XISTING CHANNEL MARKER TIMBER PIE NOTES GENERAL NOTES:
1. ALL TIMBER FOUNDATION PILES SHALL BE OF TYPE 1 SPECIES LUMBER 1. SUPPLY ALL MATERIAL, EQUIPMENT AND LABOR FOR CONSTRUCTION OF
AS DEFINED IN SECTION 1822.0 OF THE MASSACHUSETTS STATE BUILDING PERMANENT PIER, RAMPS, AND FLOAT AS DESCRIBED AND SHOWN ON
CODE AND SHALL CONFORM TO THE APPLICABLE PROVISIONS F THE
PLAN AND DETAILS.
°STANDARD FOR ROUND TIMBER PILES", ASTM D-25.
2. ALL WORK TO BE --5- _ r / 2. ALL TIMBER PILES SHALL BE PRESSURE TREATED WITH WATERBORNE SPECIFICATIONS AND THE OR ORFORMEDER F CONDITONSEISS ED BYE THENS,
WITH
- - - - - - BASS RIVER CCA PRESERVATIVE IN ACCORDANCE WITH AWPA C3. TREATMENTS SHALL YARMOUTH CONSERVATION COMMISSION.
--6- \ (TIDAL)_ CONFORM TO THE AWPB STANDARD MP -4. ALL PILE CUTOFFS SHALL BE
TREATED IN ACCORDANCE WITH AWPI STANDARD M-4. THE MINIMUM 3. ACCESS TO BE FROM THE GRAVEL PATH ON THE ABUTTING
PRESERVATIVE TREATMENT RETENTION FOR TIMBER PILES SHALL BE 2.5 ASSOCIATION PROPERTY, THE APPLICANT'S PROPERTY, OR FROM WORKING
FLOOD PCF. BARGE. WORKING BARGE NOT TO BE LOCATED OVER MARSH AT ANY TIME
EXISTING bT00 t NGr - - �/ / \ � / 3. BEFORE ANY TREATED PILES ARE DRIVEN, A CERTIFICATION SHALL BE STAGING AREA FOR MATERIALS 70 BE IN THE APPLICANT'S DRIVEWAY,
(� \ EBB / \ \ r EXISTING MOORING
_SUBMITTED, CERTIFYING THAT THE PILES WERE FREE FROM DECAY, WERE
(TYP.) 4. METAL TO BE HOT DIPPED GALVANIZED AFTER FABRICATION. TIMBER IN
-8- PROPERLY PEELED AND OTHERWISE PREPARED BEFORE TREATMENT, AND
THE METHOD OF TREATMENT, THE CHEMICAL COMPOSITION AND THE CONTACT WITH GROUND 70 BE CCA PRESSURE TREATED IN ACCORDANCE
„ WITH WOOD PRESERVATIVE INSTITUTE SI AMT LU ALL OTHER TIMBER TO
-,9 \ _!__�- \ / � AMOUNT OF RETENTION F THE PRESERVATIVE CONFORM TO THE BE ACQ TREATED, OR OTHER ROT -RESISTANT LUMBER TYPE. STAINLESS
b / \80 FT \ / \ , / REQUIREMENTS SPECIFIED HEREIN. THE PRESERVATIVE RETENTION SHALL STEEL HARDWARE IS REQUIRED WITH THE USE OF ACQ MATERIAL
\ /---- -----� ASf T FROM '"% 9\ \ --8-, / BE DETERMINED BY ASSAY METHOD.
\ 1 MHW / \ / 5. NO MACHINERY OR EQUIPMENT TO OPERATE IN THE MARSH.
\\ - / / m ( Y \ \ / 4. PILES SHALL BE 800 PSI MINIMUM COMPRESSIVE STRENGTH PARALLEL
\ - TO GRAIN AND SHALL MEASURE AT LEAST EIGHT INCHES (8°) IN 6. CONSTRUCTION DETAILS TO BE APPROVED BY ENGINEER PRIOR TO
Co \\ \( '-9- - - - - - - DIAMETER AT THE TIP. CONSTRUCTION.
