Loading...
83-1585 - Sewage Disposal SystemYarmouth, -MA Y5TEM DESIGN CALCULATIONS: DETAIL OF VENT ACCE55:BOX. CONSERVATIO N NOTES: TEST LOGS: S SOIL NOT TO SCALE � N OTE5 1:) LIMR OF WORK SHALL BE AS SHOWN. A ROW Of DOUBLE STAKED HAYBALES SHALL -- - 3BDSEWAGE DEIGN FLOW: - TESL HOLE It EL -8.0± jONt OTHER 3 BEDROOM DWl1llNG @ i 10 GPD - 330 GPD BE CONSTRUCTED ALONG THE LIMIT OP WORK UNE PRIOR TO THE COMMENCEMENT OF YS NOR PARKING ARMS ARE ALLL)\NCD OVER SFPTiC SYSI ERA ESV DIYfM FROM SOIL ��ppIIL SOIL OF ANY WORK )NEMS ARE USED.. :. SURFACE HORIZON TIXTUR`_ COLOR LING LEACHING CAPACITY REQUIRED: Finish Grade,' E TEM /tis DESIGNED UN- PNCHFSI NSDN (MUNSBJ 3 BEDROOM5-11ii .) @ 110 GPD - 330 GPD REQUIRED LL NOT BE RESPONSIBLE rORTME 5Y5 IN WRfT1NG. a . a Lowe fine nj%,th \��\\ 4• AN ROOF RUN OR FROM ADDITION N SHALL R CONTROLLED BY CLUTTERS, DOWNSPOUTS 3� A5 SHOWN. ANY CHANGES SHALL BE APPROVED Loose fine nSEPTIC TANK CAPACITY REQUIRED_ \ AND DRYWEllS OR STONE TRENCHES UNDER DRIP REVIEW T RESPONSIBLE FOR VERIFYING THE LOCATION OF ALL Loose coarsend DAILY FLOW mil- 830 Gam@ 260% - 660 GAL REQUIRED 6' PVC Sleeve with ALL BE RESfOe OVERHEAD UTILITIES PRIOR TO COMMENCEMENT OF WORK' S m I Fine nm sanilt enol screwon cap for access 9J CONTRACTOR BUILDER AND OWNER SHALL Rfl/IlBNTHE ORDER OF CONDITIONS PRIOR q ... - �- SEPTIC TANK CAPACfTY-PROVIDED_ TO AND DURING CONSTRUCTION. 500-005EPTICTARIC (MIN. ALLOWED) ' TES • TEST HOIP 2: L1-6.0± I.Souen•.on Cap ,U CTI ON N O DEPTH SOIL 501E d SOIL SOIL NG OTHER LEACHING CAPACITY PROVIDED: 4.) PROPOSED DRIVEWAY SHALL 8C CONSRUCTID OF A PERVIOUS MATERIAL s SEEN SURFACE HORJZON TFXRJR.- COLOR MOTl1J ONE (l) 30.5` X l 2.�(EACHING HELD CAN LEACH: I • PVC Access Pipe 8• Q . (U5DA) (MUNSeu Vt-(30)(I 2)0.74 GPD/5F-270.84 GPD �w ON SHALL CONFORM TO THE STATE ENVIRONMENTAL CODE. pNCHfSI NONE luestone 270 GPD<330 GPD REQUIRED - SEE VARIANCE # OUIRHvTCNTS OF THE LOCAL BOARD OP HEALTH. 4 01 E Loose fine nm sand GREASE TRAP(5). DOSING CHAMBEIJ AND DISTRIBUTION N E Loose rp rx rain sand - �_ � n NOTE: A GARBAGE DISPOSAL LS NOT PERMITTED WITH THIS DESIGN. ET ON A LEVEL STABLE BASE WHICH HAS BEEN MECHANICALLY q•- 2 m 1 NONE ne nm of w th : / LOCUS ) A 6 NCH CRUSHED STONE BASE. 314' -I -I/2' Stone Bax Ice `{S4g} INSTALL. 