HomeMy WebLinkAbout83-1741 - Proposed Bulkhead9't
3/4' 1HRU BOLT 0 2' O.C. FOR NEW 8'0 P.T. (CCA) PILE (9't) O.C.
SHOREGUARD 950 ANCHOR WALE (COUNTERSUNK)
VINYL SHEETING,
20 FEET LONG�-- 6'X 6' P.T. TOP ANCHOR WALE 3 t (GREENHEART ANCHOR WALE BELOW)
II II
II
1 II
if ° II 4'X 6' P.T. SACC WALE
II• II
• II ii ° • °. ii
NEW BULKHEAD „
EXISTING BULKHEAD II . , e j : ; • II VOIDS IT BE FILLED WITH
TIMBER TI
• II ,• CEMENTIOUS FILL
II II EXISTING TIMBER PILES;
CUT OFF BELOW GRADE
I
ANCHOR TIE RODS EXISTING TIMBER SHEETING; EXISTING TIMBER WALES
CUT OFF BELOW GRADE
12
10
8
6
4
2
0
-2
-4
TION A -A PLAN VIEW
SCALE: 1"= 2'
AIL
LAND UNDER OCEAN MLW MHW LAND SUBJECT TO COASTAL
STORM FLOWAGE I
EXISTING BUILDING
PROPOSED RECONSTRUCTED EXISTING TIMBER EXISTING CONCRETE
BULKHEAD (SEE DETAIL) BULKHEAD _ WALKWAY
VINYL SHEETING SEE
NOTE 9
RELOCATE MARSH
(TYPICAL)
EXISTING BULKHEAD TYPICAL
SEAWARD AS NEEDED
1. THE PURPOSE OF THIS PROJECT 6 TO RECONSTRUCT EXISTING FAILING TIMBER
Y
----�--_"
f-'-
EXISTING GRADE
EXISTINGIGRADE
LICENSE #685. A BEEN FOUND FOR THE EXISTING TALL (EL=11.0'
MAINTAIN EXISTING ELEVATION 'g
v
i
OF SPARTINA ALTERNAFLORA ,
-
EXISTING�GRADE
EXISTING' +BULKHEAD (HEIGHT
VARIES FROM 2.4 TO 11.0')
PROPOSED 12"0 FIBER ROLL
3. SUPPLY MATERIA, EQUIPMENT AND LABOR TO INSTALL THE PROPOSEDWORK ALONG
THE SHOREFRONT AS DESCRIBED AND SHOWN ON THE PLAN AND DETAILS.
TIMBER PILE NOTES
4. PERFORMANCE OF THE WORK SHALL BE IN COMPLIANCE WITH THE PLANS,
' 1-V N
SPECIFICATIONS, AND ORDER OF CONDITIONS ISSLED BY THE YARMOUTH CONSERVATION
MHW-1.8
1/6" STAINLESS STEEL WIRE ROPE FASTENED
2. EACH PILE SHALL BE DRIVEN BY MECHANICAL MEANS, IN ONE PIECE,
ML'W_� 1�1
AT EYE OF ANCHOR TO BE TIGHTLY LACED
MHW
'
'.'MLW11
8' NGVD
THRU WEBBING OF FIBER ROLLS.
CAN NOT BE ATTAINED.
60" DUCKBILL D866 ANCHORS
EXISTINGI
THREE FEET O.C. - ANCHORS TO _ EXISTING GRADE
FSC?a`
BE INSTALLED FLUSH TO GROUND.
RESISTANCE SHALL BE INVESTIGATED WITH REGARD TO THE POSSIBILITY OF
EXISTING MARSH (VARIES)
BREAKAGE OF THE PILE, AND IF SUCH SUDDEN DECREASE M DRIVING
MARSH EXTENSION/MITIGATION
DETAIL
ACCORDANCE WITH THE AMERICAN WOOD PRESERVERS ASSOCIATION (AWPA)
CANNOT BE REMOVED FOR INSPECTION, IT SHALL BE CONSIDERED ADEQUATE
STANDARDS C-2 AND C-18. MATERIAL FOR ANCHOR WALES TO BE GREENHEART.