\\ \\ (\ EXISTING MARKER FLOAT \ 5. EACH PILE SHALL BE DRIVEN BY MECHANICAL MEANS, IN ONE PIECE,
`. EXISTING MOORING 7. DISTURBED AREAS TO BE REVEGETATED TO MATCH PRE -CONSTRUCTION
a \\ \\ �` / \ \ 9\ (TYp) WITHOUT SPLICING, AND SHALL BE DRIVEN TO THE DEPTHS SPECIFIED IN CONDITIONS.
\\\( __9_ _ - ) \ \ - _ SECTIONS A -C OR REFUSAL ENGINEER SHALL BE NOTIFIED IF REQUIRED
DEPTH CAN NOT BE ATTAINED. B. OFF-SEASON STORAGE OF RAMP AND FLOAT, IF DESIRED, SHALL BE
) / O �r� _ - - - AN APPROVED UPLAND LOCATION SUCH AS THE APPLICANT'S DRIVEWAY.
MCLS \ _ \
EXISTING / / /) '-7_ - _ - - - �� 6. DURING THE PILE DRIVING OPERATION, ANY SUDDEN DECREASE IN
= DRIVING RESISTANCE SHALL BE INVESTIGATED WITH REGARD TO THE
__--4 9. MINIMUM SPACE BETWEEN ALL DECK PLANKING TO BE 3/4°, WITH
- _ POSSIBILITY OF BREAKAGE OF THE PILE, AND IF SUCH SUDDEN DECREASE
-_-5- -_ a / -5_ = 4_ _ - /�. - --3-/ _ / _ ,-2� IN DRIVING RESISTANCE CANNOT BE CORRELATED TO BORING DATA, AND PLANKING ORIENTED NORTH -SOUTH.
�•. • • \ \�23 - `�-2- `7- IF THE PILE CANNOT BE REMOVED FOR INSPECTION. IT SHALL BE
- '• MLW PER FIELD SURVEY IF THEE LE CANNOT B ��5�7 FOR r �£�., 10. PROPOSED ACCESS PATH TO BE CLEARED TO 4 FEET WIDE MAXIMUM
OF TE PILE. ,NT ,
.... MW M:. Ah'�.
EXISTING RAMP \ / •, tDRIVEN
ETTING, AUGURING AND OTHER METHODS OF PRE -EXCAVATION TO
` EVE THE MINIMUM 71P ELEVATION MAY NOT BE PERMITTED WITHOUT SPECIAL REQUIREMENTS FOR COASTAL CONSTRUCTION
\�"" `-- \ \ \ / /•' EOG isARSH � R APPROVAL BY THE ENGINEER. WHERE PERMITTED, THE
EXISTING PIER I =IG �° \,•.,"\ - r I x4 ARTINA ALTERNIFLORA TOWN OF YARMOUTH CONSERYA710N
- -- N /� / EXCAVATION MUST BE CARRIED OUT IN A MANNER WHICH WILL NOT 1. SPECIAL PROVISIONS FOR COASTAL CONSTRUCTION SHALL BE IN
F _{ L ,� OH \ _ i ^ I �J ��SRTINA PATENS ASSESSORS MAP 102 IR THE CARRY NG CAPACITY OF THE PILES ALREADY IN PLACE, ACCORDANCE WITH THE RECOMMENDATIONS FOUND IN THE "COASTAL
-N- �_q l � �!�' � I � � � PARCEL 12 DIATELY AFTER COMPLETION OF JETTING OR AUGURING, THE PILE
�ow N N / •' CONSTRUCTION MANUAL' AS PUBLISHED BY THE FEDERAL EMERGENCY
LL BE ADVANCED TO THE MAXIMUM DEPTH OF PRE -EXCAVATION AND
\ \I ~-PUBLIC ACCESS pCCESS�'� `MANAGEMENT AGENCY (FEMA -55).
