Loading...
HomeMy WebLinkAbout83-1716 - Site Plan002LEGEND 100.0 PROPOSED SPOT ELEVATION SEPTIC DESIGN: (GARBAGE DISPOSER is NOT ALLOWED DESIGN FLOW: -!L BEDROOMS ( 110 GPD) = 440 GPD 100xO EXISTING SPOT ELEVATION USE A 440 GPD DESIGN FLOW 1pp PROPOSED CONTOUR _ SEPTIC TANK: 440 GPD () = 880 USE A 1500 GALLON SEPTIC TANK — 100 EXISTING CONTOUR LEACHING: SIDES: N/A BOTTOM: 2(25 x 12) (.74) = 444 TOTAL: 600 S.F. 444 GPD USE (2) 25' x 12' LEACH FIELDS EACH CONSISTING OF 2 ROWS OF 3 EQUALIZER 24 HD'S WITH 3' STONE AT SIDES, 3.5' BETWEEN ROWS AND NONE AT ENDS BOARD OF HEALTH , MA APPROVED DATE PROVIDE 4" L AND SEEDED (BOTH SIDES) 1/8" TO 1/2" NATIVE WASHED STONE 4" PROCESSED STONE SAND BASE PERVIOUS DRNEWAY CROSS SECTION (NOT TO SCALE) TOP CULVERT� PIPE BEG DITCH � TOP FNDN AT EL. 25.76' SYSTEM PROFILE — ACCESS COVER TO WITHIN 6" OF FIN. GRADE (NOT TO SCALE) ACCESS COVER (WATERTIGHT) TO MINIMUM .75 OF COVER OVER PRECAST WITHIN 6" OF FIN. GRADE 2% SLOPE REQUIRED OVER SYSTEM _RUN PIPE LEVEL FOR FIRST 2' PROPOSED 1500 GALLON SEPTIC 22 70' BASE FOOTINGS 22.95/ TANK (H- 10 ) GAS o MINIMUM ELEV. ' BAFFLE �� 2`1'52' 22.69' (-1-7 SLOPE) 6" CRUSHED STONE OR MECHANICAL COMPACTION. (15.221 (21) DEPTH OF FLOW = 4' (-L-% SLOPE) (-L-7 -% SLOPE) TEE SIZES: INLET DEPTH OUTLET DEPTH = 14" FOUNDATION— 10' SEPTIC TANK 1' D' BOX *THIS IS A PROPOSED MINIMUM INVERT ELEVATION OUT OF FOUNDATION. PLUMBER/CONTRACTOR TO CONFIRM FEASIBILITY GIVEN PROPOSED ADDITIONS' PLUMBING REQUIREMENTS CONTACT ENGINEER IF NOT FEASIBLE (PUMP DESIGN WOULD BE NECESSARY) PROVIDE MIN. 2' COVER OVER EXIT PIPING (OR INSTALL INSULATING BLANKET OVER PIPING TO SEPTIC TANK) .� 2" DOUBLE WASHED PEASTONE EQUALIZER 24 HD 3/4" TO 1 1/2" DOUBLE WASHED STONE TEST HOLE LOGS PROVIDE INSPECTION PORTS (ONE PER ROW OF EQUAUZERS) ENGINEER: D.A. OJALA, SE 24.0' 25.0' WITNESS: AMY VON HONE, RS - DATE: 9/1/04 _.iPROVIDE MIN. V COMPACTED < 2 MIN/INCH 22 6' COVER IN DRIVEWAY AREA PERC. RATE _ 000"Y> CLASS I SOILS c��.p 4 ELEV. 1 p" 24.7' AP SL 5' 10" 1OYR 4/2 B 34' LEACHING FACILITY USE ADJ. WATER AT EL. 16.7' 36" LS 1OYR 5/6 21.7' C PERC M/F NOTE: BASE OF FOOTINGS FOR NEW ADDITIONS SHALL BE MINIMUM 2' ABOVE THE ADJUSTED GROUNDWATER ELEVATION SAND 9.8' 14.9' OBS. WATER 2.5Y 6/4 123" 14.5' zl l01 I �p w. 0 #5 5' REMOVAL OF UNSUITABLE SOIL OLD DON 1, r I REQUIRED AROUND PERIMETER OF O� SCHALL LEACHING FACILITY, DOWN TO FLAG , , SUITABLE SOIL LAYER. REPLACE r WITH CLEAN MED. SAND. ENGINEER �oG�i i / ! 