REASON FOR THE REJECTION OF THE PIE
8. ALL PILES AND TIMBER IN CONTACT WITH GROUND TO BE GREENHEART OR CCA
4. JETTING, AUGURING AND OTHER METHODS OF PRE -EXCAVATION TO ACHIEVE
EXISTING
GRADE
TALL BUL
APPROVAL BY THE ENGINEER. WHERE PERMITTED, THE PRE -EXCAVATION MUST
9. SHEETING MATERIAL SHALL BE SHOREGUARD 950 VINYL MINIMUM SHEETING LENGTH
BE CARRIED OUT IN A MANNER WHICH WILL NOT IMPAIR THE CARRYING
SHALL. BE 16' FOR TIE SHORT WALL, AND 20' FOR THE TALL WALL
CAPACITY OF THE PILES ALREADY IN PLACE IMMEDIATELY AFTER COMPLETION
0 10 20 30 40 50
SECTION A -A
SCALE: 1"= 10'
TOP OF PILE = 14.0' NGVD
2,t EXISTING PILES AND
RAILING; CUT OFF
1 -FOOT BELOW GRADE
ALLUSTER SYSTEM AS
'PROVED BY ENGINEER
PROPOSED P.T. TIMBER CAP
WITH 3 -INCH DIMENSIONAL
11IMRFR• T n W = 11.0' NGVD
WALE
MHW
EXISTING GRADE
PROPOSED 8-10' DIAM.
P.T. PILES, 35' LONG, 20
/ EXISTING GRADE
EMBEDMENT MALL BE 25-FEE7 BEHIND EXISTING
+•I IWALL; CAPACITY SHALL BE 20 KIPS MINIMUM EA(
EXISTING TIMBER SHEETING AND PILES TO REM
FILL BETWEEN SHEETS
WTH PLOWABLE FILL
PROPOSED 6'x 6' P.T.
WALES (2 TOTAL)
• PROPOSED 4'x 6'
P.T. GUIDE WALE
SCALE: 1"= 2'
ETAIL 0
VINYL SHEETING SEE
NOTE 9
RELOCATE MARSH
(TYPICAL)
EXISTING BULKHEAD TYPICAL
SEAWARD AS NEEDED
1. THE PURPOSE OF THIS PROJECT 6 TO RECONSTRUCT EXISTING FAILING TIMBER
Y
\ /
f-'-
ALTERNAFLORA ® 12. O.C. AS NEEDED
EXISTINGIGRADE
LICENSE #685. A BEEN FOUND FOR THE EXISTING TALL (EL=11.0'
MAINTAIN EXISTING ELEVATION 'g
v
OF SPARTINA ALTERNAFLORA ,
-
EXISTING�GRADE
EXISTING' +BULKHEAD (HEIGHT
VARIES FROM 2.4 TO 11.0')
PROPOSED 12"0 FIBER ROLL
3. SUPPLY MATERIA, EQUIPMENT AND LABOR TO INSTALL THE PROPOSEDWORK ALONG
THE SHOREFRONT AS DESCRIBED AND SHOWN ON THE PLAN AND DETAILS.
TIMBER PILE NOTES
4. PERFORMANCE OF THE WORK SHALL BE IN COMPLIANCE WITH THE PLANS,
' 1-V N
SPECIFICATIONS, AND ORDER OF CONDITIONS ISSLED BY THE YARMOUTH CONSERVATION
MHW-1.8
1/6" STAINLESS STEEL WIRE ROPE FASTENED
2. EACH PILE SHALL BE DRIVEN BY MECHANICAL MEANS, IN ONE PIECE,
ML'W_� 1�1
AT EYE OF ANCHOR TO BE TIGHTLY LACED
A WORKING BARGE WORKING BARGE NOT TO BE LOCATED OVER MARSH AT ANY TIME
SECTION A -A OR REFUSAL ENGINEER SHALL BE NOTIFIED IF REQUIRED DEPTH
THRU WEBBING OF FIBER ROLLS.
CAN NOT BE ATTAINED.
60" DUCKBILL D866 ANCHORS
EXISTINGI
THREE FEET O.C. - ANCHORS TO _ EXISTING GRADE
FSC?a`
BE INSTALLED FLUSH TO GROUND.
RESISTANCE SHALL BE INVESTIGATED WITH REGARD TO THE POSSIBILITY OF
EXISTING MARSH (VARIES)
BREAKAGE OF THE PILE, AND IF SUCH SUDDEN DECREASE M DRIVING
MARSH EXTENSION/MITIGATION
DETAIL
ACCORDANCE WITH THE AMERICAN WOOD PRESERVERS ASSOCIATION (AWPA)
CANNOT BE REMOVED FOR INSPECTION, IT SHALL BE CONSIDERED ADEQUATE
STANDARDS C-2 AND C-18. MATERIAL FOR ANCHOR WALES TO BE GREENHEART.