6 NOT TO SCALE THOLE MEET ASTM STANDARD C 1 127-93 AND SMALL DATE OF TE511ING: 1 1 /20/01 :. ON>: (1) - 1500 GAL SEPTIC TANK DIAMETER MANHOIFS. THE MINIMUM DEPTH FROM PERCOLATION RATE: LE55 THAN 2 MINANCM N 'C LAYERS• ONE (1) - 650 GALLON PUMP CHAMBER fin Material t` TANKTD THE FLOW UNE SHAH BE 48'. WITNESSED BY: IANC EVANS RM.SGf1, R.S.. BE NNETT 4 OREILLY. INC. ONE (I) 30.5' x 12.0 LEACH FIELD PARCEL 130 PIAN BOOK 47 PAGE 113 CHARI.VAN STASa AGENT. EJwPwSTAB X COUNTY MEALTH DEPT. .9 DEED BOOK 10637 PAGE 178 /C INLET AND OUTLET TEES SHALL EXTEND A MINIMUM OF 6' WATER ENCOUNTERED AT El-ol IN TH # 1 AND EL- 1.5 IN TM #2 DURING HIGH TIDE. illEGAN ASSESSORS' MAP 29 PARCEL 1 28 " NE OF THE SEPTIC TANK AND SMALL Be INSTALLED ON THE USE A LOADING RATE Of 0.74 GPD15F FOR 51ZING OF SOIL ABSORPTION SYSTEM. I • Dr trtbutwn Lateral' I B ii ON TANK DIRECTLY UNDER THE CLEANOUT MANHOLE. U51NG OBSERVED WAii R OF 15 SAGAMORE ROAD Of 9.0 LEGEND JF THE SEPTIC TANK AND DISTRIBUTION BOX WITH PRECAST ,, IGHT RISERS OVER INLET AND OUTLET TEES TO WITHIN 6.OP _ ,. :. -- .. -32 EXiSTiNG CONTOUR )ll OF 4' SCHEDULE 40 PVC OR EQUIVALENT. PIPE SMALL - - _ - / - - $2 PROPOSED CONTOUR Ill CONTINUOUS GRADE Or NOT LESS THAN I %. (� WALL DETAIL: ! �� _ + • IXISTING SPOT GRADE RES FOP SOIL ABSORPTION SYSTEM (AS REQUIRED) SMALL BE VARIANCES 1 �t-v(U ESTED : ' . PARCEL 1 3 1 2�FxS PR F05ED SPOT GRADE . )ULE 40 PVC LAID AT 0.005 FT/FT. UNE SHALL BE CAPPED NOT TO SCAM _W �. �-rz WATER SERVICE LINE ROM DISTRIBUTION BOX SHALL REMAIN LEVEL FOR AT LEAST TITLE 5 AND LOCAL 5ANTTARY REGULATION'S - - - POSED WATER SERVICE UNE - U -- OVERHEAD UTILITY SERVICE .. 3 TO SOIL ABSORPTION SYSTEM. WATER TEST DISTRIBUTION _ f-8" _ _ TO BE SLEEVED PTI 4' PVC - -U - .UNDERGROUND UTILITY SERVICE /EN Ot 01L A55ON. 310 CMR 15.21 1 - Distances: TOP OF WALL EL -9.75 AND P 110 OP SEPTIC TANK I .) Sept c Tank B not 10 from property hues AND PUMP CHAMBER -- G- GAS SERVICE UNE 10)X SHALL HAVE A MINIMUM SUMP OF G' M`E 5URE D BELOW - ` r SEE WALL NOT PARCEL 1 29 S Tp 5' P Tankided 5' Variance Requested 'QG TEST HOLE /BORING LOCATION 7. 2J septic Tank a not to from cenar von.' ' GALLAGHER 7.s p8 qMO ST ® SEPnc TANK TATE fORTHE LEACHING FACILITY SHALL CONSIST OF 3142 TO 5 Provided 5' Variance Requested i C PUMP CHAMBER EM SHED STONE FREE OF IRON. PINES AND LxJST AND SMALL BE ..3,) Sod Absorpbon System a not 10 from property 'ince � : - i ,.1 ' . - THC CROWN OF THE D15TR 11ON UNE TO THE- BOTTOM Cfi THE 3• Pro railed T Variance Requested ^ S.. song Water ED Line g� ejES ABSORPTION URE, SY571'M. BASE AGGREGATE SMALL BE COVERPD WITH A 2' q,) 3' ovdeplion System a not I a from cellr. wall (slab) - .-x - / \ TO BE REMOVED #2 . Reserve RESERVED POR FUTURE EX STING GRAVE DRIVE 1l2' DOUBLE WASHED STONE FREE OP IRON. FINES AND DUST. 5' Provided - 5' Variance Requested - .T�. 40 MIL HDPE LINER OR 'Ua UTILITY POLE N SYSTEM WHEN DISTRIBUTION LINES IXC® 50 FEET: 5.) Reserve Area n not 10 from Prof" iy line AREA WARDED TO SORPTION 3' 6 APPROVED EQUAL AREA - 730 SF± ` C' O G0 �'7 �'p'QQ ® CATCH BASIN -HER IN WHOLE OR IN PART UNDER DRIVEWAYS. PARKING AREAS. 