HomeMy WebLinkAbout83-1634 - Parking Lot Site Plan 2EXISTING LOT CONFIGURATION
SCALE: 1" = 150'
GALV. THRU-
BOLTS
8"X8" P.T. POSTS 6'O.C.
GUARDRAIL
TYP. ALONG
RET. WALL
NEAT CUT THRU
GEOGRID �j
SEE PAVEMENT SECTION I
DATE: 5/11/00
ENGINEER: MICHAEL S. FARIA, SE
(DOWN CAPE ENGINEERING)
WITNESS: BRUCE MURPHY, RS, CHO
EXCAVATOR: ELUS BROTHERS CONSTRUCTION
TEST HOLE LOG
NOT TO SCALE
I�
PROPOSED LOT CONFIGURATION
SCALE: 1 = 150
12"X3" CAPE COD BERM INTEGRAL WITH TOP CC
1" TOPCOAT MASS DPW
//r-- TYPE N
EXTEND GRAVEL 12 , i / 2" BINDER
BEYOND BACK EDGE
OF PAVEMENT
12" PROCESSED GRAVEL
MOPW M1.03.1 VIB. ROLLER COM
REMOVE TOP & SUBSOIL
NOTE; REMOVE ANY FROST SUSCEPTIBLE MATERIAL
TO A DEPTH OF 36" BELOW FINISHED GRADE.
REPLACE WITH NON FROST SUSCEPTIBLE MATERIAL
(LESS THAN 109" DRY WEIGHT PASSING $200 SISI
NOTE: COMPACT ALL FILL IN 6" LIFTS TO 95% M(
PROCTOR DENSITY WITH VIBRATORY ROLLER COMP
PAVEMENT CROSS I,
w PROPOSED 2:1 FILL SLOPE
COMPACT FILL TO 95% MOD. PROCTOR AND STAPLE EROSION -
24" SHOULDER CONTROL JUTE NETTING OVER 6" LOAM & HYDROSEED
1
STAKED HAYBALES
^ pROp WITH TRENCHED IN
(A �� \\ OSfO SILT FENCE (TYP.)
Szopf
z 2
(7
W
a
0
N
J
J
4
ORIGINAL GROUND
SLOPE CROSS SECTION
NOT TO SCALE
H-20 w H-20 HDPE CPP
PRECAST E 12"9 HDPE
RISER j SLOPE 1% MIN.
a 2.0' (TYP.)
REMOVE
PROPOSED ANY
H-20 UNSUITABLE
SOIL
LEACHING GALLEYS .ENCOUNTER
(IF ANY)
)6"WASHED STONE UNDERNEATH FOR
STRUCTURES �5' MIN.
.......-. .AROUND
STONE
'REPLACE 4
3/4" - 1 1/2" CLEAN SAP
WASHED STONE (TYP.)
4' MIN AROUND GALLEYS
no A I K I A t"-% C' rG
NOTES:
1. THE LOCATION OF EXISTING UNDERGROUND UTILITIES SHOWN ON THIS PLAN IS
APPROXIMATE. PRIOR TO ANY EXCAVATION ON THIS SITE. THE EXCAVATING
CONTRACTOR SHALL MAKE THE REQUIRED 72 HOUR NOTIFICATION TO DIG SAFE
EQUIPMENT IN7THE )OTHERAND ANY UTILITIES
CONSTRUCTONAREAFOR VERIFICAICH TION OAY HAVE CABLE. PIPE R
ION OF LOCATIONS.
2. ALL CONSTRUCTION MATERIALS, COMPONENTS, AND METHODS EMPLOYED ON THIS
PROJECT WORK SHALL CONFORM TO THE TOWN OF YARMOUTH SUBDIVISION REGULATIONS
AND/SPECIFICATIONS MASSACHUSETTSR THE DEPARTMENT WORKS
CATIONS FOR BRIDGESANDHIGHWAYS AS AMENDED TO PRESENT.
