Loading...
HomeMy WebLinkAbout83-1560 - Site Plan002LEGEND 100.0 PROPOSED SPOT ELEVATION 100x0 EXISTING SPOT ELEVATION 100 PROPOSED CONTOUR 100 EXISTING CONTOUR 5-6 6.35.7 6.3 6.3 F 3 F SEPTIC DESIGN: (GARBAGE DISPOSER IS NOT ALLOWED ) DESIGN FLOW: 3- BEDROOMS (110 GPD) = 330 GPD USE A 330 GPD DESIGN FLOW SEPTIC TANK: 330 GPD ( 2 ) = 660 USE A ?500 GALLON SEPTIC TANK LEACHING: AFTER INSTALLATION USED FOR LOT LINE STAKING. 8. PIPE FOR SEPTIC SYSTEM TO SCH. 40-4" PVC. N/A COMPONENTS NOT TO BE BACKFILLED OR CONCEALED WITHOUT SIDES: INSPECTION BY BOARD OF HEALTH AND PERMISSION OBTAINED FROM BOARD OF HEALTH BOTTOM: CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE 30 x 15 (.74) = 333 :PROPOSEDJ1 ) TOTAL: 450 S. F. 333 GPD USE 2 ROWS OF 4 STANDARD INFILTRATORS WITH 3' STONE AT SIDES 3.3' BETWEEN ROWS AND 2.5' AT ENDS APPROVED DATE BOARD OF HEALTH MA FIRST FLOOR MIN. ELEV. 12.0' SYSTEM PROFILE TEST HOLE LOGS ACCESS COVER TO WITHIN 6" OF FIN. GRADE (NOT TO SCALE) � ACCESS COVER (WATERTIGHT) TO ENGINEER: ARNE H. OJALA, PE 1 O.6 MINIMUM .75' OF COVER OVER PRECAST WITHIN 6" OF FIN. GRADE 9 25' AMY VON HONE, RS 2% SLOPE REQUIRED OVER SYSTEM WITNESS: TEE SIZES: INLET DEPTH OUTLET DEPTH = 14" FOUNDATION- 14' SEPTIC TANK 12' -- D' B0: 5' REMOVAL OF UNSUITABLE SOIL REQUIRED Z AROUND PERIMETER OF SYSTEM DOWN TO Z SUITABLE SOIL LAYER. REPLACE WITH CLEAN y MEDIUM SAND. ENGINEER TO INSPECT AND s 2 CERTIFY REMOVAL 7.2 F --, LOT 7A EXISTING � II J1y 5 F HOUSE. 6 ` 7. j 118R EXIST. DWELL. TO BE REMOVED AND DISPOSED 1 AT AN APPROVED SITE !V�� J�154 7.2 -V�� FENCf�.6 7. 7.7 _ 4 {'. 13 � I � a /� � 50'��'��'•, 7.2 +1 5.6 I I 1 f c C�o i 7 B f , ! 7. I 1.4 l I ! 2.9'8 LOT 5A 1 �• I a' 1 / 13.900 SF± ' �) 4.4- -- 0.32 ACRE± I I -'0 rn I ff , I }b� F1 6D � 7.0 4 98-391 RIM si., 7 m Cs- 6.9 PAVED DRIVE 7.4 �.% �" i 6��. (REMOVE) 7.5 7 / PROP. CONCRETE RETAINING WALL AT ELEV. 8.5' 0 6.0 I I 1 o N 101 ^ m t3 I ,SLP P� � I✓_.P�..' f 7.t y.0 75 74 x C FENCE ACCESS STEPS SHED 7.5 7., 7.4._� LOT 5A EXISTING HOUSE 6.9 0 WATER GATE ELEV = 6.81' NGVD PROPOSED DRIVEWAY 2 6.4 ,• 'Sro 6.6 R PROP, DWELLING MIN, FIRST FLOOR ELEVATION 12.0 6 MIL POLY VINYL A%' MASTIC EL. 8.5' 10 I ON INSIDE OF RETAINING ',HALL (6) #3 BARS CONT. FOR -I HORIZONTAL REINFORCEMENT EL. 6.3' #3 BARS 16" O.C. FOR VERTICAL REINFORCEMENT 6" 4.3' BASE EL. SAND&GRAVEL FILL COMPACTED CONC. RET. WALL (NTS) USE ADJ. WATER ELEV. AT 2.5' (TIDALLY INFLUENCED) LOAM FILL 12" SAND FILL 72" OBS. wnrEe 0.4 P EAT 120" 1 1 -3.6' C MS 144" 1 -5.6' NOTES: i00tE DATUM IS NGVD SITE LOCUS I RUN PIPE LEVEL Y' DOUBLE WASHED PEASTONE DATE: 3/3/99 LEWIS POND it SOUND 5. 