Loading...
HomeMy WebLinkAbout83-15662 �Ro-o »ro O od _og U�vo o vA `" LUI�p' Z20 lo ._ gN <� m �T -m a �¢p M �QU :>F m P. .E Na -Nm ¢Q~ = IO � `u� _'� U f U aQ Deco mNgcc mS m oma' oN� oa w5c �m ¢ � mago z iLLln r»waE iEMo. ar TOP FNDN AT EL. 16.3' UTILITY POLE UNDERGROUND FROM HERE 01-139 PROPOSED ADDITION TO EXISTING LEACH FACILITY (TO CONSIST OF 3 HIGH CAPACITY INFILTRATORS SET IN AN I I'x 23' x 11" DEEP TRENCH CONFIGURATION) CONNECT TO EXISTING LEACH FIELD AT SAME ELEVATION VENT (RE -LOCATE) SYSTI M PROFILE_ �. NOT TO SCALE) A- PVC CONNECTIONFROM EXISTING LEACH FACILITY TO PROPOSED (PROVIDE STONE BETWEEN SYSTEMS AS NEEDED) EXISTING LEACHING FACILITY AREA (CONSISTS OF 1V x 35' \ A x 11" DEEP INFILTRATOR/STONE SYSTEM PER AS -BUILT). CONFIRM LOCATION AND CONNECT TO PROPOSED LEACi FACILITY PROP LANDING DECK, COpS,� V CB 3.5' WID (HA;.HED NO AREA) ON _Cwl:ST a LEVEL OF DWEING ^c i�r PROP. 2' WIDE REMOVABLE STAIRS OVER RIP RAP 2% SLOPE REQUIRED OVER SYSTEM MATCH * MATCH ELEVATION OF EXISTING LEACHING FACILITY Y TEST HOLE LOGS ENGINEER: RICK JUDD, RS WITNESS: AMY VON HONE, RS DATE: 6/28/01 PERC. RATE _ < 5 MIN/INCH CLASS I SOILS P# APPROX, 10' AS PER ORIGINALLY APPROVED SITE PLAN BY SWEETSER ENG'G 8.83' 5.3' GROUNDWATER EXPECTED AT EL, 3.5't 50" ELEV. 1 19.0' FILL C MED/COS 2.5Y 7/3 122" 1 J 8_83 NO WATER ENCOUNTERED SEPTIC DESIGN: (GARBAGE DISPOSER IS NOT ALLOWED DESIGN FLOW: 5 BEDROOMS (110 GPD) = 550 GPD USE A 550 GPD DESIGN FLOW SEPTIC TANK: 550 GPD ( 2 ) = 1100 USE A 1500 GALLON SEPTIC TANK (EXIST) LEACHING: SIDES: (58 + 10.83) (.74) (.92) 2 = 93.7 BOTTOM: 58 x 10.83 (.74) = 464 _7 T137 753_St. }t USE EXISTING LEACHING FACILITY CONSISTING OF 11' x 35' x 11" DEEP INFILTRATOR STONE SYSTEM AND CONNECT TO IT A 23' x 11' x 11" DEEP INFILTRATOR/STONE SYSTEM (3 HIGH CAPACITY INFILTRATORS WITH 4' STONE AT SIDES AND 4.25' AT END AND 1" UNDER BOARD OF HEALTH APPROVED DATE -LEGEND 100.0 PROPOSED SPOT ELEVATION 100x0 EXISTING SPOT ELEVATION 100 PROPOSED CONTOUR — — Too-- EXISTING CONTOUR MA CREAT WESTERN POND ROAp Bp55 µCLLR � I LOCATION MAP NTS ASSESSORS MAP 92 PARCEL 7 ZONING DISTRICT: R 40 YARD SETBACKS: FRONT = 30' SIDE = 20' REAR = 20' PLAN REF. — FLOOD ZONE: A5 EL 7 AND C NOTES: 1. DATUM IS NGVD 2, MUNICIPAL WATER IS EXISTING 3. MINIMUM PIPE PITCH TO BE 1/8" PER FOOT. 4. CONSTRUCTION DETAILS TO BE IN ACCORDANCE WITH MASS. ENVIRONMENTAL CODE TITLE V. 5. THIS PLAN IS FOR PROPOSED WORK ONLY AND NOT TO BE USED FOR LOT LINE STAKING. 