Loading...
HomeMy WebLinkAbout83-1677 - Septic DesignQ BVW 3 ✓ �'" BVW 4 6.5 NqZ o 8.3 ZCiAE8����"`�\ �\ LOT 211 215 1 E i __ kq AL 130 - DEPTH HORIZ TEXTURE COLOR MOTT. OTHER 0-3 0 ORGANIC 10YR2/2 NO FRIABLE 3-10 A LOAMY SAND 10YR4/1 20 FT. MINIMUM FROM CELLAR CLEAN 10-25 B TOP OF FOUNDATION C 25-120 10 F7. MINIMUM FROM SLAB OR CRAWL SPACE MEDIUM SAND 2.5Y7/4 t� LP'► DESIGN CALCULATIONS D Eby i 21.10 10 FL MINIMUM GRAVEL .SAND GJ V NUMBER OF BEDROOMS 4- CONCRETE COVERS LOAM AND SEED GARBAGE DISPOSAL UNIT -�"0-- 4' SCHEDULE 40 PVC PIPE - TOTAL ESTIMATED FLOW ( 110 GAL"/BR./DAY X BR.) _444_ GAL./DAY T-- MIN. PITCH 1/8' PER FT, 2" LAYER /2 1/$" TO 1/2 ' REQUIRED SEPTIC TANK CAPACITY _E80_ GAL 1500 GAL MAX " WASHED STONE 20.25 MAX. ACTUAL SIZE OF SEPTIC TANK � 4" CAST IRON PIPE M " A 18,00 MM.NOTTREQUIRED SOIL CLASSIFICATION DESIGN PERCOLATION RATE --1-- < `3__ MIN./IN. 3.50(OR EQUAL) MINIMUM Z EFFLUENT LOADING RATE _D Z% GAL/DAY/S.F. 90p O" PITCH 1/4" PER FL' PIT � LEACHING AREA 1503.00 SO. FT. ° (12X35)+(47X2X2 LEACHING CAPACITY ?AREA X RATE) 449,22 GAL./DAY SLAB ELEV. 12.10 FLOW LINE 17.25 ❑D❑0❑O❑o0C1D 10" _ QO8.00 X 0.74 RESERVE LEACHING CAPACITY 44� 92 GAL./DAY ELEV. 17.80 ------ _ �M1N. ELEV = 18.93 LEVEL o 0 e ° 0 CIO ❑ ❑ t7 d ❑ ❑ ❑ ELEV." _ 17.18 ELEV. = 18_91 6�L]SUMP -ELEV,= 18.74 0 o 0 0 0 0 M 0 0 M O Cl 0 o 2'0 0 I BAFFLE DISTRIBUTION IlB1U ELEV. _ ° ° ° ❑0000000000 ° ° ° 74.50 LIQUID OUTLET BOX °° ° ELEV. = TEE (TO BE PLACED ON FIRM BASE) TO BE WATER TESTED 3 - 500 GALLON GALLEYS WIT HWELL = 6.8 4 FP EET 5 FEET 14 INCHES 14 INCHES c r IF MORE THAN ONE OUTLET `��� GALLON STONE IN AN 12' X 35' X 2' TRENCH FORMATION i ZONE INDEX • 6.5 j 6 FEET 7 FEET 24 INCHES 19 INCHES (TO BE PLACED ON FIRM BASE) SEPTIC TANK ADJUST 1 I 8 FEET j/4 TO 1 1/2' CLEAN R SOIL ABSORPTION 3D DOUBLE WASHED STONE SILT �!i SYSTEM STEM SAP) FREE OF FINES & - QO J FIL SEVIAGS DISPOSAL SYSTEM PROE OBSERVED WATERUSGS WATER / BL) ELEV. _ ` (V NOT TO SCALEE{ BOTTOM OF TEST HOLE ELEV. _ _S12Q 0 NOTES: - . f.. Q4 SOIL TEST 1. ALL WORKMANSHIP AND MATERIALS SHALL CONFORM 70 D.E.P, • C9 DATE OF SOIL .L1_4�$ _2RP4_� TITLE 5 AND THE TOWN'S RULES AND REGULATIONS FOR 7.0 SOIL TEST DONE BY SWTSER EN�IEjpgG BYFI�A�€RZY 2. THE SUBSURFACE DISPOSAL 0E SEWAGE. ALL COVERS TO SANITARY UNITS SHALL BE BROUGHT TO \� V BVW 5 WITNESSED HCH 1 ELEV.