11.0'± 6, (� LOCUS FOR FIRST 2 8.5' < 2 PERC. RATE _ICI;If MIN/INCH AFTER INSTALLATION USED FOR LOT LINE STAKING. 8. PIPE FOR SEPTIC SYSTEM TO SCH. 40-4" PVC. 9. COMPONENTS NOT TO BE BACKFILLED OR CONCEALED WITHOUT SUBSTANTIAL COMPLIANCE WITH THE APPROVED INSPECTION BY BOARD OF HEALTH AND PERMISSION OBTAINED FROM BOARD OF HEALTH 10. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE 869 :PROPOSEDJ1 ) TO COMMENCEMENT OF WORK. 8.15' 0 8.08' _ o GLASS SOILS P# SITE PLAN ` of o00 8.32' 0.58' _ IN THE TOWN OF: MIN (SOUTH) YARMOUTH PREPARED FOR: BONNIE BROWNING %•5' SCALE: 1" = 20' DATE: JUNE 21, 2001 ( 2 % SLOPE) �6" CRUSHED STONE OR MECHANICAL oo�g -- o"�'o ELEV. COMPACTION. (15.221 12]) Ep DEPTH OF FLOW 4 ( % SLOPE) ( % SLOPEI .s/4" TO 1 1 /9" nnURI F WASHFn STONE 0" 6.4' TEE SIZES: INLET DEPTH OUTLET DEPTH = 14" FOUNDATION- 14' SEPTIC TANK 12' -- D' B0: 5' REMOVAL OF UNSUITABLE SOIL REQUIRED Z AROUND PERIMETER OF SYSTEM DOWN TO Z SUITABLE SOIL LAYER. REPLACE WITH CLEAN y MEDIUM SAND. ENGINEER TO INSPECT AND s 2 CERTIFY REMOVAL 7.2 F --, LOT 7A EXISTING � II J1y 5 F HOUSE. 6 ` 7. j 118R EXIST. DWELL. TO BE REMOVED AND DISPOSED 1 AT AN APPROVED SITE !V�� J�154 7.2 -V�� FENCf�.6 7. 7.7 _ 4 {'. 13 � I � a /� � 50'��'��'•, 7.2 +1 5.6 I I 1 f c C�o i 7 B f , ! 7. I 1.4 l I ! 2.9'8 LOT 5A 1 �• I a' 1 / 13.900 SF± ' �) 4.4- -- 0.32 ACRE± I I -'0 rn I ff , I }b� F1 6D � 7.0 4 98-391 RIM si., 7 m Cs- 6.9 PAVED DRIVE 7.4 �.% �" i 6��. (REMOVE) 7.5 7 / PROP. CONCRETE RETAINING WALL AT ELEV. 8.5' 0 6.0 I I 1 o N 101 ^ m t3 I ,SLP P� � I✓_.P�..' f 7.t y.0 75 74 x C FENCE ACCESS STEPS SHED 7.5 7., 7.4._� LOT 5A EXISTING HOUSE 6.9 0 WATER GATE ELEV = 6.81' NGVD PROPOSED DRIVEWAY 2 6.4 ,• 'Sro 6.6 R PROP, DWELLING MIN, FIRST FLOOR ELEVATION 12.0 6 MIL POLY VINYL A%' MASTIC EL. 8.5' 10 I ON INSIDE OF RETAINING ',HALL (6) #3 BARS CONT. FOR -I HORIZONTAL REINFORCEMENT EL. 6.3' #3 BARS 16" O.C. FOR VERTICAL REINFORCEMENT 6" 4.3' BASE EL. SAND&GRAVEL