Loading...
83-1684iz 400 kP6171P / ? zvleg ,P(p,4,nq f f (qWY &Ui i /i 14 f FZ �Y f a� f f (qWY &Ui i /i 14 f • 10.18 10.23 AD LEGEND: EXISTING SPOT ELEVATION *0.0 EXISTING CONTOUR----00---- FINAL SPOT ELEVATION FINAL CONTOUR 0 1P SOIL TEST LOCATION UTILITY POLE 7)� TOWN WATER ®W-- ---W- CATCH BASIN "❑� GAS LINE G CESSPOOL CP CLEANOUT TOP OF FOUNDATION ELEV. _ 22A0 _- SLAB ELEV. = 10 FT. MINIMUM 4" CAST IRON PIPE (OR EQUAL) MINIMUM PITCH 1/4" PER FT. ELEV. = 18.33 ELEV. _ _A10_ SLAB OR CRAWL SPACE CONCRETE COVERS 4" SCHEDULE 40 PVC PIPE MIN, PITCH 1/8" PER FT, V-ELEV. _ _17.65_/1'11 LEVOEL BAFFLE VV ELEV. _ _iL75_J6" SUMP ELEV. DISTRIBUTION ELEV. _ (TO BE PLACED ON 11 FIRM BASE) BOX _lZ5$ J TO BE WATER TESTED 1500T7 GALLON IF MORE THAN ONE OUTLET SEP 1 �C TANK (TO BE PLACED ON FIRM BASE) 3/4" TO 1 1/2" CLEAN J DOUBLE WASHED STONE FREE OF FINES & SILT SEWAGE DISPOSAL SYSTi M PROFlLE NOT TO SCALE' CLEAN SAND PORT \M AND SEED C 2" LAYER OF \t/8" TO 1/2" WASHED STONE 18.63 MIN. NOTREQUIRED ELEV. = 16.75 z 6 HIGH CAPACITY INFILTRATORS WITH STONE IN AN < 11' X 48' X 10' TRENCH FORMATION .. .10 SOIL ABSORPTION WELL s' ZONE SYSTEM (SAS) _ INDEX _ n ADJUST USGS PROBABLE WATER TABLE ELEV. = 12.65_ OBSERVED WATER TABLE (12/16/02) ELEV. = 1L�5 BOTTOM OF TEST HOLE ELEV. - SOIL TEST DATE OF SOIL TEST QEC�M$QR 16��Q0� SOIL TEST DONE BY EA_QLE_$QaR lY1 a__ WITNESSED BY _A._YQN _I NE OSSERVATM HOLE i ELEV.=_14.25 OBSERVATION HOLE 2 ELEV. PERCO'_AT,ON ZATE __>3 _ MIN./INCH AT 28 INCHES PERCOLATION RATE __>__3__ MIN./INCH IN C HORIZON DE°Tr. I -CR TEXTURE COLOR MOTT. OTHER 0-• i C FIBRIC FIBRIC NO NO 4-11 C LOAMY SAND 10YR3/3 10YR3/3 11-20 B LOAMY SAND 10YR4/6 10YR4/6 0-120 Cl LOAMY 10YR5/8 10YR5/8 RESERVE LEACHING CAPACITY MIR GAL./DAY NOTES: MEDIUV SAND MEDIUM SAND ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO D.E.P. REV- APR. 22,2005 WATER ENCOUNTERED AT _3C%_ ELEV. = __11 95 DEPTH HORIZ TEXTURE COLOR MOTT. OTHER 0-2 0 FIBRIC ( 110 GAL/BR./DAY X 4 BR.) _440_ GAL./DAY NO REQUIRED SEPTIC TANK CAPACITY _B$Q_ GAL. 2-16 A LOAMY SAND 10YR3/3 DESIGN PERCOLATION RATE Ste`__ MIN./IN, 16-24 B LOAMY SAND 10YR4/6 (1,X46)+(59X2X10/12) 4-120 Cl LOAMY 10YR5/8 RESERVE LEACHING CAPACITY MIR GAL./DAY NOTES: MEDIUM SAND ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO D.E.P. REV- APR. 22,2005 TITLE 5 AND THE TOWN'S RULES AND REGULATIONS FOR WATER ENCOUNTERED AT __Aj"__ ELEV. = __10.24_ • 2( 17.98 i A 71.0 0 7Do \ \\ \\ oD 14 4 \\ LOT 1 \\ \\ \\ /��`� r� N pg C I \ \ 8.40 / I \• \LIMIT OF "� \ \� • �; \ 44,195 S.F. \ / I �. 