Loading...
HomeMy WebLinkAbout83-1652 - Topographic Plan - Boathouse Additionsi { i J i G i y k i <or 7-�L ufyyl 1. PLAN REFERENCE: LCP 4075 J, LOT 75 2. ELEVATIONS REFER TO NGVD OF 1929, FOR BENCHMARK USE THE DRILL HOLE IN THE BOULDER SHOWN ON THE PLAN. 3. LOCUS: YARMOUTH ASSESSORS' MAP 5, PARCEL 20 4. THE SITE IS INFLUENCED BY THE FEMA COASTAL FLOOD ZONE Al2 WITH BASE FLOOD ELEVATION a 11 5. LOT AREA . 2.24 AC. 6. ZONING DISTRICT R-87 W/ DIMENSIONAL REQUIREMENTS AS SPECIFIED IN THE CLUSTER DEVELOPMENT SPECIAL PERMIT 7. FRONT, SIDE, AND REAR LOT LINE SETBACKS ARE 25 FT., 12 FT. & 20 FT. RESPECTIVELY. /DI t �P/Q^Q 0x -o ELY/ST- A04/Tn Gorr ter/ I LnC.4 T/['N l:i { b/2,0 [/EL LEIO A2f.4 ir. 2c 3c 9c So bo Z TO UNCLE R0CfA7--S• d VE { "jc/ , f_G j • ; . or r, F r n 5g /c R 1 ,er L 07- -71 ,�_.� •: a�� r'',4�{ s�� hyo ! ���? v �� s•' 'i ! / F fYr Ly I r" {t !L. oS ..fix � - _ fir - 23 CONSERVATION NOTES % T 7:T 24 h'G. 1. CONSTRUCTION ACCESS SHALL BE PRIMARILY BY THE ACCESS ROUTE SHOWN. ALTERNATE ACCESS MAY BE VIA UNCLE ROBERTS COVE. 2. A SILT FENCE SHALL BE EXTABLI5HED ALONG THE WORK LIMIT WHERE SHOWN PRIOR TO COMMENCING WORK ON THE BUILDING. 3. EXCAVATION SHALL OF LIMITED TO THAT NECESSARY FOR POST AND FOUNDATION COMPONENT INSTALLATION. 4. ALL HARDWARE USED FOR CONSTRUCTION SHALL BE OF HOT DIP GALVANIZED STEEL OR EQUAL 5. ALL TIMBER USED FOR THE BOAT HOUSE SUBSTRUCTURE no/ SHALL BE CONSTRUCTION GRADE; YELLOW PINE, PRESSURE - TREATED FOR MARINE USE; THE TREATED LUMBER SHALL BE n IN A "DRY -PRESERVATIVE" CONDITION WITH NO n PRESERVATIVE RESIDUE PRESENT: 6. ALL FOUNDATION COMPONENTS SHALL BE BOLTED OR OTHERWISE CLIPPED TO THE FRAMED STRUCTURE TO PREVENT MOVEMENT DUE TO BUOYANCY: CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE PROVISIONS OF THE MASS. STATE BUILDING CODE, LATEST REVISION, SECTION 3107. (FLOOD RESISTANT CONSTRUCTION). SEE BUILDING PLANS PREPARED BY THE ARCHTECT, MALCOLM KENT. 7. CONSTRUCTION MATERIALS AND DEBRIS SHALL NOT BE STORED OR DISCARDED ON THE BEACH OR SALT MARSH. THE AREA SHALL BE COMPLETELY CLEARED OF ANY RELATED DEBRIS AT REGULAR INTERVALS TO PREVENT FLOOD TIDES FROM IMPACTING DEBRIS 8. REFER TO ANY ORDER OF CONDITIONS ISSUED FOR THIS PROJECT BY THE YARMOUTH CONSERVATION COMMISSION FOR CONSTRUCTION SCHEDULE AND ADDITIONAL GUIDELINES. TOPOGRAPHIC PLAN SHOWING PROPOSED RECONSTRUCTION AND ADDITION TO AN EXISTING BOATHOUSE LOT 759 UNCLE ROBERTS ROAD 2EAT ISLAND, WEST YARMOUTH, MA ASSESSORS' MAP 5, PARCEL 20 003 SCALE —1 IN. - 20 FT. PREPARED BY CAPE COD ENGLVEERING, INC -ROBERT bt PERRY, PEI 50 LELAN'D RD. BREW'STER, MA 02631 508-896-4861