Loading...
HomeMy WebLinkAboutEngineered Plan - 20021 , SYSTEM PROFILE TOP FNDN. AT EL. 9 2 ACCESS COVER TO WITHIN 6 OF FIN. GRADE (NOT TO SCALE) ACCESS COVER (WATERTIGHT) TO MINIMUM .75' OF COVER OVER PRECAST /` WITHIN 6' OF FIN. GRADE 2% SLOPE REQUIRED OVER SYSTEM 2' DOUBLE WASHED PEASTONE RUN PIPE r�— FOR FIRSTL 16.6' EVEL 2' 3' MAX. (EXIST)*, PROPOSED 1 00 GALLON SEPTIC 15 25' if 15.5' . . 15.50' TANK <H--10.191 GAS �0C BAFFLE 14.71 4. 14.6 O O O EO = O O ; - 4' AROUND MIN E:j000 O 0000 ( 2 % SLOPE) �6' CRUSHED STONE OR MECHANICAL oo $ 2' y O O O O O O O M 0 12.6' *PLUMBING TO BECOMPACTION. (15.221 I2)) RE-ROUTED'TO EXIT FRONT DEPTH OF FLOW = 4 (--Ly % SLOPE) ( 1 % SLOPE) 3/4' TO 1 1/2' DOUBLE WASHED ST,ONE,""/ OF DWELLING AT ELEV. TEE SIZES SHOWN (OR AT MINIMUM 10" ELEVATION OF 16.1' IF INLET DEPTH PLUMBING REQUIRES 14" LOWERING) OUTLET DEPTH - LEACHING ---- FOUNDATION 26' SEPTIC TANK 37' D' BOX 13' FACILITY ROUTE 6A L02-376 4' USE PERCHED WATER AT EL. 8.6' TEST HOLE LOGS ENGINEER: RICK JUDD, RS WITNESS: AMY VON HONE, RS DATE: ll/ 26/Q2 PERC. RATE <_ 2 MIN/INCH CLASS 1 SOILS P# 147 ELEV. 0; 18.6' 10" F1 LL BW LMS 1OYR 5/6 Cl FS 2.5Y 6/4 C2 SILTY LOAM 2.5Y 5/2- 20.5 /220.5 136" 7.2' ° NOTES, �o -+ 19.9 1 DATUM IS ASSUMED 30" 16.1 ' 120" 8.6' OBS WATER (PERCHED) LOCUS ROUTE 6A I � 92 fi MARGARET JOSEPH RR - 9a 9 y o LOCATION MAP NTS ASSESSORS MAP 124 PARCEL 74 VARIANCE REQUESTED UNDER MAX. FEASIBLE COMPLIANCE 15.405: 10: REDUCTION IN SETBACK, SAS TO LOT LINE (10'TO7') 1i: REDUCTION IN (PERCHED) WATER SEPARATION (5' TO 4') SEPTIC DESIGN: (GARBAGE DISPOSER IS NOT ALLOWED > DEQ IGN FLOW: 3 BEDROOMS ( 110 GPD) = 330 GPD 2. MUNICIPAL WATER IS EXISTING USE: A 330 GPD DESIGN FLOW 3. MINIMUM PIPE PITCH TO BE 1/8' PER FOOT. _ 4.,_ DFSTGN L_DADING _ FOR ALL -_PRECAST _ UNITr_.T0 _F3F _ A,4SHn H -10., _. SE�`TIC TANK: 330 GPD ( 2 > - 660 5. PIPE JOINTS TO BE MADE WATERTIGHT. USE: A 150Q GALLON SEPTIC TANK 6. CONSTRUCTION DETAILS TO BE IN ACCORDANCE WITH MASS. ENVIRONMENTAL CODE TITLE V. LEACHING: - 2(25 + 12.83) 2 (.74) 7. THIS PLAN IS FOR PROPOSED SEPTIC SYSTEM ONLY AND IS NOT SIDES: 112 TO BE USED FOR ANY OTHER PURPOSE, 25 x 12.83 (.74) 237 8. PIPE FOR SEPTIC SYSTEM TO SCH. 40-4' PVC, BOTTOM= 9• COMPONENTS NOT TO BE BACKFILLED OR CONCEALED WITHOUT TOTAL: 472 S.F. fig_ GPD INSPECTION BY BOARD OF HEALTH AND PERMISSION OBTAINED USE (2) 500 GAL. LEACHING CHAMBERS (ACME OR FROM BOARD OF HEALTH. EQUAL) WITH 4' STONE ALL AROUND 10. PUMP & REMOVE (OR : FILL W/CLEAN SAND) ALL CESSPOOLS LEESS TITLE 5 SITE PLAN 100.0 PROPOSED SPOT ELEVATION OF 59ROUTE A M�P,Z 7 P�� 4 100x0 _ EXISTING SPOT ELEVATION IN THE TOWN OF: too PROPOSED CONTOUR YARMOUTH(PORT)- ARMOUTH(PORT)100 100EXISTING CONTOUR PREPARED FOR: gORTOLOTTI CONSTRUCTION/ELLIS X - X FENCE 20 0 20 40 60 BOARD OF HEALTH MA SCALE: 1„ 20' DATE: DECEMBER 5, 2002 PROVDATE off 508-362-4541 Q W Efax 508 362-9880 JAN 1 4 2003 down cape engineering, Inc. �VOF•r^ `9C HEALTH DEPT. CIVIL ENGINEERS o� AANE H. �G �pL1H Uf ,y� � OJALA 9J LAND SURVEYORSCIVIL No. 3 263 l ` 939 vain st, yarmouth, ma 02675 A ro E E� �s rcaE DA TE �� u