Loading...
HomeMy WebLinkAbout83-1523 - Sewage Disposal System - Lot 34)r < - r e r a . , a r e A,YS_AND . ..�.._' 1 - TE ,T.L<E S TO B� CENTERED . 'UNDER MANHOLE C0VER.SAND H 76 LOADINGa J 5A .; I 2 WALLS _.. NO ES 2.5 2SEP TAN T0 WTH REND8,E , „ oo _ 4 UNITS ht 7$�UNLESS UNDER R PAVEA NT DRIVES OR COVER MY SAND 1DYR 2 1 LOAMY SAND 10YRi TRAVELED WAYS EREINH20 LOADING LOAS „L0 LOAMY 2.SYR $ 1 1 t DIST. BOX ,H .70 LOADINGNGSHALLAPPLY. U LESS U DER PAVEMENT, DR VESOR o ECTIONS ANDCONCE4 l0AMYSAND 2.5YR `5 3. ALL PIPE CONN 4 nJ2��nrr1-4DIA(TRAVELED WHEREIN H_2D'LOADINO1DR5/AFr.YTtvceurx p IpEC o 0 0 0 0 500 12' o t REVISIONS N0: _ - -: DATE . DESCRIkION )IO.H.'ISSUE- 2. 12/11/00' B.O.H. COMMENTS REDUCE HSE.- = I 3. 11, 1 H f SIZE /20/0 &REVISE '.GRADIN GENERAL NOTES:'' 1. THIS PLAN IS FOR DESIGN AND CONSTRUCTION OF THE SEWAGE DISPOSAL FACILITY ONLY. 2. ALL CONSTRUCTION METHODS L AND " MATERIALS SHALL CONFORM TO MASS. D.E.P TITLE 5'AND LOCAL BOARD ' OF', HEALTH REGULATIONS-', 3. ALL PIPES LOCATED UNDER PAVEMENT ' OR,TRAVELED'WAY SHALL BE: SCHEDULE 40 OR'EOUAL 4. THERE ARE NO KNOWN PRIVATE WTELLS LOCATED WTHIN 150 FT. OF THE PROPOSED LEACHING FAC LITY NOR ANY KNOWN WELLS PROPOSED WITHIN 150' OF'ANY KNOWN LEACHING FACILITY. 5. WITHIN LIMIT OF:EXCAVATION REMOVE, ALL TOPSOIL. SUBSOIL AND OTHER IMPERVIOUS MATERIAL.. ` 6. REPLACE WITH CLEAN WASHED SANb.' OR 'OTHER CLEAN GRANULAR SOILS COItFORM ut TO THE FOLLo'MNG SIEVE ANALYSIS: 10% (MAX) BY WT.'SHALL PASS No. 50 SIEVE �<10 7 OF No. 4 SISVE SHALL PASS No, 100 <S : OF No. 4 SIEVE SHALL PASS No. 200 UNIFOR1<11TY.COEFFICIENT e Na, 4 SIEVE </=6,0 7. EXISTING UTILITIES VA47RE SHOWN 'IN THE DRAWONGS ARE APPROXIMATE THE CONTRACTOR SHALL BE RESPON- SIBLE FOR PROPERLY LOCATING AND COORDINATING THE PROPOSED CON- STRUCTION ACTIVITY WITH DIG -SAFE', AND THE APPLICABLE UTILITY COMPANY AND MA1NTAUNING THE , < EXISTING UTILITYSYSTEMIN SERVICE. ' DIG -SAFE SHALL BE NOTIFIED PER THE STATE O' MASSACHUSETTS STATUTE CHAPTER 82. SECTION 40S ' AT TEL 1-888-344-7233. THE ENGINEER DOES NOT GUARANTEE THEIR ACCURACY OR,THAT ALL ,< UTILITIES AND SUBSURFACE STRUCTURES ARE SHOWN. LOCATIONS AND ELEVATIONS OF UNDERGROUND UTILITIES TAKEN FROM RECORD PLANS. THE CONTRACTOR ''SHALL VERIFY SIZE,. r. LOCATION AND INVERTS OF UTILITIES AND STRUCTURES AS REWIRED PRIOR TO THE START OF CONSTRUCTION. ,8., THIS SYSTEM IS NOT DESI'�,ED FOR ' THE USE OF A GARBAGE GRINDER. A GARBAGE GRINDER IS NOT RECOMMENDED DUE TO RECOGNIZED ADVERSE IMPACTS TO THE LEACHING FACILITY. —777-7 ;The ESC Group, Inc 657 :ROUTES 28, (UNIT 6)$ WEST, YARMOUTH, 'MA . 02673 (508) 778-8919 PROJECT 11 TLE: . SEWAGE 'DISPOSAL SYSTDWI, DESIGN LOT = �3 s 88'';< PAM -'NNAVi!\UT,- DRi S. Y R1 ®UTI LISA A �:•�. MACDONPLD I" ��+ ,C IL 40134//,•%' PRE ED FOP: jjLL� �Y+ THOMAS:L& DONNA' 4 LORI " COURT. PITTSF IELD'; MASSACHUSETTS , Q1201 - DATE: .'JULY "12, 2000 COMP.'/DESIGN: K. HEALY " '-CHECK:, D-CRISPIN DRAWN: K.:,HEALY' FIELD: P.H. '/ A.D. FILE N0. .4818800/8188SEP1:DWG D%VG NO. 5179-12 SHEET 1 OF 1 , POB N0.4-8188.01 i