5' OVERDIG 1 \ ,. \ • 5.33 \ \ \\ \ ti I • n� \\ I SOIL \ �Sy (• - \ I _ TEST 1 _ __ \ \ D _ �� 18.64 II tt, OF 4A \ 16 \R11F 770 - • 12.71 � 1 __• / _- -_ !b, G C 1 • \ I ig \\ - _ / 21.03 �7 /f U ouMns \ - e \ \ 1 w \ / "~PPROVED: BOARD OF HEALTH /5.20► \• � \ 1 � t j 15.17 t _ \V 1 DATE AGENT 11.34 ` 72 �\ �\10.17 11.58 �1o.sz 10.61 �11.99 j 0.61 O 1t7 i i.�] SOIL \ TEST 2 / / / 11 1 1\ it t \ r^ J \ e;q.52 a --- f\ ��2 p DESIGN CALCULATIONS NUMBER OF BEDROOMS _ 4 _ GARBAGE DISPOSAL UNIT TOTAL ESTIMATED FLOW PROJECT LOCATION TOT 29 159 CENTER STL..,J LOT ( 110 GAL/BR./DAY X 4 BR.) _440_ GAL./DAY REQUIRED SEPTIC TANK CAPACITY _B$Q_ GAL. ACTUAL SIZE OF SEPTIC TANK 1500 GAL. SOIL CLASSIFICATION DESIGN PERCOLATION RATE Ste`__ MIN./IN, EFFLUENT LOADING RATE QIP_ GAL./DAY/S.F. SCALE 1 " = 20' LEACHING AREA 828 33 SQ. FT. (1,X46)+(59X2X10/12) REV. JUNE 28, 2005 LEACHING CAPACITY (AREA X RATE) M3a GAL./DAY JOB NO. 55892-02 626.33 X 0.74 RESERVE LEACHING CAPACITY MIR GAL./DAY NOTES: 1. ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO D.E.P. REV- APR. 22,2005 TITLE 5 AND THE TOWN'S RULES AND REGULATIONS FOR REV. OCT. 13, 2004 THE SUBSURFACE DISPOSAL OF SEWAGE. 2. ALL COVERS TO SANITARY UNITS SHALL BE BROUGHT TO WITHIN 6" OF FINISHED GRADE. 3. ALL COMPONENTS OF THE SANITARY SYSTEM SHALL BE CAPABLE OF WITHSTANDING H-10 LOADING UNLESS THEY ARE UNDER OR WITHIN 10 FT. OF DRIVES OR PARKING AREAS. H-20 LOADING SHALL BE USED UNDER OR WITHIN 10 FT. OF DRIVES OR PARKING AREAS. 4. ANY MASONRY UNITS USED TO BRING COVERS TO GRADE SHALL BE MORTARED IN PLACE. 5. NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE WITH DEEDED OR ZONING REGULATIONS. OWNER / APPLICANT IS TO OBTAIN SUCH DETERMINATION FROM APPROPRIATE AUTHORITY. 6. UTILITIES SHOWN ARE APPROXIMATE ONLY, EXCAVATION CONTRACTOR IS TO CALL "DIG -SAFE" AT 1-888-344-7233 AT LEAST 72 HOURS PRIOR TO COMMENCING WORK ON SITE. 7. CONTRACTOR IS TO VERIFY GRADES AND ELEVATIONS AS WELL AS SITE CONDITIONS PRIOR TO COMMENCING WORK ON SITE. ANY VARIATION IS TO BE BROUGHT TO THE ATTENTION OF THE DESIGN ENGINEER IMMEDIATELY. 8. PARCEL IS IN FLOOD ZONE 9___ 9. __9_140 LOT IS SHOWN ON ASSESSORS MAP __ AS PARCEL 10. ALL UNSUITABLE MATERIAL SHALL BE REMOVED FROM UNDER AND FOR A MINIMUM OF 5' AROUND SOIL ABSORPTION SYSTEM AND BE REPLACED WITH SAND AS SPECIFIED IN 310 CMR 15.255:(3). 