Loading...
HomeMy WebLinkAbout83-1663 - Bulkhead Renovations PlanIIT N7- -0 !' L /E /3„N LENGTH � 1 f r/ T. G•O. G. �P��r" 4" J M Vitt rL ,�L fJ S'T/�. 9900 lL k � 1 FX/ S T. E'U! /;'ffFri [u '•^f/ SCHEDULED FOR TIMES OF LOW TIDE. MINIMIZE SEAWARD 1 GENERAL NOTES ENCROACHMENT AS ML'CII AS POSSIBLE DURING THE FXi1 i two,^•O _S h/E Tir,G 0 Sc A?r E� fl�,:.i ALL TIMBER USED FOR THE HORIZONTAL STRUCTURAL MEMBERS SHALL BF PRESSURE TREATED WITH CCQ ( f F. / S T/f+f U we ^ v lvsi G E!C Cr / . sF c r, _ ti s OR NON — LEACHING COMPOSITE MATERIALS AS APPROVED BY', 1. ELEVATIONS REFER TO NGVD, 1929. DEPTHS OF WATER AT DE ,-% raf _ F • 6. HARDWARE SHALL BE NON -CORROSIVE METAL HOT DIP --�-- MEAN LOW TIDE ARE SHOWN AS NEGATIVE VALUES. J 7. I Lr',/? ACCESS TO THE WORK SITE SHALL BE VIA THE PAVED 8. BACK FILL THE VOID BETWEEN THE TWO WALL FACES WITH PORTIONS OF THE SITE AND VIA THE RIVER -F- 1 ADJUSTMENTS TO THE EXISTING PIERS AND OTHER FEATURES ` —2-`7 L- PcO/�G'SFu i 1 o ;V t Ems= -3 f<IF7' 6 . 9 r y ROPOSAL FX/ S T. E'U! /;'ffFri [u '•^f/ SCHEDULED FOR TIMES OF LOW TIDE. MINIMIZE SEAWARD 1 GENERAL NOTES ENCROACHMENT AS ML'CII AS POSSIBLE DURING THE FXi1 i two,^•O _S h/E Tir,G 0 Sc A?r E� fl�,:.i ALL TIMBER USED FOR THE HORIZONTAL STRUCTURAL MEMBERS SHALL BF PRESSURE TREATED WITH CCQ ( PRFSFRVATIVY FOR MARINE APPLICATION OR EQUAL. 6 y OR NON — LEACHING COMPOSITE MATERIALS AS APPROVED BY', 1. ELEVATIONS REFER TO NGVD, 1929. DEPTHS OF WATER AT DE ,-% raf _ F • 6. HARDWARE SHALL BE NON -CORROSIVE METAL HOT DIP MEAN LOW TIDE ARE SHOWN AS NEGATIVE VALUES. J 7. I 2. ACCESS TO THE WORK SITE SHALL BE VIA THE PAVED 8. BACK FILL THE VOID BETWEEN THE TWO WALL FACES WITH PORTIONS OF THE SITE AND VIA THE RIVER 9. ADJUSTMENTS TO THE EXISTING PIERS AND OTHER FEATURES ` 3. SHEET PILING SHALL BE -C-LOC", CRANE MATERIALS J FOR WORK ACCESS SHALL, BE AS DIRECTED BY TIIE OWNER 10. NO LAYOUT CHANGES TO THE BOATYARD FACILITY ARE PART INTERNATIONAL (CMI) OR EQUAL VIN1T. SHEET PILE WITH A MINIMUM SECTION DEPTH OF 9 INCHES, MINIMUM PANEL WIDTH OF 24 INCHES OR AS APPROVED BY THE OWNER'S LLrvET EYTF/`/T i / ENGINEER 4. SHEET PILE INSTALLATION SHALL BE IN CENERAL S + 8 _ !Ac— S SFE T/'�'i O.0 ACCORDANCE WITH THE TYPICAL PROFILE. WORK SHOULD BE ROPOSAL FX/ S T. E'U! /;'ffFri [u '•^f/ SCHEDULED FOR TIMES OF LOW TIDE. MINIMIZE SEAWARD 1 ENCROACHMENT AS ML'CII AS POSSIBLE DURING THE CONSTRUCTION. 0 Sc A?r E� S. ALL TIMBER USED FOR THE HORIZONTAL STRUCTURAL MEMBERS SHALL BF PRESSURE TREATED WITH CCQ PRFSFRVATIVY FOR MARINE APPLICATION OR EQUAL. STRUCTURAL COMPONENTS MAY BE COMPRISED OF ALLOYS'. OR NON — LEACHING COMPOSITE MATERIALS AS APPROVED BY', THE OWNER'S ENGINEER- NGINEER6. 6. HARDWARE SHALL BE NON -CORROSIVE METAL HOT DIP GALVANIZED STEEL OR EQUAL'.. J 7. VIN -YL SHEETS SHALL BE VIBRATED AND JETTED INTO POSITION. 8. BACK FILL THE VOID BETWEEN THE TWO WALL FACES WITH CLEAN, MEDIL'NI GRANULAR SAND. 9. ADJUSTMENTS TO THE EXISTING PIERS AND OTHER FEATURES ` SUCH AS REMOVAL AND REPLACEMENT OF DECK SECTIONS J FOR WORK ACCESS SHALL, BE AS DIRECTED BY TIIE OWNER 10. NO LAYOUT CHANGES TO THE BOATYARD FACILITY ARE PART ' p i OF TIIF. P O r^ ' � FLE Lr9 r, .'N GF/rCN,yoA?k 11.6 0 I �,E/2� /NGT Sh'ownf F'.'z cL,a,�,ry I.A 1� 4 /J 4 'A D � q yo wnrF2 F2 -NT PL EJn/ b SGF�/ F PLAN SHOWING 'ROPOSED RENOVATIONS TO AN EXISTING MARINE BULKHEAD IN Yarmoeth C_onservation- Cemmi BASS RIVER AT APR 3 0 2004 SHIP SHOPS, INC. SAILING VILLAGE WAY, SOUTH YARNIpI1 11 AIAr j9Ptk JANUARY 12, 2004 ���� -�►$ y0 � PREPARED BY 311 51---1 4 CAPE COD ENGLVEERL%-Q INC /1 I/ 1 C wEn' S0 LE:LAND RD. BREW'STER, MA 02631 508496-4861 ..._.__ .—� stiff rS _ — ._.�—.�..r...............m....�....,."....,.....,_—....._-....,a_,...�.-._........-.,