6. PIPE FOR SEPTIC SYSTEM TO SCH. 40-4" PVC. 7. COMPONENTS NOT TO BE BACKFILLED OR CONCEALED WITHOUT INSPECTION BY BOARD OF HEALTH AND PERMISSION OBTAINED Form. Tlnnon n17 ti1FA'.TLA 8. CONTRACTOR SHALL BE RESPONSIBLE -Oh VERIFY!"" IHE LOCATION OF ALL UNDERGROUND & OVERHEAD UTILITIES PRIOR TO COMMENCEMENT OF WORK. SITE PLAN of 426A HIGHBANK ROAD IN THE TOWN OF: (SOUTH) YARMOUTH PREPARED FOR: JOHN HENDERSON 20 0 20 40 60 Feet SCALE: 1 = 20 DATE: AUGUST 1, 2001 �I// PA TE off 508-382-4541 t, lox 508 3(2-9880 I down cape engineering, inc. CIVIL ENGINEERS LAND SURVEYORS 939 main st. yarmouth, ma 02675 N 01-139 TOP FNDN AT EL. 16.3' EXIST. 1500 GALLON SEPTIC TANK (H- 10 ) UTILITY POLE UNDERGROUND 40' WIDE FROM HERE R.O.W. / A SYSTEM PROFILE (NOT TO KALE) 2% SLOPE REQUIRED OVER SYSTEM 19.0' 2" DOUBLE WASHED PEASTONE EXIST. 08 * a 0.92 ao 3/4" TO 1 1/2" DOUBLE WASHED STONE 'k MATCH ELEVATION OF EXISTING LEACHING FACILITY IP / 1 PROPOSED ADDITION TO FND / I EXISTING LEACH FACILITY (TO CONSIST OF 3 HIGH CAPACITY 4, 1NFILTRATORS SET IN AN 11'x 23' x 11" DEEP TRENCH �d CONFIGURATION) f CONNECT TO EXISTING LEACH FIELD AT SAME ELEVATION RE -LOCATED i i VENT BENCHMARK - 1 L-- -- nz SPIKE IN 14' OAK 2' OFF GROUND ' ELEV. = 25.28' _� VERE-LOCATE) NGVD 1��NT ( 1 L I +. 4" PVC CONNECTION FROM EXISTING LEACH FACILITY TO Zn GRAVEL 1 1 II +`� PROPOSED (PROVIDE STONE BETWEEN SYSTEMS AS NEEDED) r DRIVE l EXISTING LEACHING FACILITY AREA (CONSISTS OF 11' x 35' �1 \ x 11" DEEP INFILTRATOR/STONE SYSTEM PER AS -BUILT). CONFIRM LOCATION AND CONNECT TO PROPOSED LEACH FACILITY - J IP FND BLOC PATI GRAVEL DRIVE l v- -� ❑ EXIST. D -BOX PER I -1t,._- ASSUILTI � EXIST. \ i 1 - - STEP / .WATER / �� TOP FNDN ` IF SHUTOFF �' /� EL .=16.31' slrwe FND / DWELLING ) i PROP. 2nd STORY ADDITION - OVER EXISTING FOOTPRINT1 \ N5 (HATCHED AREA) p1._.