FILL COMPACTED CONC. RET. WALL (NTS) USE ADJ. WATER ELEV. AT 2.5' (TIDALLY INFLUENCED) LOAM FILL 12" SAND FILL 72" OBS. wnrEe 0.4 P EAT 120" 1 1 -3.6' C MS 144" 1 -5.6' ASSESSORS MAP 25 PARCEL 28 ZONING DISTRICT: R-25 YARD SETBACKS: FRONT = 30' SIDE = 15' REAR = 20' PLAN REF. - FLOOD ZONE: Al2 ELEV, 12 NOTES: i00tE DATUM IS NGVD SITE LOCUS I 3. II LEWIS POND it SOUND 5. NANTUCKET 6, CONSTRUCTION DETAILS TO BE IN ACCORDANCE WITH MASS. LOCUS MAP SCALE: NTS AFTER INSTALLATION USED FOR LOT LINE STAKING. ASSESSORS MAP 25 PARCEL 28 ZONING DISTRICT: R-25 YARD SETBACKS: FRONT = 30' SIDE = 15' REAR = 20' PLAN REF. - FLOOD ZONE: Al2 ELEV, 12 NOTES: 1. DATUM IS NGVD 2. MUNICIPAL WATER IS AVAILABLE 3. MINIMUM PIPE PITCH TO BE 1/8" PER FOOT. 4. DESIGN LOADING FOR ALL PRECAST UNITS TO BE AASHO H-10 5. PIPE JOINTS TO BE MADE WATERTIGHT. 6, CONSTRUCTION DETAILS TO BE IN ACCORDANCE WITH MASS. DEPOSITED ENVIRONMENTAL CODE TITLE V. 7. THIS PLAN IS FOR PROPOSED WORK ONLY AND NOT TO BE AFTER INSTALLATION USED FOR LOT LINE STAKING. 8. PIPE FOR SEPTIC SYSTEM TO SCH. 40-4" PVC. 9. COMPONENTS NOT TO BE BACKFILLED OR CONCEALED WITHOUT SUBSTANTIAL COMPLIANCE WITH THE APPROVED INSPECTION BY BOARD OF HEALTH AND PERMISSION OBTAINED FROM BOARD OF HEALTH 10. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LUCATiON OF ALi_ UNDERGF:O'ND & OVERHEAD UHLITIEa PRIOR TO COMMENCEMENT OF WORK. 11. PUMP AND REMOVE EXISTING SEPTIC SYSTEM 12. DRYWELLS/TRENCHES REQUIRED FOR ROOF RUN-OFF SITE PLAN ` of #125 PAWKANNAWKUT DRIVE IN THE TOWN OF: (SOUTH) YARMOUTH PREPARED FOR: BONNIE BROWNING 20 0 20 40 60 SCALE: 1" = 20' DATE: JUNE 21, 2001 REQUIRED INSPECTIONS AND CERTIFICATIONS 1. ENGINEER SHALL INSPECT WHEN REQUIRED EXCAVATION IS COMPLETE. 2. ENGINEER SHALL STAKE FOOTING PRIOR TO POURING 3. ENGINEER SHALL INSPECT FOOTING AND REBAR PRIOR TO POURING OF WALL 4. ENGINEER SHALL INSPECT WHEN CLEAN FILL HAS BEEN PROPERLY DEPOSITED 5. ENGINEER SHALL INSPECT AND CERTIFY SEPTIC COMPONENTS AFTER INSTALLATION ENGINEER SHALL CERTIFY TO YARMOUTH HEALTH DEPARTMENT THAT THE RETAINING WALL AND SEPTIC SYSTEM HAVE BEEN INSTALLED IN SUBSTANTIAL COMPLIANCE WITH THE APPROVED PLAN. 7/17/61/ DATE. off 508-362-4541 ye fav 508 362-9880 I down cape engineering, Inc. CIVIL ENGINEERS LAND SURVEYORS 939 main St. yarmouth, ma 02675