REASON FOR THE REJECTION OF THE PIE
8. ALL PILES AND TIMBER IN CONTACT WITH GROUND TO BE GREENHEART OR CCA
4. JETTING, AUGURING AND OTHER METHODS OF PRE -EXCAVATION TO ACHIEVE
SECTION A -A
THE MINIMUM DP ELEVATION MAY NOT BE PERMITTED WITHOUT PRIOR
TALL BUL
SCALE: 1"= 2'
ETAIL 0
SCALE: 1"= 5'
FILL BEHIND WALL AND
PROPOSED RECONSTRUCTED LANDSCAPE TO MATCH
BULKHEAD A) (SEE DETAIL A - SURROUNDINGS
12
10
8
6
4
2
0
-2
-4
EXISTING SPLIT -RAIL FENCE
AND R.R TIES (TYP)
PROPOSED BULKHEAD (TYPICAL)
RELOCATE MARSH
(TYPICAL)
EXISTING BULKHEAD TYPICAL
SEAWARD AS NEEDED
1. THE PURPOSE OF THIS PROJECT 6 TO RECONSTRUCT EXISTING FAILING TIMBER
PLANT WITH ADDITIONAL SPARTINA
BULKHEADS. '
f-'-
ALTERNAFLORA ® 12. O.C. AS NEEDED
EXISTINGIGRADE
LICENSE #685. A BEEN FOUND FOR THE EXISTING TALL (EL=11.0'
MAINTAIN EXISTING ELEVATION 'g
NGVD) BULKHEADIMENT DMRBANCE THE PROPOSED VINYL
gomw
OF SPARTINA ALTERNAFLORA ,
-
EXISTING�GRADE
EXISTING' +BULKHEAD (HEIGHT
VARIES FROM 2.4 TO 11.0')
PROPOSED 12"0 FIBER ROLL
3. SUPPLY MATERIA, EQUIPMENT AND LABOR TO INSTALL THE PROPOSEDWORK ALONG
THE SHOREFRONT AS DESCRIBED AND SHOWN ON THE PLAN AND DETAILS.
TIMBER PILE NOTES
4. PERFORMANCE OF THE WORK SHALL BE IN COMPLIANCE WITH THE PLANS,
' 1-V N
SPECIFICATIONS, AND ORDER OF CONDITIONS ISSLED BY THE YARMOUTH CONSERVATION
MHW-1.8
1/6" STAINLESS STEEL WIRE ROPE FASTENED
2. EACH PILE SHALL BE DRIVEN BY MECHANICAL MEANS, IN ONE PIECE,
ML'W_� 1�1
AT EYE OF ANCHOR TO BE TIGHTLY LACED
A WORKING BARGE WORKING BARGE NOT TO BE LOCATED OVER MARSH AT ANY TIME
SECTION A -A OR REFUSAL ENGINEER SHALL BE NOTIFIED IF REQUIRED DEPTH
THRU WEBBING OF FIBER ROLLS.
CAN NOT BE ATTAINED.
60" DUCKBILL D866 ANCHORS
EXISTINGI
THREE FEET O.C. - ANCHORS TO _ EXISTING GRADE
3. DURING THE PILE DRIVING OPERATION, ANY SUDDEN DECREASE IN DRIVING
BE INSTALLED FLUSH TO GROUND.