ALL SEPTIC WORK AND MATERIALS TO CONFORM TO 310 CMR 15.00 TITLE 5.
AND YARMOUTH HEALTH REGULATIONS.
3. VERTICAL DATUM IS NGVD29 MSL DATUM.
4. NOTE THAT CONSTRUCTION OF THE DRAINAGE SYSTEM REQUIRES REMOVAL OF
UNSUITABLE SOIL. UNSUITABLE SOIL SHALL BE REMOVED TO ITS MAXIMUM DEPTH
FROM UNDER AND WITHIN 5' OF THE PROPOSED LEACHING COMPONENTS AND REPLACED
CLEANWITH SAND
MEETING REQUIREMENTS
ENGINEER TOINSPECTSOIL CONDITIONS AND REMOVAL DURING CONSTRUCTION,
5, DESIGN LOADING FOR ALL PRECAST UNITS TO BE AASHTO-H20 UNLESS NOTED.
6. THIS PLAN IS FOR PROPOSED WORK ONLY AND IS NOT TO
BE USED FOR PROPERTY LINE STAKING.
7. 6" LOAM AND SEED ALL DISTURBED AREAS NOT PAVED, M6.03.0 SEED.
8. ALL DRAINAGE PIPING 12"0 H-20 CPP AT 1% PITCH UNLESS NOTED.
9 RAINAGE IINSPECTIONOMPONENTS BY OWNERSNOT TO ENGINEERE AND BACKFILLED WITHOUT
PERMISSION OBTAINED.
10. ALL STORMWATER RUNOFF TO BE RETAINED ON SITE.
11. LOTS TO BE COMBINED WITH 81X OR ANR PLAN PRIOR TO OCCUPANCY.
12. COORDINATE UTILITY INSTALLATIONS/REMOVALS WITH APPROPRIATE VENDORS.
13. REMOVE ALL EXISTING UTILITIES AND SEPTIC SERVING EXISTING BUILDINGS. COMPACT
CLEAN FILL IN 6" LIFTS TO 95% MODIFIED PROCTOR DENSITY.
14. PARKING LOT LIGHTING SHALL NOT CAUSE GLARE FOR MOTORISTS, PEDESTRIANS
OR NEIGHBORING PREMISES. 301.4.10 35' MAX. POLE HT., BURIED ELECTRIC SERVICE.
PARIUNG LOT SITE PLAN
OF LAND IN YARMOUTH, MA
#30,#34,#40,& #50 BAYVIEW STREET, WEST YARMOUTH, MA
PREPARED FOR
oAl CAPE COD HOSPITAL
27 PARK STREET, HYANNIS, MA 02601
1 12.0' (TYP.)
3' C.B. TRAP
1 t2"0 HOPIPE
PROPOSED
1000 GALLON PRECAST
H-20 CATCH BASIN
0X6'-8" SHOREY SOLIC
BASIN H-20 OR EQUAL
NOT TO SCALE
COMPACT ALL BACKFILL IN 6" LIM TO 95% MOD. PROCTOR DENSITY.
NOTE: 4' OF 3/4 - 1.5" DOUBLE WASHED STONE ALL AROUND BANKS OF GALLEYS.
3" PEASTONE AND MIRAFI FAPRIC OVER WASHED STONE AND DOWN SIDES.
COMPACT ALL BACKFILL IN 6" LIFTS TO 95% MOD. PROCTOR DENSITY. H-20 RATED FRAME & COVER (3) REQ.
LEACHING STRUCTURES TO BE SET IN CLEAN SAND. 3" BITUMINOUS ASPHALT CONCRETE
UNSUITABLE MATERIAL SHALL BE REMOVED FOR 5' MIN. 2" BINDER 1" TOP COURSE
AROUND OUTER EDGE OF STONE IF ENCOUNTERED,
NOTIFY ENGINEER TO INSPECT WHEN EXCAVATING. 1% MIN, / MASS DPW TYPE 11
I
24" I.D. RISER
ILT UP H-20 BRICK
R ALL COMPONENTS (TYP.)