PROPERTY UNE PER PLAN BOOK BELOW THIS DEPTH TO THE REQUIRED DEPTH SPECIFIED HEREIN.
PUB}.C. `� 376, PAGE 82 (SEE NOTE)
B. THE PILE DRIVING CONTRACTOR SHALL KEEP AND SUBMIT A PILE 2• ALL STEEL MEMBERS, CONNECTIONS, CONNECTORS, ETC. SHALL BE
® HOT DIPPED GALVANIZED. ALL METAL CONNECTORS MUST BE ROUTINELY
\ \SM -3. PROPOSED WALKWAY, DRIVING LOG FOR EACH PILE. INSPECTED AND MAINTAINED OVER THE SERVICEABLE LIFE OF THE
PIER RAMP AND FLOAT MLW PER PLAN BOOK 376, STRUCTURE.
(BENCHMARK - CONCRETE BOUND #0® / / �Q PAGE 82 (SEE NOTE) 9. THE END OF THE PIER SHALL BE ANCHORED TO THE GROUND WITH A
ELEV. = 6.55 (MLW DATUM) / Q HELICAL ANCHOR OR APPROVED EQUAL TO PREVENT LIFTING IN AN ICE
� AUNT POLLYS COVE 3. ALL LUMBER USED FOR PILES, CROSS BRACES, AND YOKES SHALL BE
\ N \ o PROPOSED ACCESS AND WORK OMIT (TIDAL) EVENT. TYPE OF ANCHOR AND ATTACHMENT METHOD TO BE APPROVED MARINE GRADE CCA LUMBER. ALL OTHER LUMBER TO BE NON -CCA
/ FLOOD BY ENGINEER PRIOR TO CONSTRUCTION.
® N - TREATED OR APPROVED EQUAL.
PROPOSED 4' WD
ACC SS RA1 61 Q
® / PROPOSED 4' WIDE �\ / %N \ . UPLAND GRASSES
BLUE ROCK LANDING ASSOCIATION 40/ / \ ACCESS PAT
ASSESSORS MAP 102 ® \ N EDGE OF
PARCEL 11 ® 440/ \ \ \ \ \ CLEARING/TREELINE
EXISTING WETLAND
\ \ \ N FLAGGING , z
00,
4,0
EDF
\CLEARING/TREEUNE, \
Q - Ir
CHARLES A. AND MARGERY A. DEWTO
ASSESSORS MAP 102 gip, , ll; rl�' ,l ; ,y,
PARCEL 13 'Yr''I'rr /r+;Illl fll,,;,
„r;!;lll!!;,rhll,lrl,r,lll
SUSAN D. REND
ASSESSORS MAP 101
PARCEL 174
RUSSELL L. POTTER
ASSESSORS MAP 101
PARCEL 181
PLAN
SCALE: 1"= 30'
°
2 x 6 DECKING W/
1/2" SPACING °
BETWEEN PLANKS
2x8 JOISTS FLUSH FRAMED
® 2' O.C. AND NAILED (TYP)
(2) 2 x 8 STRINGERS °
1 inch = 30 ft.
2 x 8 RAIL CAP
r 2 x 4 RAILS
8" PILE Q
2- 2 x 8 YOKE_ �/ 8 PILE
TYPICAL PIER VIEW
SCALE: 1"= 2'
on
a
4'
RUu is
�\ EXIT 9
2x8 HANDRAILS
JA2
-1
ROUT EDGES
ASSESSORS MAP 101, PARCEL 13
PLAN BOOK 395, PAGE 50
�- 2x4
PLAN BOOK 376, PAGE 82
r
2x4 SIDE RAILS W/
F,R10 ^
FLOOD NOTE
3/8"0 THRU BOLTS
< �..- .� 'BLANK COUN
RD.
%YfBTfRN
FLOOD ZONES A5(EL.6), B, AND C AS
= Rp
-#
r
2x6 DECKING (NORTH/
0002 D REVISED JULY 2, 1992.
'
`SOUTH ORIENTATION)
PANEL 004C.