RESISTANCE SHALL BE INVESTIGATED WITH REGARD TO THE POSSIBILITY OF
EXISTING MARSH (VARIES)
BREAKAGE OF THE PILE, AND IF SUCH SUDDEN DECREASE M DRIVING
MARSH EXTENSION/MITIGATION
DETAIL
SCALE: 1"= 5'
FILL BEHIND WALL AND
PROPOSED RECONSTRUCTED LANDSCAPE TO MATCH
BULKHEAD A) (SEE DETAIL A - SURROUNDINGS
12
10
8
6
4
2
0
-2
-4
EXISTING SPLIT -RAIL FENCE
AND R.R TIES (TYP)
0 10 20 30 40 50
SECTION B -B
SCALE- 1"= 10'
11.0 100 YR. TIDAL FLOOD
3.3 22 ANNUAL HIGH TIDE
2.9 1.8 MEAN HIGH WATER
1.5 0.4 MEAN TIDE LEVEL
1.1 0.0 NATIONAL GEODETIC VERTICAL DATUM (NGVD)
0.0 -1.1 MEAN LOW WATER
NANTUCKET SOUND
TIDAL FLOOD PROFILE
REF: A.C.O.E. TIDAL FLOOD SURVEY, SEPT. 1988 PLATE C-23 PROFILE 9
M28U MASS GEODETEC STATION ELEVATION 15.17 NGVD; 15.17= 16.97 MLW
ELEVATIONS SHOWN ARE MEASURED IN FEET AND TENTHS PLUS OR
MINUS FROM THE PLANE OF MEAN LOW WATER E_=0.0'
ARMY CORPS TIDAL PROFILE
SCALE: 1"= 5'
4-3/4"9 THRU BOLTS W/ DOCK
WACUCD n UTAI C CUIDI •D
6"
SHIPLAP DETAIL
SCALE: 1"= 10'
GENERAL NOTES:
EXISTING
U
1. THE PURPOSE OF THIS PROJECT 6 TO RECONSTRUCT EXISTING FAILING TIMBER
BULKHEAD
BULKHEADS. '
2. THE EXISTING NGVD) TIMBER BULKHEAD IS PERMITTED UNDER DEP
EXISTINGIGRADE
LICENSE #685. A BEEN FOUND FOR THE EXISTING TALL (EL=11.0'
NGVD) BULKHEADIMENT DMRBANCE THE PROPOSED VINYL
gomw
BULKHEADS WILL DIRECTLY SEAWARD OF THE EXISTING TIMBER
-
EXISTING�GRADE
EXISTING' +BULKHEAD (HEIGHT
VARIES FROM 2.4 TO 11.0')
MHW ! 8 NGVDI
3. SUPPLY MATERIA, EQUIPMENT AND LABOR TO INSTALL THE PROPOSEDWORK ALONG
THE SHOREFRONT AS DESCRIBED AND SHOWN ON THE PLAN AND DETAILS.
TIMBER PILE NOTES
4. PERFORMANCE OF THE WORK SHALL BE IN COMPLIANCE WITH THE PLANS,
' 1-V N
SPECIFICATIONS, AND ORDER OF CONDITIONS ISSLED BY THE YARMOUTH CONSERVATION
MHW-1.8
COMMISSION FOR THE REFERENCED PROJECT AND AS DESCRIBED BELOW.
2. EACH PILE SHALL BE DRIVEN BY MECHANICAL MEANS, IN ONE PIECE,
ML'W_� 1�1
..........
A WORKING BARGE WORKING BARGE NOT TO BE LOCATED OVER MARSH AT ANY TIME
SECTION A -A OR REFUSAL ENGINEER SHALL BE NOTIFIED IF REQUIRED DEPTH
STAGING AREA FOR MATERIALS TO BE IN DRIVEWAY OR ON BARGE
CAN NOT BE ATTAINED.
