SYSTEM SHALL O -BOX SEPTIC TANK PROVIDED: 1500 GAL. MIN. LOAr 3/4' - 1 1/2' DIA. LOAM 11'94 le 11'44 A CONFORM TO MASS. D.E.P. TITLE 5 AND LOCAL 1500 GAL ^ WASHED STONE SUR$DIL BOARD OF HEALTH REGULATIONS. H-20 SEPTIC TANK 6' CRUSHED STONE BASE 24 FAST READY _ADJ e► • 9.24 SOIL ABSORPTION SYSTEM REQUIRED: !0'9� DESIGN PERC RATE5 MIN/INCH 4. ALL SEPTIC SYSTEM COMPONENTS LOCATED UNDER WATERTIGHT AND AREAS SUBJECT TO VEHICULAR TRAFFIC OR GREATER FACTORY WATERPROOFED - oes OW - 6,94 SOIL TEXTURAL CLASS S - I COARSE COARSE EFFLUENT LOADING RATE - 0.74 GPD/SF SAND SAND THAN 3' IN DEPTH SHALL BE CAPABLE OF WITH- INDEX WELL TJW e9. ZONE A 220 GPD / 0.74 GPD/SF - 298 s. F. REQUIRED STANDING H-20 WHEEL LOADS. PROFILE : Nor TO SCALE NOYEWYER 1990 ADJ-2. Jr 5. ALL SEWER PIPE SHALL BE SCHEDULE 40 OR PROVIDED: 10'x 30' LEACH FIELD, 6' DEEP 72' _ 6.94 72 _ 6,94 A 300 S.F. x 0.74 GPD/SF - 222 GPD , APPROVED EQUAL. 6. SEPTIC TANK AND D -BOX SHALL BE REINFORCED / PRECAST CONCRETE AND WATERTIGHT. lz2e 110' 2.94 76' 6.61 eYr IL 7. BEFORE CONSTRUCTION CALL 'DIG-SAFF'. \�- RIM • 12.57 I -888 -DIG -SAFE AND THE LOCAL WATER DEPT, og x12.2 DATE: DECEMBER 6, 1990 FOR LOCATION OF UNDERGROUND UTILITIES. q'b• TEST BY: C. YOUNG. DOWN CAPE eYW2 WITNESSED BY: DAVEMASON, BON 8. ALL UNSUITABLE MATERIAL (A 6 B HORIZONS) RIM - 12.2J ® &MCe1DN PERC RATE: C 2 MIN/INCH ENCOUNTERED BELOW THE INVERT OF THE LEACHING (0i EL•12.45 FACILITY TO BE REMOVED FOR A DISTANCE OF 5' AROUND AND REPLACED WITH SAND IN ACCORDANCE WITH TITLE 5. evWJ 9. NO DETERMINATION HAS BEEN MADE AS TO Q,1 12.72 COMPLIANCE WITH DEED RESTRICTIONS OR ZONINGCJ �1 1 \ _ ra.r c REGULATIONS. IT SHALL REMAIN THE CLIENTS \` \ \ \\ � ��- qc ! I \ U `� �o,P RESPONSIBILITY TO OBTAIN ALL PERMITS. SPECIAL PERMITS. VARIANCES ETC. FOR THIS PROJECT. 13.11 12,o qFe\� mF ev4 ac 13.1 LOCU r l0. ANY RETAINING WALL SHOWN ON THIS PLAN IS FOR °+ / DOr WIRE 0 �cF ��� / \ �' �s No POND D Q' .� \ (: . LO pOtA LOCATION ONLY AND SHALL BE DESIGNED 1NtD QO \ F Ne ACCORDANCE WITH STANDARD PRACTICE. / FAST 11X17 I \ I1. 1T SHALL REMAIN THE CLIENT'S RESPONSIBILITY 50 \ SSOO eatSEPTIC SEPTIC I F\ • �-_ �� TO HAVE THE PROPOSED BUILDING FOUNDATION s19 3 0° 10. D-eox TANK I '.