4.0• MIN.— END VIEW
DRAINAGE CROSS
INSPECTION SCHEDULE: (BY OWNERS ENGINEER, 24 HR. NOTICE REQ.)
1. FOUNDATION & SEPTIC SOIL REMOVAL/SOIL COMPACTION
2. DRAINAGE INSTALLATION
3. COMPACTED SUBGRADE PRIOR TO GRAVEL
4. GRAVEL LAYER AFTER COMPACTION
S. BINDER COARSE PAVEMENT
6. FINISH COARSE OF PAVEMENT
7. LANDSCAPING, TRAFFIC PAINT AND FINAL CLEANUP.
DRAFTER: DAO DATE: MAY 2, 2003
CHKD BY: AHO REVISED: MAY 21, 2003
FIELD: DICE REVISED: 7-20-04 (ZBA CONDITIONS. SLOPE)
SCALE AS NOTED
MAY 2, 2003
12" PROCESSED GRAVEL
MASS DPW M1.03.1 COMPACT
TO 95% MAX. DRY DENSITY
MOD. PROCTOR
WITH VIBRATORY ROLLER.
SOIL CLASS:
I (SANDS, LOAMY SANDS)
DEPTH (in.) THI
PERC RATE:
< 2 MPI (5 MPI DESIGN)
0- 0 A
- PRESOAK:
0:00:00-0:10:00 -
GAL. < 15 MIN.)
SAND LOAM(24
10 YR 2
00 °" d ° °= o
0,00
148
14" A
BOTTOM PERC *
AT
LOAMY SAND
WATER:
AT 54"
10 YR 4 6
WELL
WELL INFO• #: MIW-29
36"
MEDIUM
ZONE: B
WATER TABLE ADJUSTMENT: 2.3' (USE .5 ADJ.)
5/4D
DATE: 5/11/00
ENGINEER: MICHAEL S. FARIA, SE
(DOWN CAPE ENGINEERING)
WITNESS: BRUCE MURPHY, RS, CHO
EXCAVATOR: ELUS BROTHERS CONSTRUCTION
TEST HOLE LOG
NOT TO SCALE
I�
PROPOSED LOT CONFIGURATION
SCALE: 1 = 150
12"X3" CAPE COD BERM INTEGRAL WITH TOP CC
1" TOPCOAT MASS DPW
//r-- TYPE N
EXTEND GRAVEL 12 , i / 2" BINDER
BEYOND BACK EDGE
OF PAVEMENT
12" PROCESSED GRAVEL
MOPW M1.03.1 VIB. ROLLER COM
REMOVE TOP & SUBSOIL
NOTE; REMOVE ANY FROST SUSCEPTIBLE MATERIAL
TO A DEPTH OF 36" BELOW FINISHED GRADE.
REPLACE WITH NON FROST SUSCEPTIBLE MATERIAL
(LESS THAN 109" DRY WEIGHT PASSING $200 SISI
NOTE: COMPACT ALL FILL IN 6" LIFTS TO 95% M(
PROCTOR DENSITY WITH VIBRATORY ROLLER COMP
PAVEMENT CROSS I,
w PROPOSED 2:1 FILL SLOPE
COMPACT FILL TO 95% MOD. PROCTOR AND STAPLE EROSION -
24" SHOULDER CONTROL JUTE NETTING OVER 6" LOAM & HYDROSEED
1
STAKED HAYBALES
^ pROp WITH TRENCHED IN
(A �� \\ OSfO SILT FENCE (TYP.)
Szopf
z 2
(7
W
a
0
N
J
J
4
ORIGINAL GROUND
SLOPE CROSS SECTION
NOT TO SCALE
H-20 w H-20 HDPE CPP
PRECAST E 12"9 HDPE
RISER j SLOPE 1% MIN.
a 2.0' (TYP.)