EXISTINGI
DE
3. DURING THE PILE DRIVING OPERATION, ANY SUDDEN DECREASE IN DRIVING
0 10 20 30 40 50
SECTION B -B
SCALE- 1"= 10'
11.0 100 YR. TIDAL FLOOD
3.3 22 ANNUAL HIGH TIDE
2.9 1.8 MEAN HIGH WATER
1.5 0.4 MEAN TIDE LEVEL
1.1 0.0 NATIONAL GEODETIC VERTICAL DATUM (NGVD)
0.0 -1.1 MEAN LOW WATER
NANTUCKET SOUND
TIDAL FLOOD PROFILE
REF: A.C.O.E. TIDAL FLOOD SURVEY, SEPT. 1988 PLATE C-23 PROFILE 9
M28U MASS GEODETEC STATION ELEVATION 15.17 NGVD; 15.17= 16.97 MLW
ELEVATIONS SHOWN ARE MEASURED IN FEET AND TENTHS PLUS OR
MINUS FROM THE PLANE OF MEAN LOW WATER E_=0.0'
ARMY CORPS TIDAL PROFILE
SCALE: 1"= 5'
4-3/4"9 THRU BOLTS W/ DOCK
WACUCD n UTAI C CUIDI •D
6"
SHIPLAP DETAIL
SCALE: 1"= 10'
SHOREGUARD 95D
VINYL SHEETING, 1
FEET LONG
1
NEW BULKHEAD
EXISTING TIMBER BULKHEAD
0
3/4' THRU BOLT ® 2' O.C. FOR
ANCHOR WALE (COUNTERSUNK)
61t 4'X 6' GREENHEART
W
ANCHOR WALE
3't
I F
II II
if i
I. ii • II 3• ? 1q
II II'..a If i
iL-
II a• •Q'. n. II �. • VOIDS
II • •:< , • ° CEMEN11
If
EXISTING TIN i
CUT OFF BEI
INSTALL NEW DEADMAN ANCHOR EXISTING TIMBER i \
I SYSTEM ®(6't) O.C., CAPACITY II
SHALL BE 10 KIPS MINIMUM. II EXISTING TIMBER SHEETING; �l
II CUT OFF BELOW GRADE
SECTION C -C PLAN VIEW DETAIL /\
12
10
8
6
4
2
0
-2
-4
SCALE: 1"= 2'
LAND SUBJECT
TO COASTAL
LAND UNDER OCEAN MHW STORM FLOWAGE BUFFER ZONE
MLW TOP OF
COASTAL BANK
PROPOSWtRECONSTt2UCTED
GENERAL NOTES:
EXISTING
U
1. THE PURPOSE OF THIS PROJECT 6 TO RECONSTRUCT EXISTING FAILING TIMBER
BULKHEAD
BULKHEADS. '
2. THE EXISTING NGVD) TIMBER BULKHEAD IS PERMITTED UNDER DEP
EXISTINGIGRADE
LICENSE #685. A BEEN FOUND FOR THE EXISTING TALL (EL=11.0'
NGVD) BULKHEADIMENT DMRBANCE THE PROPOSED VINYL
gomw
BULKHEADS WILL DIRECTLY SEAWARD OF THE EXISTING TIMBER
BULKHEADS.
MHW ! 8 NGVDI
3. SUPPLY MATERIA, EQUIPMENT AND LABOR TO INSTALL THE PROPOSEDWORK ALONG
THE SHOREFRONT AS DESCRIBED AND SHOWN ON THE PLAN AND DETAILS.
TIMBER PILE NOTES
4. PERFORMANCE OF THE WORK SHALL BE IN COMPLIANCE WITH THE PLANS,
' 1-V N
SPECIFICATIONS, AND ORDER OF CONDITIONS ISSLED BY THE YARMOUTH CONSERVATION
1. ALL TIMBER PILES SHALL BE CCA OR GREENHEART.
COMMISSION FOR THE REFERENCED PROJECT AND AS DESCRIBED BELOW.
2. EACH PILE SHALL BE DRIVEN BY MECHANICAL MEANS, IN ONE PIECE,
5. ACCESS TO BE BOTH FROM THE UPLAND OF THE APPLICANT'S PROPERTY, AND FROM
WITHOUT SPLICING, AND SHALL BE DRIVEN TO THE DEPTHS SPECIFIED IN
A WORKING BARGE WORKING BARGE NOT TO BE LOCATED OVER MARSH AT ANY TIME
SECTION A -A OR REFUSAL ENGINEER SHALL BE NOTIFIED IF REQUIRED DEPTH
STAGING AREA FOR MATERIALS TO BE IN DRIVEWAY OR ON BARGE
CAN NOT BE ATTAINED.
6. METAL TO BE HOT DIPPED GALVANIZED AFTER FABRICATION.
3. DURING THE PILE DRIVING OPERATION, ANY SUDDEN DECREASE IN DRIVING
RESISTANCE SHALL BE INVESTIGATED WITH REGARD TO THE POSSIBILITY OF
7. ALL TIMBER (EXCEPT ANCHOR WALES) SHALL BE MARINE GRADE SOUTHERN PINE 12
BREAKAGE OF THE PILE, AND IF SUCH SUDDEN DECREASE M DRIVING
OR BETTER. TREATED WITH CCA PRESERVATIVES W/2.5 PCF MINIMUM RETENTION IN
RESISTANCE CANNOT BE CORRELATED TO BORING DATA, AND IF THE PILE
ACCORDANCE WITH THE AMERICAN WOOD PRESERVERS ASSOCIATION (AWPA)
CANNOT BE REMOVED FOR INSPECTION, IT SHALL BE CONSIDERED ADEQUATE
STANDARDS C-2 AND C-18. MATERIAL FOR ANCHOR WALES TO BE GREENHEART.
