Loading...
HomeMy WebLinkAbout2016 Aug 09 - Email to Moran Engineering , i ! ' � vonHone, Amy i • From: vonHone, Amy Sent: Tuesday, August 09, 2016 9:10 AM To: Rick Judd (rick.moraneng@gmail.com) � Subject: 140 Beacon Street I I Hi Rick- ; Just reviewed this plan —the leach facility will need to be maintained 25' from the drainage easement, and per j our engineering records, there are drainage structures installed in the easement. It looks like you have plenty ! of room, especially since the family room is on sonotubes which will allow the leach facility to be closer to the , dwelling if you are trying to avoid the failed leach pit. Everything else is all set on the plan. ! Call or email with any questions. , Thanks, Amy ' Amy L.von Hone, R.S., C.H.O. ' Assistant Health Director � Yarmouth Health Department � 1146 Route 28 South Yarmouth, MA 02664 (0) 508-398-2231 X1241 (F) 508-760-3472 avonhoneCa�varmouth.ma.us 1 1