REMOVE
PROPOSED ANY
H-20 UNSUITABLE
SOIL
LEACHING GALLEYS .ENCOUNTER
(IF ANY)
)6"WASHED STONE UNDERNEATH FOR
STRUCTURES �5' MIN.
.......-. .AROUND
STONE
'REPLACE 4
3/4" - 1 1/2" CLEAN SAP
WASHED STONE (TYP.)
4' MIN AROUND GALLEYS
no A I K I A t"-% C' rG
NOTES:
1. THE LOCATION OF EXISTING UNDERGROUND UTILITIES SHOWN ON THIS PLAN IS
APPROXIMATE. PRIOR TO ANY EXCAVATION ON THIS SITE. THE EXCAVATING
CONTRACTOR SHALL MAKE THE REQUIRED 72 HOUR NOTIFICATION TO DIG SAFE
EQUIPMENT IN7THE )OTHERAND ANY UTILITIES
CONSTRUCTONAREAFOR VERIFICAICH TION OAY HAVE CABLE. PIPE R
ION OF LOCATIONS.
2. ALL CONSTRUCTION MATERIALS, COMPONENTS, AND METHODS EMPLOYED ON THIS
PROJECT WORK SHALL CONFORM TO THE TOWN OF YARMOUTH SUBDIVISION REGULATIONS
AND/SPECIFICATIONS MASSACHUSETTSR THE DEPARTMENT WORKS
CATIONS FOR BRIDGESANDHIGHWAYS AS AMENDED TO PRESENT.
ALL SEPTIC WORK AND MATERIALS TO CONFORM TO 310 CMR 15.00 TITLE 5.
AND YARMOUTH HEALTH REGULATIONS.
3. VERTICAL DATUM IS NGVD29 MSL DATUM.
4. NOTE THAT CONSTRUCTION OF THE DRAINAGE SYSTEM REQUIRES REMOVAL OF
UNSUITABLE SOIL. UNSUITABLE SOIL SHALL BE REMOVED TO ITS MAXIMUM DEPTH
FROM UNDER AND WITHIN 5' OF THE PROPOSED LEACHING COMPONENTS AND REPLACED
CLEANWITH SAND
MEETING REQUIREMENTS
ENGINEER TOINSPECTSOIL CONDITIONS AND REMOVAL DURING CONSTRUCTION,
5, DESIGN LOADING FOR ALL PRECAST UNITS TO BE AASHTO-H20 UNLESS NOTED.
6. THIS PLAN IS FOR PROPOSED WORK ONLY AND IS NOT TO
BE USED FOR PROPERTY LINE STAKING.
7. 6" LOAM AND SEED ALL DISTURBED AREAS NOT PAVED, M6.03.0 SEED.
8. ALL DRAINAGE PIPING 12"0 H-20 CPP AT 1% PITCH UNLESS NOTED.
9 RAINAGE IINSPECTIONOMPONENTS BY OWNERSNOT TO ENGINEERE AND BACKFILLED WITHOUT
PERMISSION OBTAINED.
10. ALL STORMWATER RUNOFF TO BE RETAINED ON SITE.
11. LOTS TO BE COMBINED WITH 81X OR ANR PLAN PRIOR TO OCCUPANCY.
12. COORDINATE UTILITY INSTALLATIONS/REMOVALS WITH APPROPRIATE VENDORS.
13. REMOVE ALL EXISTING UTILITIES AND SEPTIC SERVING EXISTING BUILDINGS. COMPACT
CLEAN FILL IN 6" LIFTS TO 95% MODIFIED PROCTOR DENSITY.
14. PARKING LOT LIGHTING SHALL NOT CAUSE GLARE FOR MOTORISTS, PEDESTRIANS
OR NEIGHBORING PREMISES. 301.4.10 35' MAX. POLE HT., BURIED ELECTRIC SERVICE.
