HomeMy WebLinkAbout83-1611'
SOLO
Lj�
(n
>d
OL13N
Omrm
CNa
=
,L z
Q O
NF-N�W
S
cmRE
3¢y
pU¢
�ZONF.
ZDi
¢o=bi
aa0
¢
LL OU
dsr5
r3
�>Z
6¢i
o3
ISJ2
Nyo
c��
oLLoic
oc.
yo
4V
�r ¢
Yid
m Emy
30
mrn
m=5m
�
Q
v
aem
ons
m -m eco
AEE$
or
IY
Z
u�az.
o0
i -o3 a.0
x iici
ar
N
t� Rpm
23
w
Locus `
e
LEMS BAY
LOCATION MAP SCALE : 1" = 2083'
9/03/02
DATE
#7 FRANKLIN STREET
EDGE OF
WATER
10,947 ± SY
FOY 18
17
NOTES:
L RESTORATION OF OPEN WATER HABITAT TO
BE DONE BY AQUATIC CONTROL TECHNOLOGY.
REFER TO LETTER REPORT TO HAMLYN
CONSULTING, DATED JULY 30, 2002.
2. ACCESS TO POND TO BE FROM 7 FRANKLIN
STREET.
3. DREDGE MATERIAL IS TO BE DEWATERED AND
REMOVED FROM SITE BY LOCAL CONTRACTOR.
4. ALL DISTURBED AREAS ARE TO BE VEGETATED
UPON COMPLETION OF THE PROJECT.
5. DATUM ASSUMED FROM USGS QUANDRANGLE.
6. ASSESSOR MAP 22 PARCELS 388.1 & 394.
PLAN OF LAND IN
WEST YARMOUTH, MASS.
PREPARED FOR
SCOTT McKENZIE .
SCALE : 1" = 20' DATE : SEPTEMBER 3, 2002
• 10 20 40 :o :•
DEMAREST—?bcLELLAN ENGINEERING
24 SCHOOL STREET P.O. BOX 463
WEST DENNIS, MASSACHUSETTS 02670
9/03/02
DATE
DM JOB
/4= 12
#7 FRANKLIN STREET
. ;:a 1 S
IDLE Or
R'
� 1fP.Tr"F�.
1 i 10,6347 ± S.F
LE0? 16
1 '
Cb I
15 �
17
13
NOTES:
L RESTORATION OF OPEN WATER HABITAT TO
BE DONE BY AQUATIC CONTROL TECHNOLOGY.
REFER TO LETTER REPORT TO HAMLYN
CONSULTING, DATED JULY 30, 2002.
2. ACCESS TO POND TO BE FROM 7 FRANKLIN
STREET.
3. DREDGE MATERIAL IS TO BE DEWATERED AND
REMOVED FROM SITE BY LOCAL CONTRACTOR.
4. ALL DISTURBED AREAS ARE TO BE VEGETATED
UPON COMPLETION OF THE PROJECT.
5. DATUM ASSUMED FROM USGS QUANDRANGLE.
6. ASSESSOR'S MAP 22 PARCELS 358.1 & 334.
!MAIN
PLAN OF LAND IN
WEST YARMOUTH, MASS.
PREPARED FOR
SCOTT McKENZIE
SCALE : 1" = 20' DATE : SEPTEMBER 3, 2002
0 10 20 40 60 80
DEMAREST-MCLELLAN ENGINEERING
24 SCHOOL STREET P.O. BOX 463
TTEST DENNIS, MASSACHUSETTS 02670