Loading...
83-1693 - Site Plan 2SYSTEM PROFILE TOP FNDN = 19.56' WATERTIGHT ACCESS COVERS TO FIN. GRADE (NOT TO SCALE) ACCESS COVER (WATERTIGHT) TO WITHIN 6" OF FIN. GRADE 18.0 MINIMUM .75' OF COVER OVER PRECAST m RUN PIPE LEVEL 7& ,116 .81' FOR FIRST 2' PROPOSED ]5.0.0_ � 15.75 GALLON SEPTIC 15.5D' H-20 TANK (H- 20) AS a o ITEE o m _ 7.64' BAFFLE v 17.81' PROPOSED 0000Qoo �� DB -9 MIN ---6- CRUSHED STONE OR MECHANICAL 2% SLOPEDEPTH OF FLOW: 4' COMPACTION. (15.221 [2]) INLET TEE DEPTH: 10" OUTLET TEE DEPTH: 14" 4% SLOPE (--LV V SLOPE) PUMP FOUNDATION— 52' ST 130' CHAMBER SEPTIC DESIGN: (GARBAGE DISPOSER Is NOT ALLOWED ) DESIGN FLOW: 6_ BEDROOMS ( 11 1 00 GPD) = 660 GPD USE A 660 GPD DESIGN FLOW SEPTIC TANK: 660 GPD ( 2 ) = 1320 USE A 1500 GALLON SEPTIC TANK (REPLACE EXISTING SEPTIC TANK WITH NEW 1500 GAL. SEPTIC TANK — ADD ZABEL FILTER TO OUTLET) LEACHING: SIDES: N/A BOTTOM: 30 x 32 (.74) = 710 TOTAL: 960 S.F. 710 GPD USE LEACHING FIELD, 30' x 32' x 0.58' DEEP, WITH 5 ROWS OF 4 STANDARD (H-20) INFILTRATORS EACH, WITH 3' STONE BETWEEN ROWS AND 2.5' AT ENDS ALARM AND CONTROL PANEL -� TO BE INSTALLED INSIDE BUILDING. ALARM TO BE ON INV. IN 10.0' SEPARATE CIRCUIT FROM PUMP --� ALARM ON FLOAT SWITCH PUMP OP SETTINGS: I:\JJ:Zo]n1] d s--?a.f 5.3" WORKING RANGE PUMP OFF 6" CRUSHED STONE COMPACTION DATE PROVIDE WATERTIGHT ACCESS COVERS TO GRADE 12.0' 1500 GAL H-20 900+GAL. RESERVE a' PUMP CHAMBER (NOT TO SCALE) WATERPROOF BOARD OF HEALTH MA HOLE VALVE fERS WHRH 928' D' BOX — W. **NOTE: SPECIAL HIGH HEAD IMPELLER ON PUMP MANDATORY off 508-362-4541 fa. 508 362-9880 down cape engineering, inc. CIVIL ENGINEERS LAND SURVEYORS 939 main St. yarmouth, ma 02675 0.58' LEACHING PROVIDE INSPECTION PORTS WITHIN 6" OF FINAL GRADE 2% SLOPE REQUIRED OVER SYSTEM 2" DOUBLE WASHED PEASTONE 3' MAX 17.92' 3/4" TO 1 1/2" DOUBLE WASHED STONE 21 USE WATER AT EL. 9.5' (GLEYED SOIL) TEST HOLE LOGS ENGINEER: A.H. OJALA, PE WITNESS: AMY VON HONE, RS; DAVE FLAHERTY, RS DATE: 12/3/03 PERC. RATE = 60 MINLNCH CLASS III SOILS 0„ Q ELEV. C Q ELEV. 17_1 A LS — 14" FILL & OLD SYSTEM 6" LFS 10YR 4/2 16.6' B SL 42" 30 1OYR 5/6 15.5' FINE SAND 24" 2.5Y 6/6 15.1' C1 SL 54" 2.5Y 6/6 84" 2 7' C2 2.5Y 5/6 ED MED/COS 60" STONES 12.1' C2 10YR 5/8 132" C3 7.8, SILT LOAM SILT LOAM 102" LFS 9.5 108" OBS. WATER 8.1' 168" 216" NGWE BLUE CLAY 4/1OBG TEST HOLE LOGS ENGINEER: A.H. OJALA, PE WITNESS: AMY VON HONE, RS DATE: 12/3/03 PERC: RATE _ < 5 MIN/INCH CLASS 1 SOILS M• ELEV. ELEV. 0" 191 18.0' 0" Ew 18_84' — AP LS 14" 1OYR 3/2 16.34' B LS 30 1OYR 5/6 15.5' Cl PERC MS 2.5Y 6/6 84" 2 7' C2 ED MED/COS STONES 90" 10YR 5/8 132" C3 7.8, VARV 102" LFS 9.5 1OYR 5/3 GLEY 26" NGWE A LS 15"1 1OYR 3/2 SHEET 2 OF 2 TITLE 5 REPAIR/SITE PLAN 126 THACHER SHORE ROAD IN THE TOWN OF: YARMOUTH(PORT) PREPARED FOR: FREDERICA PERERA 4.0 0 40 80 120 SCALE: 1" = 40' DATE: JUNE 22, 2004 REV 10/8/04 (PUMP CALCS) ARNE H. OJALA, P.E., P.L.S. DATE ■I® B LS 30" 10YR 5/6 16.34' Cl MS 68" 2.5Y 6/6 12.1' C2 PERC VFLS 2.5Y 5/3 96" 2 7' C3 ED MS & STONES 2.5Y 6/6 132" OBS WATER 7.8, SHEET 2 OF 2 TITLE 5 REPAIR/SITE PLAN 126 THACHER SHORE ROAD IN THE TOWN OF: YARMOUTH(PORT) PREPARED FOR: FREDERICA PERERA 4.0 0 40 80 120 SCALE: 1" = 40' DATE: JUNE 22, 2004 REV 10/8/04 (PUMP CALCS) ARNE H. OJALA, P.E., P.L.S. DATE ■I®