• FILL F. DESIGNED TO ACCOUNT FOR THE EXISTING GRADE Sb ' 1 13 0 , / ? / Roy'" 1 AND SOIL CONDITIONS AT THE LOCATION OF THE `O 1J,5e PROPOSED BUILDING. Y` �ni2pl 12. SEPTIC SYSTEM INSTALLER SHALL NOTIFY THE It 72, �. s ' ��Q00� %"b •, \ +cs �/ 'y9 + DY7W 10 DESIGN ENGINEER TWO DAYS PRIOR TO CONSTRUCTION ' \ c lo.e ` ' s'Y' R SOIL REMOVAL Q ��° F ' '' _ \ F� �� LOCUS MAP OF THE SYSTEM TO ALLOW FOR SCHEDULING OF THE '¢ `� .°. i SEE NOTE e {t, \ 9Lp , CONSTRUCTION INSPECTIONS. INSPECTION'S SHALL B£'LEACH /1.3 Y►9 FIELD AS FOLLOWS: , tI. ENGINEER SHALL INSPECT WHEN THE REQUIRED / - \' �• EXCAVATION IS COMPLETE. l3 95 RM Ce1D r ry` �\ 1\t o r 7 S h e M +2. ENGINEER SHALL INSPECT WHEN THE FILL HAS EL -14 I1 �' 1 +12.21 1 \ J �1 'i 1 \ BEEN PROPERLY PLACED. �, 5_ , Yr e ♦3. ENGINEER SHALL STAKE THE PROPOSED LEACH - FILL 10.0 FIELD PRIOR TO PLACEMENT. �, 1 'r LQ% /y J7o \ 1 s� n.s " i•'r \i 1 04. ENGINEER SHALL INSPECT WHEN THE COMPONENTS \ \�� + �. ` �'� 133183 S.F. - OF THE SEPTIC SYSTEM HAVE BEEN INSTALLED. +1�\ yl�s� �� IT /`10 5� S E P T / C S Y S T EM D E-5 \ \ O. iia Y► 4 I 13. INSTALLATION OF FAST UNIT TO BE CERTIFIED BY \ \ �0. �' 9.9 / 300 L O /V G f O /VD O R / VE'. MA P -9.2. P A R CEL 4 / 7 \ 6 - FAST REPRESENTATIVE. A YEARLY INSPECTION AND MAINTENANCE CONTRACT SHALL BE MAINTAINED WITH \\?o• v►3 THE FAST REPRESENTATIVE. 1 TOP OF WATER 7130197 S O U T /� YA /®T ,l O U T1--1 tl A \\` Y- to 02 EL - e.0 14.THIS LOT FALLS WITHIN FLOOD ZONES C AND P AS �\` �' �i2 f� PR ZS_ PAREO FOR SHOWN ON FEMA COMMUNITY PANEL NO. 2500/5 004 C DATED 6/17/86. / 9 ° - /V E R 15. ROOF RUNOFF TO BE DIRECTED TO ORYWELLS OR A STONE TRENCH ALONG THE DRIP LINE. 1 0/0 L O /\/(a P O ND OR / VE . S O U TH 'KA R MO U T1-1. MA SCALE: / 20 MAY S'. /998 VAR LANCES REQUIRED: •1 ` L REVISED:SEPTEMBER 16. 1998 TITLE 5 SECTION 15.248. RESERVE AREA << EAGLE S U R V E Y I. NG I NC A VARIANCE 1S REQUESTED TO NOT SHOW A SEPARATE RESERVE9 2 3 Route 6 A AREA BUT TO REMOVE AND REPLACE THE LEACHING SYSTEM IN THE 1. / Yormouthport, MA. 02675 PRIMARY AREA 1N THE EVENT OF A FAILURE. f�l (508) 362-8132 /I � �SBTOWN OF YARMOUTH HEALTH REGULATION SECTION J.7. DISTANCES // (5 O 8 ) 432-5333 100' IS REQUIRED BETWEEN THE SAS AND THE WETLANDS. 60' AND - - - 75' ARE PROPOSED. 40' AND 25' VARIANCES ARE REQUESTED, 0 10 20 40 JOB N0: 96-258 F1EL0:CFW/EEK CAL SAN/CFW CHECK: CFW DRN: SAH