50' TO INSPECT AND CERTIFY ' REMOVAL 7/ 100' 3 8 QQ PROVIDE VENT WITH CHARCOAL FILTERGj • r =r"�/ r - o �• AND BUGSCREEN (FINAL PLACEMENT WITH /' mr �2' o HOMEOWNER CONSULTATION) PROP. BERM `I, / #3 - (BOTH SIDES OF . k ' DRIVEWAY) �o O / h i' PROP. ADD —19 N C,v \ PROP. WORK LIMIT LINE 4� I/ r 2 / \ RE-ROUTE GASLINE ro EMS . / am i CRAWL f I ♦ NCf) , �/ LEACH. I�.�� ' SPACE�� pRop \.'C / i F IL1T1• �o SLAB IF' ' Lu _' (R OVE o r ! l `'7 Ltj NAIL IN i #16, — — — — — \ RyO� \ / a• o m r REMOVE < % UTILITY POLE ; i PROP. WORK LIMIT UNE �Sq \ S pR ,i,// a�Z j;' EXIST. DECK r. R E� PROP. RESERVE AREA (450 SF) ELEV. _ ! kfp \ \ \ NFlygy — / PROP. I/ ! _ E ! *SHOULD PRIMARY SYSTEM FAIL, REPLACE 20.7 - i S!(T ♦ PAVED / r r IN KIND, AND REMOVE AND REPLACE ANY ! i ' #12 ,` FfNC♦ ` Q `, DRNE. H•'PIN (/ ; EXISTING -�-� CONTAMINATED SOILS i / // ' DWELLING ! G LOTS 11 & 3 ♦� r TF=25.76' i 13 26,173 ±SF �U r 1 #11 I i #17 J23 li 50 S. 8•InNE PROP ADDN NXVSOUT �! -_/ / 3 r ELEV=22.26' BENCHMARK: USE C. BASIN AT ELEVATION 25.0" ' #10A ' CRAWLSPACE I i ! 1 r � j ISOLATED 1 WETLAND '� 24 (,0IS'I 1O i SEWER LINES MUST BE SLEEVED FOR 10' EITHER SIDE OF ! CROSSING WITH WATERLINE cQ 6616 SF PUMP AND EMOVE EXIST SEP C TANK #1 7;77,71r j I I Q- #9 #9 #2 i #31, #6 5' REMOVAL OF UNSUITABLE SOIL REQUIRED AROUND PERIMETER OF LEACHING FACILITY, DOWN TO ' SUITABLE SOIL LAYER. REPLACE WITH CLEAN MED. SAND. ENGINEER #7 , TO INSPECT AND CERTIFY #4 REMOVAL r i r -'- #6 #4 liJJCJJVRJ MHr I YV rf1RVCLJ LO a. LJ ZONING DISTRICT: R 40 YARD SETBACKS: FRONT = 30' SIDE = 20' REAR = 20' PLAN REF. — LCP 34907 A FLOOD ZONE: C GROUNDWATER FOUND AT EL. 14.9' ADJ: 1.8' (SDW 252, ZONE A) USE ADJ. WATER AT EL. 16.7' NOTES: 1. DATUM IS ASSUMED 2. MUNICIPAL WATER IS EXISTING . 3. MINIMUM PIPE PITCH TO BE 1/8" PER FOOT. 4. DESIGN LOADING FOR ALL PRECAST UNITS TO BE AASHO H- 10 5. PIPE JOINTS TO BE MADE WATERTIGHT. 6. CONSTRUCTION DETAILS .TO BE IN ACCORDANCE WITH MASS. ENVIRONMENTAL CODE TITLE V. 7. THIS PLAN IS FOR PROPOSED WORK ONLY AND NOT TO BE USED FOR LOT LINE STAKING. 8. PIPE FOR SEPTIC SYSTEM TO SCH. 40-4" PVC. 9. COMPONENTS NOT TO BE BACKFILLED OR CONCEALED WITHOUT INSPECTION BY BOARD OF HEALTH AND PERMISSION OBTAINED FROM BOARD OF HEALTH. 10. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIF(ING THE LOCATION OF ALL UNDERGROUND & OVERHEAD UTILITIES PRIOR TO COMMENCEMENT OF WORK. 11. WETLAND FLAGGED BY HAMLYN CONSULTING 12. ROOF RUN OFF TO BE DIRECTED TO DRYWELLS OR STONE TRENCHES TITLE 5 SITE PLAN OF 147 CENTER STREET IN THE TOWN OF: YARMOUTH (PORT) PREPARED FOR: RONALD & DEBORAH TRACHTENBERG 20 0 20 40 60 SCALE: 1" = 20' DATE: JANUARY 27, 2005 ARNE H. OJAIA 'A No.26346 �, P.E., P.L.S. DATE off 508-362-4541 fox 508 362-9880 down cape engineering, inc. CIVIL ENGINEERS LAND SURVEYORS 939 main St. yarmouth, ma 02675