I ° I ° 2- 2x8 YOKE I °,�
_ PILES RUN UP TO RIALING
(TYP)
46 POSTS BETWEEN PILES
(TYP)
2x8 JOISTS FLUSH FRAMED
2' O.C. AND NAILED (TYP)
2 - 2x8 STRINGERS (EACH
SIDE) W/2 - 5/8"0 THRU
BOLTS 0 POST CONNECTOR
- 2- 3/4"0 BOLTS
- 3X6 BRACING WITH
3/4" DIA. BOLTS
8"0 x 20' PERMANENT PILE
ANCHOR TYPE TO
APPROVED BY ENGINEER
SECTION D -D
SCALE: 1"= 2'
a
QREVISION 2 NOTES
THE PROJECT IS MODIFIED AS FOLLOWS:
1. THE LANDWARD END OF THE WALKWAY INCLUDES A 10' LONG X 12'
WIDE LANDING. ADDITIONAL CLEARING OF UNDERSTORY VEGETATION TO A
WIDTH OF 14' IS ALLOWED IN THIS AREA ONLY. AN ACCESS RAMP IS
ADDED TO REPLACE THE ACCESS STEPS TO ALLOW FOR FUTURE
HANDICAP USAGE. THE LANDING IS CONTAINED IN THE UPLAND
VEGETATION AND SHALL NOT EXTEND OVER THE MARSH GRASS.
2. LOW LEVEL LIGHTING, WATER, AND SHORE POWER ARE TO BE
INSTALLED ALONG THE WALKWAY TO THE PIER, WITH A SERVICE PEDESTAL
INSTALLED ON THE END OF THE PIER OR ON THE FLOAT.
3. THE HANDRAIL DESIGN IS MODIFIED TO ALLOW THE HANDRIAL TO BE
INTEGRAL TO THE PILES; SEE SECTION D -D DETAIL THE HANDRAIL SHALL
BE 2° X 8", WITH ROUTED EDGES AS SHOWN.
2- 46 POSTS FOR RAILING SUPPORT
THIS DRAWING REPRESENTS THE SCOPE
OF THE PROPOSED WORK
THIS DRAWING IS PREPARED FOR PERMITTING PURPOSES
ONLY AND SHALL NOT BE USED FOR CONSTRUCTION
WITHOUT WRITTEN AUTHORIZATION FROM THE ENGINEER.
20' SECTION, TYPICAL
PIER PLAN VIEW DETAIL
SCALE: 1"= 2'
RUu is
�\ EXIT 9
PLAN REFERENCES:
-1
` ' ` BASS RIVER
ASSESSORS MAP 101, PARCEL 13
PLAN BOOK 395, PAGE 50
f
PLAN BOOK 376, PAGE 82
MHW TO END = 37*±
F,R10 ^
FLOOD NOTE
PP` R'"D ` ^ RD• PER
'
< �..- .� 'BLANK COUN
RD.
%YfBTfRN
FLOOD ZONES A5(EL.6), B, AND C AS
= Rp
SHOWN ON FEMA FIRM PANEL #250015
LOCUS�.j..
0002 D REVISED JULY 2, 1992.
LAND UNDER OCEAN
BENCHMARK OBTAINED FROM RM11 ON
PANEL 004C.
\� 1
FIELDWORK CONDUCTED BY COASTAL
ENGINEERING OCTOBER, 2004
MHW MLW
YARMOUTH, MA
NOTE: PROPERTY LINE DELINEATION
BETWEEN TOWN OF YARMOUTH
KEY MAP
CONSERVATION AREA AND THE DEVITO
PROPERTY IS APPROXIMATED FROM
NO SCALE
PLAN TITLED "PLAN OF LAND IN SOUTH
YARMOUTH, MASS. FOR DWIGHT L.