PARIUNG LOT SITE PLAN
OF LAND IN YARMOUTH, MA
#30,#34,#40,& #50 BAYVIEW STREET, WEST YARMOUTH, MA
PREPARED FOR
oAl CAPE COD HOSPITAL
27 PARK STREET, HYANNIS, MA 02601
1 12.0' (TYP.)
3' C.B. TRAP
1 t2"0 HOPIPE
PROPOSED
1000 GALLON PRECAST
H-20 CATCH BASIN
0X6'-8" SHOREY SOLIC
BASIN H-20 OR EQUAL
NOT TO SCALE
COMPACT ALL BACKFILL IN 6" LIM TO 95% MOD. PROCTOR DENSITY.
NOTE: 4' OF 3/4 - 1.5" DOUBLE WASHED STONE ALL AROUND BANKS OF GALLEYS.
3" PEASTONE AND MIRAFI FAPRIC OVER WASHED STONE AND DOWN SIDES.
COMPACT ALL BACKFILL IN 6" LIFTS TO 95% MOD. PROCTOR DENSITY. H-20 RATED FRAME & COVER (3) REQ.
LEACHING STRUCTURES TO BE SET IN CLEAN SAND. 3" BITUMINOUS ASPHALT CONCRETE
UNSUITABLE MATERIAL SHALL BE REMOVED FOR 5' MIN. 2" BINDER 1" TOP COURSE
AROUND OUTER EDGE OF STONE IF ENCOUNTERED,
NOTIFY ENGINEER TO INSPECT WHEN EXCAVATING. 1% MIN, / MASS DPW TYPE 11
I
24" I.D. RISER
ILT UP H-20 BRICK
R ALL COMPONENTS (TYP.)
4.0• MIN.— END VIEW
DRAINAGE CROSS
INSPECTION SCHEDULE: (BY OWNERS ENGINEER, 24 HR. NOTICE REQ.)
1. FOUNDATION & SEPTIC SOIL REMOVAL/SOIL COMPACTION
2. DRAINAGE INSTALLATION
3. COMPACTED SUBGRADE PRIOR TO GRAVEL
4. GRAVEL LAYER AFTER COMPACTION
S. BINDER COARSE PAVEMENT
6. FINISH COARSE OF PAVEMENT
7. LANDSCAPING, TRAFFIC PAINT AND FINAL CLEANUP.
DRAFTER: DAO DATE: MAY 2, 2003
CHKD BY: AHO REVISED: MAY 21, 2003
FIELD: DICE REVISED: 7-20-04 (ZBA CONDITIONS. SLOPE)
SCALE AS NOTED
MAY 2, 2003
12" PROCESSED GRAVEL
MASS DPW M1.03.1 COMPACT
TO 95% MAX. DRY DENSITY
MOD. PROCTOR
WITH VIBRATORY ROLLER.
PR�10 BLOCK SPLASH PADS
AND WASHED STONE UNDER ALL
INVERTS, 8 S.F. MIN.
SECTION
SCALE: N.T.S.
NOT TO SCALE
CAPE
H wr
9c H.
ARNE H. ycw OJALA y
OJALA`4 No. 26348 do Wn cape en gin ee
No 30 92 y °FESS+°a Cl VIL ENGIN!
F 4.�¢. qH° SURVEHO
LAND SURW
1i°3 "L T
939 Main Street YAf
3' PEASi ONE &
0
", ""
FILTER FABRIC
0 o0°`b o 1-11;01
oo >
OVER STONE
O�
to O,00 O,o
&DOWN SIDES
00 °" d ° °= o
OF TRENCH
PR�10 BLOCK SPLASH PADS
AND WASHED STONE UNDER ALL
INVERTS, 8 S.F. MIN.
SECTION
SCALE: N.T.S.
NOT TO SCALE
CAPE
H wr
9c H.
ARNE H. ycw OJALA y
OJALA`4 No. 26348 do Wn cape en gin ee
No 30 92 y °FESS+°a Cl VIL ENGIN!
F 4.�¢. qH° SURVEHO
LAND SURW
1i°3 "L T
939 Main Street YAf