2' Fronded 8' Requested ;: #4 RE -BAR @ 10 c.c. OTHER THOLE OR I MATERIAL: E R WHEN PRESSURe DOSED. ARE 6.) Reserve Area a not 1 a from cellar wall (slab) L (overlap eornere) �� POUR PARKING SPACES �G �� / �a FIRE HYDRANT R • 9' OF 2 Fronded 8' Variance Requested ` C I B' x 9' PROVIDED AIng PROPOSED CONCRETE TION SYSTEM SHALL HE COVERED WR11 A M,N MJM CA PROPOSED GRADE VARIX NG WALL ® WELL 7.) Water Seance Lme not 1 a from 5erl Tank #4 RE -BAR @ 18' o.c. \ / _.--��'{ O JJD(FXGLUDNGTOPSOIU• "u '/ I- •� Via•_ EL -9.75 ® DRAINAGE MANHOLE 2' Provided 8' Variance Requr�ted +:: . % e 31.83'(U X 13.33'(W) SHALL BE A MAXIMUM Of 36.OVERTHE TOP OF ALL SYSTEM CONCRETE WALL 7.4 �� 5a one / i : �. ■ CONCRETE BOUND, FOUND 1UDING THE SEPTIC TANK. D15TFJBLMON BOX. DOSING CHAMBER LOCAL - 1-^ . ' W(TM FOOTING .�` p,sHer 131'+ y \'`-.� 4��. �' 9.45 �- .TOP OF BANK mom SYSTEM.. SEPTIC TANKS SHALL HAVE A MINIMUM COVER 8.) Soil Absorpbon Systun ss not 100 from Isolated Wetland - ��---•- ` ' ~ 53' Prov dell 4T Variance Requested " �} / �� 1 -0-- UMrf OF WORK t.. } 3.57 EXISTING 3 BEDROOM DWELLING / PROPOSED PA55TVE VENT \TE Or INSTALLATION Or TME SOIL ABSORPTION SYSTEM UNTIL 9.) Reserve Area n not i Do from Isolated Weiland / R Of THE 501E A950RP- 50 Variance ted j �--� 23 TWO ro UNEs OF 4w Ell 40 TIFlCATE OF COMPLIANCE. THE 1'ERIN SUCH 50 Provided Reqs 1 TO liE RlTAQVED /Reserve / 3 n� TOPOF FIELD ILL BE STAKED AND FLAGGED TO PREVENT THE L15E Of 5 10.) Reserve Arne not 1 Oa from Top of Bank EXISTING GRADE L1-8.0± / ��el-P BE APPROVED BY OWNER) pVmES THAT MIGHT DAMAGE THE SYSTEM. 43' Variance Requested "fig % V " 9. 4 i 4 Or ALL CONSTRUCTION 405 - lnnl U rade L \ Y) -' . ' ONO CMR 15 __ Ammo � ��pp !ter PROPOSED IRE ETES 310 - -- - _,° ' ' PROPOSED 50X 10' RESERVE / � JF FIFALTH SMALL REQUIRE ''0 4 'ti�� Q / + l o.2s 2' OVERHANGS rHC BOARD Or HEALTH roll TIME DESIGNER IF THIS SYSTEM RE- _ •� - - - r ' �• �• Q" CD AND MAY REQUIRE SUCH PERSON TO CERTIFY IN WRITING 1 1.I l each Field not des gned st 100% ePac ty for 3 bedrooms 2 1'Ls ' PROPOSED DECK (J� k / J= 6.44 A5 BEEN COMPLETED IN ACCORDANCE WITH THE TERMS OF THE 82% Provided 18% Variance Requested "f OVED PLANS. 48 HOURS ADVANCE NOTICE L5 REQUESTED " 2' X 4' CONTINUOUS KEY 1 EXISTING CONCRCTE BLOCK Pato Q O o ' 1C�\, :" '1 WALL TO BE REMOVED \SOS' wO C Jf r0� cit \ AL: ALL TOPSOIL AND SUBSOIL SMALL BE FUNOVED FROM ,�.,.; #4 RE -BAR C W o.c. .r r.. fill DOWN TO THE GLEAN 11 SAND LAYER. AREA SMALL BE - . », (ovular tomos) 6 t. ry - - fill SAND AND COMPACTED TO MINIMIZE SETTLING. - - 12' + - ��.. AOQ. ` �_ t CLEAN #4 RE -BAR C 18' ox. h�+Y � � ' OR SHALL REVIEW HOUSE LOCATION AND GRADING PRIOR �d��� >rlTRACT -3I I ' 02 ` 5th \ .;, 04 JR SMALLVERIFY BUILDING SETBACKS; COMPLIANCE WITH ZONING 2 + 3.14__��%qa q&nk y� OS l , T Offal 5D OR IMPLIED MERLON. 