Loading...
HomeMy WebLinkAboutEngineered Plans - 2016LOCATION MAP Q 0 0 W 0 J u _ 3 z ASSESSORS MAP: PARCEL: */z/ FLOOD ZONE: A-167 PI -76A SA 16 REFERENCE: 110,E qq I �I 00 � to >M��• -T� 7-m- TEST HOLE LOGS SOIL EVALUATOR: WITNESS: G%1 V() ,L DATE: PERCOLATION N�, en v 99,5 Nit/ l f"V V/ TH-I TH-2 Br l �� 5 4o %% Z� Z1L I) The ins(allation shall cornp� ►villi `fide V aura Town, of� Board of Ileallh Regulations. 2) The installer shall verify the location of utilities, sewer inverts rind septic components prior to installation and setting ]rase elevations. 3) All gravity septic piping to be 4 inch Scli 40 PVC at 1/8" per foot. The first two li;et out of the d -box to the 61ching shall be level. 4) This plan is not to be utilized for property line determination nor any other. purpose other than the proposed system installation. 5) All septic components must meet Title V specifications. 6) Parking shall not be constructed over 1110 septic components. ' 7) The property is bounded by property corners and property lines. 8) The property owner shall review design considerations to approve or total design flow and number of bedrooms to be considered for design. Receipt of payment for the plan and installation based on the plan shall be deemed approval of the.design flow by the owner.. 9) The existing leaching or cesspools shall be pumped and filled with material per Title V abandonment procedures. Those within the proposed SAS shall be removed along with contaminated soil and replaced with clean sand per Title V specs. 10) System components to be 10 feet from water line. Sewer lines crossing the water line shall be sleeved with 4 inch SCf 140 1'VC with ends grouted if applicable. The proposed SAS is beinginstalled below the water service I; The line is to be sleeved as aforementioned and maintained in place. SEPT I SYSTEM DES I GN 1 1) Ira garbage grinder exists it is to be remove(] and is (lie responsibility of the owner to ensure such.. FLOW ESTIMATE 12)1'he installer is to take caution in excavation around the gas line irsuch exists. BEDROOMS AT 1,10 GAL/DAY/BEDROOM -- GAL/DAY 13)Tiie installer shall verify the location, quantity and elevation of the sewer lines exiting the dwelling"Hor to the installation. SEPTIC TANK 14) This plan is representative only that a system can fit on a property meeting Title V requirements. ,350GAL/DAY x 2 DAYS - b GAL USE ')GALLON SEPTIC TANI CAIJ& 4Cp 6 F--.. uon�t Wn��`,!ti-.-c.:^�_ ./fin �_'� � '1- ��_. _�;-_ _ - __� .__ --- _-- -- - �-r -- �- - _�--.��3'i e�i� y`!•L. =-- -----� _� _ - _.._T 5 1 D E AREA: zXDAVID 4' is BOTTOM AREA: B. 4 1 � t�l 37, � � MAsorl v No 1066 Gni EP_T_._LC SYSTEM SECTION y &V Ito rjo �' y� � °►7,5 to" ,Til � alb � w,Na" oe r W141� b - _ - K D(D GAL q�,o �4Alf SEPTIC T K AUU U ?u18 /,Omo t I� 1 ftv HEALTH DEPT. SITE AND SEWAGE PLAN LOCATION: Ywrmouth Herdt) Dcparhment � APP VED � PREPARED FOR: Me Dnte SCALE: V DAV.I D B. MASONtR5 DATE: 0 DBC ENVIRONMENTAL DESIGNS' DATE HEALTH AGENT EAST SANDWICH. MA (508) 833-2177