= 19.20 WITHIN 6" OF FINISHED GRADE. OF THE SANITARY SYSTEM SHALL BE CAPABLE 0, E Q 09S�VAMON 3. ALL COMPONENTS ' \? - --7A. PERCOLATION RATE ___:5_2 MIN./INCH IN C HORIZON WITHSTANDING H-10 LOADING UNLESS THEY ARE UNDER OR WITHIN NG cUAl I BE Q BVW 3 ✓ �'" BVW 4 6.5 NqZ o 8.3 ZCiAE8����"`�\ �\ LOT 211 215 1 E i __ kq AL 130 - DEPTH HORIZ TEXTURE COLOR MOTT. OTHER 0-3 0 ORGANIC 10YR2/2 NO FRIABLE 3-10 A LOAMY SAND 10YR4/1 B LOAMY SAND 10-25 B LOAMY SAND 10YR4/6 25-120 C 25-120 C MEDIUM SAND 2.5Y7/4 POCKETS OF 10 FT. OF DRIVES OR PARKING AREAS. H-20 LOADI USED UNDER OR WITHIN 10 FT. OF DRIVES OR PARKING AREAS. 4. ANY MASONARY UNITS USED TO BRING COVERS TO GRADE SHALL ' BE MORTARED IN PLACE. S. NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE WITH DEEDED OR ZONING REGULATIONS. OWNER / APPLICANT IS TO OBTAIN SUCH DETERMINATION FROM APPROPRIATE AUTHORITY. 6. UTILITIES SHOWN ARE APPROXIMATE ONLY, EXCAVATION CONTRACTOR IS TO CALL "DIG -SAFE' AT 1-888-344-7233 AT LEAST 72 HOURS PRIOR TO COMMENCING WORK ON SITE. 7. CONTRACTOR IS TO VERIFY GRADES AND ELEVATIONS AS WELL AS SITE CONDITIONS PRIOR TO COMMENCING WORK ON SITE. ANY VARIATION IS TO BE BROUGHT TO THE ATTENTION OF THE DESIGN ENGINEER IMMEDIATELY. _ C __• _ S. PARCEL IS IN --FLOOD .ZONES ABEL 10)._ @, 9. LOT IS Sta^ e: ': ASSESSORS MAP -_ AS PARCEL 10. EXISTING Si CCTURES, SEPTICS, AND UTILITIES ARE TO BE _ RE?JOVED FROM THE SITE 18'6 NO WATER ENCOUNTERED AT 19n* ELEV. - a 20 11. ALL UTILITIES ARE TO BE REPLACED WITH NEW SERVICES. • 18.9 \ f 12. ORVEW'AY IS TO BE: NEW AND CONSTRUCTED OF STONE. 13. ALL DISTURE'D AR -AS ARE TO BE REVEGETATED. MS MATIM H(YX Z ELEV.= 20.30 14, THE HA.YBALE WORKUM T IS TO BE INSTALLED PRIOR TO COMMENCING x 18.7 Q \ \. - - _ PERCOLATION RATE < 2 MIN./INCH AT 63 INCHES ANY WORK ON SITE. \' .0 \ • 19.6 j- � \ 20.7 '21.5 ✓ Qp \ \ / \ PaRQ4 DEPTH HORIZ TEXTURE COLOR MOTT. OTHER 0-8 A LOAMY SAND 10YR2/1 NO 8-25 B LOAMY SAND 10YR4/6 25-120 C MEDIUM SAND 2.5Y7/8 POCKETS OF GRAVEL N �i APPROVED: BOARD OF HEALTH NO WATER ENCOUNTERED AT _120*_ ELEV. 10.10 '- -�\ �� `~< ��•- DATE AGENT moo_ PROPOSED 5EP'NIC DEBIO'�T r • I% �E �//`Vo ry FOR20.4,SOIL o• -AAA ROUTE 28 1500 GALLON E. AIN TEST RESR B.CP SCIAtEWI SAS SEPTIC TANK TF vb a SOIL � } 16 ` L� ,'TSjj CgSi.a. TEST 1 , r LOC. o 00 5 4 -` *o , �s r LA/CV�7 y yrrt MYSIss. 0 3 a o�000 S9vi7�t�^a { i 1®lJs�. 9 p o 5 ao't L'. m cs f z i z 7417 235 GREAT WESTERN ROAD z 508- P. O. BOX 713 a = SOUTH DENNIS, MASS. 02660 / ' LEGEND: � � 398-3922 NAIL /lV TREE � EXISTING SPOT ELEVATION 00x0. RSE EX'S'1NG CONTOUR ----00---- SOM SCALE - - FI�SL SPOT ELEVATION o DATE JULY .12, 2004 1" 20' ♦ AL CONTOUR UO ELE/Iv/A TION 21.91 F N.+j V.L. SC'L EST LOCATION TOWN WA 2004 UTILITY OLETER =WSW REV. JOB h0. C' 1� AUG. 9, CATCH BASIN GAS LINE , SET i OF CLEAN OUT REV. r CESSPOOL C.P.Q LOCATION MAP .�CXE I C: S8 PROJ 5891-00\DWG 5891-SAS.DWG 02004 S\^T:ETSER ENGNEE' NG