08 )R SHALL SCHEDULE A CLEAR WATER TEST IT THE LEACH BOARD LD Of' rola, or Manh�_ s 80 ENGINEER FOR THE PUMP AND PRE55>_ 5.74 IWNG. (46 HOURS ADVANCE NOTICE REOTI'> i T HALL INSPECT AND CERTIFY THE ENTIRE SEWAGE SYSTEM - , Tw 7!, PARCEL 127 ;OMTRA.CTOR SMALL GIVE 48 HOURS ADVANCE NOTICE. SALT MARSH � .�' KACZMAREK /4.53 6.43 il, __ NOTE5: 3183' :+ .53 + 5.49 r dl 11 1 Area = 1.260 SF± SRM 44/ 10 HP PUMP OR EQUAL _ )uIR> MENrs. e' Poured Concrete Wan. Top of Wall a-9.75 NO WETLANDS ARE �� + 5.11 �' d�r. / 8.27 BENCHMARK: AMTC FiFAD NO 115 THAN i 2 POET. :.- - - nV RATE NO tE55 THAN 32 GPM. LOCATED ON7.93 L BE CAPABLE OF PASSING A 2' SCUD. Tir' LOTS 53 � 54 ' Isalared wet1 Top of Concrete Bound BER ALLOWS STORAGE CAPACITY EQUAL TO DAILY tv 1' Schell 80 PVC DretnWition Lateral (3a Long) (Tyle y EL= 4. rJ3 (PIGVD} a=10.800 SF± 30.5 GALLONS. - + 5.23 BER SHALL BE EQUIPPED WITH A HIGH WATER ALARM WITH 114' Perforat ons at 4' o.c. NAL AND AN AUDIBLE BELLWIRED TO A SEPARATE ORCUR jwf ------------- \ / --------�------------------.. 49 \ WENCY:.,. I-1/2 Schell 80 PVC Manrfold (8' Long) fT _ / SE DOSED NINE T1MCS PER DAY @ 37 GALLONS PER t)OSE.- ;r T I 1� 3.15 Boulder PARCEL 1 1 8 - N 1 � OTES : I - In• Schell eo lve Ddvuy Lxe � GOODRICH ----------- l ?-------------- - -------- t3.30 TE SHALL BE CL^5S A 4000 P51 ®28 DAYS 4.5ched 40 PVC Vent a Lona) (Typingf --- 4.99 PORTLAND CEMENT. a 00 COVER ON ALL REINFORCING 5TEEL { GO 1 HALL BE GRADE 60. iv 5 Si E, + 3 31� it CRUSHED STONE SHALL BE PLACID 13ELaw FOOTING; \ AND SUBSOIL SMALL BE REMOVED FROM FOOTING AREA. sp 4. - AND . ✓ J OP WALL SHALL BE BACKFILLED FOR 28 DAYS - . ' gEa�rr )RETE POUR O \ ' 5.02 �ri„� '�ii�'� L RE -BAR SHALL WRAP AROUND CORNERS OF WALL TO .e /U3.94 )LID CONTINUOU5UPPORT. - 30 liullfiead / HALL STAKE FOOTING LOCATION. 30.5 1.05 ::} MALL PIN FOUNDATION LOCATION ON FOOTING. \ HALL INSPECT STYE REINFORCEMENT OF Til, 98 XMNG PRIOR TO THE POURING OF CONCRETE. 30.5X 12.0X0.5' 'yEc +u3 17 HIS IS A REVISED PLAN LEACH FIELD ` _ Pl! DATE; "''_ _ rR155M DMED 1 / ISCARD ALL PRiOR PLANS W PROFILE: Pow view 1.CA '"2.cs h FLOOD ZONE: IA ' D / PLAN r0 SCALE s 51AH EL -10.00 30• DIAMETER CAST IRON FRAME AND COVERS RA15ED TO GRADE USE LEBARDN LT 104 OR APPROVED EQUAL EL- 9.8 8.0± J� IO" 14• 3. T 6 60 check 410" 53. 