11. A NEGATIVE GRADE OF 3/4" PER FOOT SHALL BE MAINTAINED FOR A MINIMUM OF 15' AWAY FROM THE FOUNDATION. 12. A VARIANCE OF 0.61' IS REQUIRED BECAUSE THE TOP OF FOUNDATION IS LESS THAN 2' ABOVE HIGH POINT IN ROAD. 13. GUTTERS, DOWNSPOUTS, AND DRYWELLS REQUIRED. 14. ALL DISTURBED AREAS ARE TO BE REVEGETATED. 15. HAYBALE AND SILTFENCE WORKLIMITS ARE TO BE IN PLACE PRIOR TO r ANY EXCAVATION COMMENCING ON SITE. • 2( 17.98 i A 71.0 0 7Do \ \\ \\ oD 14 4 \\ LOT 1 \\ \\ \\ /��`� r� N pg C I \ \ 8.40 / I \• \LIMIT OF "� \ \� • �; \ 44,195 S.F. \ / I �. 5' OVERDIG 1 \ ,. \ • 5.33 \ \ \\ \ ti I • n� \\ I SOIL \ �Sy (• - \ I _ TEST 1 _ __ \ \ D _ �� 18.64 II tt, OF 4A \ 16 \R11F 770 - • 12.71 � 1 __• / _- -_ !b, G C 1 • \ I ig \\ - _ / 21.03 �7 /f U ouMns \ - e \ \ 1 w \ / "~PPROVED: BOARD OF HEALTH /5.20► \• � \ 1 � t j 15.17 t _ \V 1 DATE AGENT 11.34 ` 72 �\ �\10.17 11.58 �1o.sz 10.61 �11.99 j 0.61 O 1t7 i i.�] SOIL \ TEST 2 / / / 11 1 1\ it t \ r^ J \ e;q.52 a --- f\ ��2 p HOMER'S DOCK vs �� " Z m qac tiT PROPOSED SEPTIC DESIGN FOR r}�TT DUBLIN CONLSTR CTION PROJECT LOCATION TOT 29 159 CENTER STL..,J LOT SI1°=ER ENGINEERING 235 GREAT WESTERN ROAD 508- P. 0. BOX 713 398-3922 SOUTH DENNIS, MASS. 02660 °ATE FEB. 6, 2004 REv. JAN. 5, 2006 SCALE 1 " = 20' REV. JUNE 28, 2005 RE v- AUG. 27, 2004 JOB NO. 55892-02 REV- APR. 22,2005 LOCATION MAP REV. OCT. 13, 2004 SHEET .1 OF 1� C.• 02004 SWEETSER ENGINEERING NTE - .moo_ TOP OF FOUNDATION ELEV. =� _- SLAB ELEV. = 14_5-0- _ 10 FT. MINIM 4" CAST IRON PIPE (OR EQUAL) MINIMUM PITCH 1/4" PER FT. -ELEV. 18_35 ELEV. a 18.10 FROM CELLAR AS OR CRAWL SPACE 4" SCHEDULE 40 PVC PIPE MIN. PITCH 1/8" PER FT. LINE -THIN. 2 ELEV. _ _1�•_ LE BAFFLE ELEV. = 17.75_ 6' SUMP ELEV. = 17.59_ DISTRIBUTION ELEV. _ BOX _iz5&__J CLEAN SAND INSPECTION PORT LOAM AND SEED 2" LAYER OF 1/8" TO 1/2" OS MAX WASHED STONE VENT 18.83 MIN. NOT REQUIRED z 18.08 o=: 010 ELEV. = 18.75 g HIGH CAPACITY INFILTRATORS AN / \ WITH STONE 1N (TO BE PLACED ON FIRM BASE) CH a 4.10 4 FEET 14 INCHES TO BE WATER TESTED 11' X 48' X 10� TRENCH FORMATION .. / 5 FEET 19 INCHES IF MORE THAN ONE OUTLET z / 6 FEET 24 INCHES 1500 GALLON � WELL SOW 252 / 7 FEET 29 INCHES (TO BE PLACED ON FIRM BASE) SOIL ABSORPTION / LO 8 FEET 34 INCHES SEPTIC TANK ZONE A 3/4" TO 1 1/2" CLEAN INDEX 47.3 50,329 // ??B g? DOUBLE WASHED STONE SYSTEM (SAS) v ADJUST 14 / I / FREE OF FINES do SILT USGS PROBABLE WATER TABLE ELEV. = o/ / SEWAGE DISPOSAL SYSTEM PROFILE OBSERVED WATER TABLE (12/16/02) ELEV. = E _11-25 / I plOo NOT TO SCALE BOTTOM OF TEST HOLE ELEV. a 3.21 41 DR L N k0 I I I v I I WAL UTS SEE RESTORATION PLAN 1 DECK I p�COg4I \ I FILED HEREWITHI BUT SEPERATE F lgN�Yr \ - rD PROPOSED DWELL) / i II 8e?y• 1 c� UNDER CO STTRUC I i I 4.2 pp rye / I II I I I Q �S D. BOX i/ 1 1 I o I � 04 / it l j 54.75' 1 19.04 m \ [ I 1 I ` � I \\ I DR OVERDIc / 1 / N 16 • 30 14.39. / \-'jlsS. � � A c'KI f� 0' \SOIL 0 \ \ y d U Jr'•' • TENT 2 \ 17.27 W +• A A \ D r I 4 14.30 13.9. \ I ,595 1 l 19.78 rr 1 0 \ • \ I \ 2 cl) co •10.25 \ \�\\ + \\ I` \ • 18.78 Lt rr\ or'r�y� D. BO� r A \ SOIL V A 4 r rr y a TEST 1 1 (� 14.25 \ \ \ 4 / 78. do / 1 V OOP �v v V v A I' r lk 17.98 71.0Q \\ \\\ Oy 14 `sct a Q \\ LOT 1 \I \\ \ / \ LIMIT OF SOIL TEST DATE OF SOIL TEST QE„CE.MBFR 16 2QQZ SOIL TEST DONE BY EA&LF__2V EYJ1yS�__ WITNESSED BY -._ YQN_JiQNE 09SERVATION HOLE 1 ELEV.-_,425 OBSERVATION HOLE 2 ELEV.= 13.91 PERCOLATION RATE ___>__3 MIN./INCH AT 28INCHES PERCOLATION RATE > 3__ MIN./INCH IN C HORIZON DEPTH HORIZ TEXTURE COLOR MOTT. OTHER 0-4 0 FIBRIC NO 4-11 A LOAMY SAND 10YR3/3 11-20 B LOAMY SAND 10YR4/6 0-120 Cl LOAMY 10YR5/8 MEDIUM SAND 21.38 WATER ENCOUNTERED AT 3fi__ ELEV. = __11 25 O • 2( w m M 0 z DEPTH HORIZ TEXTURE COLOR MOTT. OTHER 0-2 0 FIBRIC NO 2-16 A LOAMY SAND t0YR3/3 16-24 B LOAMY SAND 10YR4/6 4-120 Cl LOAMY 10YR5/8 MEDIUM SAND WATER ENCOUNTERED AT _44 ELEV. = __11L2A- DESIGN CALCULATIONS NUMBER OF BEDROOMS _ 4 _ GARBAGE DISPOSAL UNIT TOTAL ESTIMATED FLOW ( 110 GAL/9R./DAY X 4 BR.) -440_ GAL./DAY REQUIRED SEPTIC TANK CAPACITY __8$4_ GAL. ACTUAL SIZE OF SEPTIC TANK 15_0_0_ GAL. SOIL CLASSIFICATION DESIGN PERCOLATION RATE «__ MIN./IN. EFFLUENT LOADING RATE474_ GAL./DAY/S.F. LEACHING AREA 828.33 SQ. FT. (11 X48)+(59=10/12) LEACHING CAPACITY (AREA X RATE) S43.4g GAL./DAY 626.33 X 0.74 RESERVE LEACHING CAPACITY 443,49. GAL./DAY NOTES: 1. ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO D.E.P. TITLE 5 AND THE TOWN'S RULES AND REGULATIONS FOR THE SUBSURFACE DISPOSAL OF SEWAGE. 2. ALL COVERS TO SANITARY UNITS SHALL BE BROUGHT TO WITHIN 6" OF FINISHED GRADE. 3. ALL COMPONENTS OF THE SANITARY SYSTEM SHALL BE CAPABLE OF WITHSTANDING H-10 LOADING UNLESS THEY ARE UNDER OR WITHIN 10 FT. OF DRIVES OR PARKING AREAS, H-20 LOADING SHALL BE USED UNDER OR WITHIN 10 FT. OF DRIVES OR PARKING AREAS. 4. ANY MASONRY UNITS USED TO BRING COVERS TO GRADE SHALL BE MORTARED IN PLACE. 5. NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE WITH DEEDED OR ZONING REGULATIONS. OWNER / APPLICANT IS TO OBTAIN SUCH DETERMINATION FROM APPROPRIATE AUTHORITY. 6. UTILITIES SHOWN ARE APPROXIMATE ONLY, EXCAVATION CONTRACTOR IS TO CALL "DIG -SAFE" AT 1-888-344-7233 AT LEAST 72 HOURS PRIOR TO COMMENCING WORK ON SITE. 7. CONTRACTOR IS TO VERIFY GRADES AND ELEVATIONS AS WELL AS SITE CONDITIONS PRIOR TO COMMENCING WORK ON SITE. ANY VARIATION IS TO BE BROUGHT TO THE ATTENTION OF THE DESIGN ENGINEER IMMEDIATELY, 8. PARCEL IS IN FLOOD ZONE 9. LOT IS SHOWN ON ASSESSORS MAP __t'a _ AS PARCEL _ 10. ALL UNSUITABLE MATERIAL SHALL BE REMOVED FROM UNDER AND FOR A MINIMUM OF 5' AROUND SOIL ABSORPTION SYSTEM AND BE REPLACED WITH SAND AS SPECIFIED IN 310 CMR 15.255:(3). 11. A NEGATIVE GRADE OF 3/4" PER FOOT SHALL BE MAINTAINED FOR A MINIMUM OF 15' AWAY FROM THE FOUNDATION. 12. A. VARIANCE OF 0.61' IS REQUIRED BECAUSE THE TOP OF FOUNDATION IS LESS THAN 2' ABOVE HIGH POINT IN ROAD. 13. GUTTERS; DOWNSPOUTS, AND DRYWELLS REQUIRED. 14. ALL DISTURBED AREAS ARE TO BE REVEGETATED. 15. HAYBALE AND SILTFENCE WORKLIMITS ARE TO BE IN PLACE PRIOR TO 4NY EYCAVA>'ON COMMENCING ON SITE 1c.18 44 195 S.F. 1 \\ 18.40 // I �� 5' OVERDIG / \\ \ 11 • 5.33 \ \\ / 1+11\r / • 1o. \\ \ �s9� I �r I - \ _ I _ - TEST 1 9z 1 � / ®18.64 ZN OF kqs`� / \ 12.71 ((�/ J//1 / \\ �� \►\ I 18 \ / 21.03 4/Y a T.A. A y. /410^23 \ CF • \ \ l y/ No 1lts d � . , �.1. \ / � I ° ��� � a�° PPROVED: BOARD OF HEALTH \ I / • A15.2D�.\; 15.17 11 \\ I DATE AGENT • \ \ �_� \► \ 11 TES027 �\ it PROPOSED SEPTIC DESIGN =k72 / ,.' \r 1 / I FOR / _ _ _ \� \\\ /// HOMER'S DOCK DUBLIN CONSTRUCTION \\ 11.58 \ \► \ // 1\ 62 r^�rm PROJECT LOCATION j f T 29 159 �] \� 10.61 , \. ,/ ;; m CENTER ST., YAR11 UTHPORT 52 LEGEND: 11 11.99 ?�pB / \� / ST SSR ENGD�G EXISTING SPOT ELEVATION >0.0 0. 61 / 235 GREAT WESTERN ROAD EXISTING CONTOUR ----00---- \ \\ ` L 66 39808- F. 0. BOX 713 02660 RNAL SPOT ELEVATION \ \ / • fl43• 5 (�1 SOUTH DENNIS, MASS. FINAL CONTOUR - \\ \ �♦ L 3' 112WO(e SOIL TEST LOCATION Q► \ 10 \\ / \► L C�F� UTILITY POLE rQ, K ��•.� ....� '� REV. T DATE FEB. 6, 2004 SCALE 1 „ = 20>. TOWN WATER -w-�w �� . o' JAN. 5, 2006 CATCH BASIN❑� / h GAS LINE 0 G'" N6'sy�„ \\ / REV. rJOB N0. CESSPOOL Sp � �p \ ri REV' JUNE 28, 2005 AUG. 27, 2004 I - 5892-02 CLEANOUT -ems C.O. �pppp \\'xi°"n REV. APR. 22, 2005 LOCATION MAP REV. OCT. 13, 2004 SHEET 1 OF 1 1.c� \ 1.68 C.- S8 PRO) 5892-00 dwg 5892-SAS-LO72REVJ.DWG 02004 SWEETSER ENGINEERII 1L r 1r,1IY►:LJ 1`