Loading...
83-1543 - Site PlanLEGEND 100.0 PROPOSED SPOT ELEVATION 100x0 EXISTING SPOT ELEVATION 100 PROPOSED CONTOUR — 1 DO — EXISTING CONTOUR 99-412 SEPTIC DESIGN: (GARBAGE DISPOSER IS NOT ALLOWED ) DESIGN FLOW: S- BEDROOMS (110 GPD) = 660 GPD USE A 660 GPD DESIGN FLOW SEPTIC TANK: 660 GPD (2—) = 1320 USE A 2000 GALLON SEPTIC TANK LEACHING: 2(58 + 10.83) 2 (.74) = 203.7 SIDES: 58 x 10.83 (.74) = 464.8 BOTTOM: TOTAL: 903 S.F. 668.6 GPD USE (6) 500 GAL, LEACHING CHAMBERS (ACME OR EQUAL) WITH 3.5' STONE AT ENDS AND 3' AT SIDES a SEPTIC PROFILE TOP FNDN = 20.43' (NOT TO SCALE) ACCESS COVER TO WITHIN 6" OF FIN. GRADE ACCESS COVER (WATERTIGHT) TO WITHIN 6" OF FIN. GRADE MINIMUM .75. OF COVER OVER PRECAST % 2% SLOPE REQUIRED OVER SYSTEM 19 0' 17.5' —�� PROP PROPOSED 2O 17.0• GALLON SEPTIC TANK (H- 10 ) MIN ( 2 7, SLOPE) DEPTH OF FLOW = 4 TEE SIZES: 10" INLET DEPTH OUTLET DEPTH 19 RUN PIPE LEVEL FOR FIRST 2' 16.75' JIL GAF 16.26' BAFFLE 16.43 6" CRUSHED STONE OR MECHANICAL COMPACTION. (15.221.[21) ( 2 X SLOPE) #5 ={•QoD VUY 1,56 WIRE �o BENCHMARK #6 FIRE HYDRANT _TAG BOLT #1462 ELEV =,,o L56' NGVD 16' D' BOX SAS. IN AREA 11OWN. DOUBLE tl _;d W_ f1 p9w 3/4" TO 1 1/2" DOUBLE WASHED STONE 28' 5 REMOVAL REQUIRED AROUND PERIMETER OF LEACH FACILITY, DOWN TO SUITAELE SOIL LAYER. REPLACE WITH CLEAN MEDIUM SAND. ENGINEER TO INSPECT AND CERTIFY REMOVAL. NOTE: PROVIDE SUPPORT FOR BOULDER (OR REMOVE) DURING CONSTRUCTION OF SEPTIC SYSTEM/SOIL REMOVAL, AS NECESSARY LEACHING FACILITY VARIANCE REQUESTED UNDER 15.405 1(b): REQUEST REDUCTION IN SETBACK TO FOUNDATION, 20' TO 15' DUE TO SITE CONSTRICTIONS (30 MIL LINER PROVIDED FOR MITIGATION) 5.17' EL. 8.0' TH2 MS 162" 10YR 6/8 4.5' 144" NO WATER NOTE: G -W TIDALLY INFLUENCED NOTES: 1, DATUM IS NGVD (RM 1) 2. MUNICIPAL WATER IS EXISTING 3. MINIMUM PIPE PITCH TO BE 1/8" PER FOOT. 4, DESIGN LOADING FOR ALL PRECAST UNITS TO BE AASHO H- 10 5. PIPE JOINTS TO BE MADE WATERTIGHT. 6. CONSTRUCTION DETAILS TO BE IN ACCORDANCE WITH MASS. ENVIRONMENTAL CODE TITLE V. 7. THIS, PLAN IS FOR PROPOSED WORK ONLY AND NOT TO BE USED FOR LOT LINE STAKING. 8. PIPE FOR SEPTIC SYSTEM TO SCH, 40-4" PVC. 9. COMPONENTS NOT TO BE BACKFILLED OR CONCEALED WITHOUT INSPECTION BY BOPIRD OF HEALTH AND PERMISSTm, nuTA?NFD FROM BOARD OF HEALTH. 10. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION OF ALL UNDERGROUND & OVERHEAD UTILITIES PRIOR TO COMMENCEMENT OF WORK. 11. ROOF RUN-OFF SHALL BE DIRECTED TO DRYWELLS, OR TO STONE TRENCHES TITLE S SITE PLAN OF 108 MILL LANE IN THE TOWN OF: YARMOUTH (PORT) PREPARED FOR: RONALD AND LAUREL GABEL 30 0 30 60 90 SCALE: 1" = 30 DATE: SEPTEMBER 27, 2000 REV. FEBRUARY 2, 2001 \OF `P`1H Of dIgIJN %1q'pJ\ oz� q ARNE �s ARNE H. yG�, y, `F\ � alnnLn C T v OJA A 1 L 4 No. 2 37E1 04 No.3 2 ��/ Ff. 0 L P.L.S. DATE off 506-362-4541 fox 906 362-9860 down cape engineering, inc. CIVIL ENGINEERS LAND SURVEYORS 939 main st. yarmouth, ma 02675 TEST HOLE LOGS ENGINEER: M. FARIA, SE WITNESS: KELDA GORMAN/BRUCE MURPHY DATE: FEBRUARY 9, 2000PERC. RATE _ < 2 MIN/INCH I SOILS P# MN.L LANECLASS j04- 9ELEV. Q ELEV.�0"18.020.0. pMlll POND Z`AFILL SL 10" 10YR 3/1 MAP NO SCALE 12" B B B LS ASSESSORS MAP 121 PARCEL 13 10 5/6 14" 10YR 5/6 ZONING DISTRICT: R40 36" -YR 15 YARD SETBACKS: FRONT = 30' ff C1 SIDE = 20' 60"SILT REAR = 20' LOAM FLOOD ZONE: V4 EL. 14, A5 EL 12, A3 EL. 11, C 2.5Y 5/4 C2 V4 FLOODZONE IN MARSH AREA 108" COS HOUSE AND ADDITION LIE IN FLOODZONE C SOME SILT C2 1 OBS. WATER 8.0' 2.5Y 5/4 MS 162" 10YR 6/8 4.5' 144" NO WATER NOTE: G -W TIDALLY INFLUENCED NOTES: 1, DATUM IS NGVD (RM 1) 2. MUNICIPAL WATER IS EXISTING 3. MINIMUM PIPE PITCH TO BE 1/8" PER FOOT. 4, DESIGN LOADING FOR ALL PRECAST UNITS TO BE AASHO H- 10 5. PIPE JOINTS TO BE MADE WATERTIGHT. 6. CONSTRUCTION DETAILS TO BE IN ACCORDANCE WITH MASS. ENVIRONMENTAL CODE TITLE V. 7. THIS, PLAN IS FOR PROPOSED WORK ONLY AND NOT TO BE USED FOR LOT LINE STAKING. 8. PIPE FOR SEPTIC SYSTEM TO SCH, 40-4" PVC. 9. COMPONENTS NOT TO BE BACKFILLED OR CONCEALED WITHOUT INSPECTION BY BOPIRD OF HEALTH AND PERMISSTm, nuTA?NFD FROM BOARD OF HEALTH. 10. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION OF ALL UNDERGROUND & OVERHEAD UTILITIES PRIOR TO COMMENCEMENT OF WORK. 11. ROOF RUN-OFF SHALL BE DIRECTED TO DRYWELLS, OR TO STONE TRENCHES TITLE S SITE PLAN OF 108 MILL LANE IN THE TOWN OF: YARMOUTH (PORT) PREPARED FOR: RONALD AND LAUREL GABEL 30 0 30 60 90 SCALE: 1" = 30 DATE: SEPTEMBER 27, 2000 REV. FEBRUARY 2, 2001 \OF `P`1H Of dIgIJN %1q'pJ\ oz� q ARNE �s ARNE H. yG�, y, `F\ � alnnLn C T v OJA A 1 L 4 No. 2 37E1 04 No.3 2 ��/ Ff. 0 L P.L.S. DATE off 506-362-4541 fox 906 362-9860 down cape engineering, inc. CIVIL ENGINEERS LAND SURVEYORS 939 main st. yarmouth, ma 02675