'GAS BAFFLE f1,m 8.75 i Mol st-a9 be installed so they can tie reached from "ani cover -12' Drk�ry Ime 6' r-Cleanat 5fied,, BO ,_(',ate vaticE C Famed Manrfo Cocrete - 114* Bleeder Mole131adong - 2TSafeyYdume Aamt ON Pump ON 'Ill OFF 8n CONCRETE RETAINING WALL Coruete Fir, 31.83X 13 33' 8' -1500 GALLON 5EPTIC TANK H-20 USE 5HOREY PRECAST 21.230 lB 1.24 /////4Use / -�• Concrete Pd'. _ 5 I ( IV 5000 atety E CTT�� 5' 6' --t to Prov de anti-bicyal wag^' - 9• Mm'- 36• Max ELEVATIONS CRITICAL Min 2' LAYER OF I /8' - 1/25 5TONE 311 I-1/2"51101 00 8" CONCRETE RETAINING WALL 31.83X 13.33' 0 Gnomdwatcr EL -3.0 SCALE I "=20 %. TH 15 AREA 15 SERVED REVISED I O/2 I rot: Moved rrorosed dvtenmg location ten feet to the south. 2 i ss + 2.80 / 13Y TOWN WATER. REVISED 09/24/02: Added wall rotes 7.8 < 9 and constriction notes 19 4 20. air / s7 1.93 f3.08 f+ 6.08 4 to + 5.21Ill �Q Ct � 1211 jm - e. 1!0. 3WZl REVISED 09/12/02: Added water line, test holes and re-des+gned sewage system• REVISED OAr 13102: Corrected Variances. REVISED 08106102: Added Vanance #7. REVISED 0&01102: Added Variance 06 and 40 mil hoer. REVISED 03115102: Changed Differ Zone, added area of isolated ,wetland and Note #4. Leonard J. Gallagher, Jr., et at, Trustees CIO McShane Construction, P.O. Box 429, 05terv)lle, MA 02655 SEWAGE D15PO5AL SYSTEM 13 5ae3amore Road, Yarmouth, MA f BENNETO'REILLY, Inc. Engineering, Environmental and Surveying 0 Servfoee 1573 Hafer Street - Route SA P.O. Hoz 1667 (608)HOS-6690 Office Prenster, HA 02631 (608)886-4687 Ya: DATE: 51Y: BY:. CHECK JOB NUMBER: 12/14/02 As Noted JER/e JMO 5001-3222 30.5X 12.01 650 GALLON PUMP CHAMBER M-20 WITH SWITCHING LEVELS USE 5HOREY PRECAST LEACH FIELD PRESSURE DOSED 6.080 LB SCALE I "=20 %. TH 15 AREA 15 SERVED REVISED I O/2 I rot: Moved rrorosed dvtenmg location ten feet to the south. 2 i ss + 2.80 / 13Y TOWN WATER. REVISED 09/24/02: Added wall rotes 7.8 < 9 and constriction notes 19 4 20. air / s7 1.93 f3.08 f+ 6.08 4 to + 5.21Ill �Q Ct � 1211 jm - e. 1!0. 3WZl REVISED 09/12/02: Added water line, test holes and re-des+gned sewage system• REVISED OAr 13102: Corrected Variances. REVISED 08106102: Added Vanance #7. REVISED 0&01102: Added Variance 06 and 40 mil hoer. REVISED 03115102: Changed Differ Zone, added area of isolated ,wetland and Note #4. Leonard J. Gallagher, Jr., et at, Trustees CIO McShane Construction, P.O. Box 429, 05terv)lle, MA 02655 SEWAGE D15PO5AL SYSTEM 13 5ae3amore Road, Yarmouth, MA f BENNETO'REILLY, Inc. Engineering, Environmental and Surveying 0 Servfoee 1573 Hafer Street - Route SA P.O. Hoz 1667 (608)HOS-6690 Office Prenster, HA 02631 (608)886-4687 Ya: DATE: 51Y: BY:. CHECK JOB NUMBER: 12/14/02 As Noted JER/e JMO 5001-3222