__._- --' — — MULCH ew ON COBBLESTONE PROP. 6' WIDE 1 �� PATIO CANTELEVERED DECK,r. I weje�lc. N� - 6ASfAL�N i LZ MP¢S •.'i I EXIST. / 5P I STAIRS #3 tPL¢PHi� / -; � PROP. LANDING DECK, IT CB 3.5' WIDE (HATCHED - NO AREA) ON LOWEST LEVEL OF DWELLIN( �-� PROP. 2' WIDE FND I ' REMOVABLE STAIRS OVER RIP RAP i IWRP�K-., �s BASS RIVER /J P EL000/ TEST HOLE LOGS ENGINEER: RICK JUDD, RS WITNESS: AMY VON HONE, RS DATE: 6/28/01 PERC. RATE _ < 5 MIN/INCH CLASS I SOILS P# ELEV. 011 1 0„ 19 V TFILL APPROX. 10' AS PER ORIGINALLY APPROVED SITE PLAN BY SWEETSER ENG'G 8.83' 5.3' GROUNDWATER EXPECTED AT EL. 3.5'1 50" C MED/COS 2.5Y 7/3 122" 8.83 NO WATER ENCOUNTERED SEPTIC DESIGN: (GARBAGE DISPOSER IS NOT ALLOWED ) DESIGN FLOW: 5 BEDROOMS (110 GPD) = 550 GPD USE A 550 GPD DESIGN FLOW SEPTIC TANK: 550 GPD ( 2 ) = 1100 USE A 1500 GALLON SEPTIC TANK (EXIST) LEACHING: SIDES: (58 + 10.83) (.74) (.92) 2 = 93.7 -3 x 1C.CC (.7• ` - 4E4 BOTTOM: - 753 - -- TOTAL: S.F. 557.7 GPD USE EXISTING LEACHING FACILITY CONSISTING OF 11 x 35' x 11" DEEP INFILTRATOR STONE SYSTEM AND CONNECT TO IT A 23' x 11' x 11" DEEP INFILTRATOR/STONE SYSTEM (3 HIGH CAPACITY INFILTRATORS WITH 4' STONE AT SIDES AND 4.25' AT END AND 1 ' UNDER BOARD OF HEALTH MA APPROVED DATE LEGEND 100.0 PROPOSED SPOT ELEVATION 100x0 EXISTING SPOT ELEVATION: 100 PROPOSED CONTOUR — — 100— — EXISTING CONTOUR ORfAJ WESTERN ROAD RON) / Rel[R Bp55 I- I LOCATION MAP NTS ASSESSORS MAP 92 PARCEL 7 ZONING DISTRICT: R 40 YARD SETBACKS: FRONT = 30' SIDE = 20' REAR = 20' PLAN REF. - FLOOD ZONE: A5 EL 7 AND C NOTES: 1. DATUM IS NGVD 2. MUNICIPAL WATER IS EXISTING 3, MINIMUM PIPE PITCH TO BE 1/8" PER FOOT. 4. CONSTRUCTION DETAILS TO BE IN ACCORDANCE WITH MASS. ENVIRONMENTAL CODE TITLE V. 5. THIS PLAN IS FOR PROPOSED WORK ONLY AND NOT TO BE USED FOR LOT LINE STAKING. 6. PIPE FOR SEPTIC SYSTEM TO SCH. 40-4" PVC. 7. COMPONi=NT:; NOT TO DE PACKYILLLD OR CONCEALED WITHOUT INSPEt -I lUN bi b ,?F li l- i1EY._.i'; FROM BOARD OF HE"L1H. B. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION OF ALL UNDERGROUND & OVERHEAD UTILITIiS PRIOR TO COMMENCEMENT OF WORK. SITE PLAN OF 426A HIGHBANK ROAD IN THE TOWN OF: (SOUTH) YARMOUTH PREPARED FOR: JOHN HENDERSON 20 0 2.0 40 60 Feet SCALE: 1 = 20' DATE: AUGUST 1, 2001 \lH/\ \ �?�IIARNF ARNE H \;y\ �I r \1 `1I \ T OJAI A � O I - k clv tin nn II No i2 g bo I ;4W. OJAI,A, P.E., P.I.S. DATE off 508-362-459 lax 508 362-91980 down cape engineering, ine. CIVIL ENGINEERS LAND SURVEYORS 939 main St. yarmouth, ma 02675