DATUM FOR ALL ELEVATIONS IS MLW
TI NS I
ELEVATIONS
ROGERS JR.", AUGUST, 1983 RECORDED
CONVERSION TO NGVD
IN BDOK 376, PAGE 82
PROPOSED 3'
LEGEND
POSED 15' ACCESS RAMP
■ BOUND
0 EXISTING PILE
- -10- - CONTOUR
- - EDGE OF MARSH
QUPLAND GRASSES
MHW
MLW
�j UPLAND GRASS
dll, SPARTINA ALTERNIFLORA
SPARTINA PATENS
THIS DRAWING REPRESENTS THE SCOPE
OF THE PROPOSED WORK
THIS DRAWING IS PREPARED FOR PERMITTING PURPOSES
ONLY AND SHALL NOT BE USED FOR CONSTRUCTION
WITHOUT WRITTEN AUTHORIZATION FROM THE ENGINEER.
20' SECTION, TYPICAL
PIER PLAN VIEW DETAIL
SCALE: 1"= 2'
30
PROPOSED HELICAL
ANCHOR (TYP)
SECTION A -B L SECTION B -C
A -B& B -C
SCALE: 1"= 10'
MLW-- 10.0
RMANENT PILE
)ECKING (NORTH/
H ORIENTATION)
2 - 2x8 STRINGERS (EACH
SIDE) W/2 - 5/8"0 THRU
BOLTS 0 POST CONNECTOR
50 60 70
PROPOSED 1' DIAM. ANCHOR
PILES, 30 FEET LONG
OASTAL
NGINEERING
OMPANY, INC.
260 Cranberry Hwy. Orleans, MA 02653
508.255.6511 Fax: 508.255.6700
SEAL.
O� as
w
Q U
� � Q
Q
0
0
° O
W �
yqa �
u o w
F
SCALE
AS NOTED
DRAWING FME
C16322.dwg
DATE
12-16-04
DRAWN BY
MAP/MCB
CHECKBDBY
PJM
0
0
N
G
US -1
q
OF L SHEETS
FROJBCTxo. C16322.00
L� SALT MARSH
-1
f
MHW TO END = 37*±
INTERTIDAL
LAND SUBJECT TO COASTAL STORM FLOWAGE
AREA
LAND UNDER OCEAN
MHW MLW
NORTH/SDUTH ORIENTATION FOR
I- PROPOSED 4' % 50' WALKWAY
PROPOSED 4' X 20' PIER
DECKING; SEE PIER DETAILS
7
z-fTOP OF PILE
PROPOSED 3'
POSED 15' ACCESS RAMP
DECK EL.=7.3t
X 20RAMP
QUPLAND GRASSES
I:5
I
FIr
3
i
070
20
30 40
50
60
-1
EX STING GRADE
EX. SP RT NA
-3ATENS
ALT RNIFLORA
PROPOSED 8" DIAM.
PROPOSED B" DIAM.
-5
PILES. 10 FEET LONG
PILES 20 FFFT I ONG
-7
30
PROPOSED HELICAL
ANCHOR (TYP)
SECTION A -B L SECTION B -C
A -B& B -C
SCALE: 1"= 10'
MLW-- 10.0
RMANENT PILE
)ECKING (NORTH/
H ORIENTATION)
2 - 2x8 STRINGERS (EACH
SIDE) W/2 - 5/8"0 THRU
BOLTS 0 POST CONNECTOR
50 60 70
PROPOSED 1' DIAM. ANCHOR
PILES, 30 FEET LONG
OASTAL
NGINEERING
OMPANY, INC.
260 Cranberry Hwy. Orleans, MA 02653
508.255.6511 Fax: 508.255.6700
SEAL.
O� as
w
Q U
� � Q
Q
0
0
° O
W �
yqa �
u o w
F
SCALE
AS NOTED
DRAWING FME
C16322.dwg
DATE
12-16-04
DRAWN BY
MAP/MCB
CHECKBDBY
PJM
0
0
N
G
US -1
q
OF L SHEETS
FROJBCTxo. C16322.00