REASON FOR THE REJECTION OF THE PIE
8. ALL PILES AND TIMBER IN CONTACT WITH GROUND TO BE GREENHEART OR CCA
4. JETTING, AUGURING AND OTHER METHODS OF PRE -EXCAVATION TO ACHIEVE
PRESSURE TREATED A, APPROVED BY ENGINEER.
THE MINIMUM DP ELEVATION MAY NOT BE PERMITTED WITHOUT PRIOR
-
APPROVAL BY THE ENGINEER. WHERE PERMITTED, THE PRE -EXCAVATION MUST
9. SHEETING MATERIAL SHALL BE SHOREGUARD 950 VINYL MINIMUM SHEETING LENGTH
BE CARRIED OUT IN A MANNER WHICH WILL NOT IMPAIR THE CARRYING
SHALL. BE 16' FOR TIE SHORT WALL, AND 20' FOR THE TALL WALL
CAPACITY OF THE PILES ALREADY IN PLACE IMMEDIATELY AFTER COMPLETION
OF JETTING OR AUGURING, THE PILE SHALL BE ADVANCED TO THE MAXIMUM
10. FILTER FABRIC STALL BE MI FW400, OR AS APPROVED BY ENGINEER.
DEPTH OF PRE -EXCAVATION AND DRIVEN BELOW THIS DEPTH TO THE REQUIRED
DEPTH SPECIFIED HERON.
11. FILL VOIDS BETkN EXISTING WALL AND NEW SHEETING WITH FLOWA13LE
CEMENIIITJOUS FILL
5. THE PILE DRIVING CONTRACTOR SHALL KEEP AND SUBMIT A PILE DRIVING
LOG FOR EACH PILE.
12. THE EXISTING ANCHOR SYSTEM FOR BOTH WALLS SHALL BE REPLACED. FOR THE
TALL WALL, INSTALL dEW HELICAL ANCHORS A MINIMUM OF 25 FEET BEHIND THE
ORIGINAL BULKHEAD, WITH A MINIMUM CAPACITY OF 20 KIPS EACH. FOR THE SHORT
SPECIAL REQUIREMENTS FDR COASTAL CONSTRUCTION
WALL, INSTALL CCA DEADMAN PILES PLACED 20 -FEET MINIMUM BEHIND WALL WITH A 10
KIP MINIMUM CAPACITY. ENGINEER SHALL BE NOTIFIED IMMEDIATELY IF MINIMUM DESIGN
1. SPECIAL PROVISIONS FOR COASTAL CONSTRUCTION SHALL BE IN
SPECIFICATIONS CAN NOT BE ATTAINED.
ACCORDANCE WITH THE RECOMMENDATIONS FOUND IN THE 'COASTAL
CONSTRUCTION MANUAL' AS PUBLISHED BY THE FEDERAL EMERGENCY
13. THE EXISTING MNRSH FRONTING AREAS OF THE BULKHEAD IS TO BE EXTENDED
MANAGEMENT AGENCY (FEMA -55).
DIRECTLY SEAWARD OF THE NEW BULKHEAD. WHERE ANY MARSH IS DAMAGED DURING
THIS OPERATION, THE EQUIVALENT AREA IS TO BE RESTORED. SEE MITIGATION DETAIL
2. ALL STEEL MEMBERS, CONNECTIONS, CONNECTORS, ETC. SHALL BE HOT
FOR MARSH PROTECTION.
DIPPED GALVANIZED. ALL METAL CONNECTORS MUST BE ROUTINELY INSPECTED
AND MAINTAINED OVER THE SERVICEABLE LIFE OF THE STRUCTURE.
14. CONSTRUCTION DETAILS TO BE APPROVED BY ENGINEER PRIOR TO CONSTRUCTION.
3. ALL EXTERIOR EXPOSED LUMBER USED FOR STRUCTURAL FRAMING, STAIRS,
15. DISTURBED AREAS TO BE REVEGETATED TO MATCH PRE -CONSTRUCTION CONDITIONS.
RAILING, ETC. SHALL BE CCA PRESSURE TREATED OR APPROVED EQUAL
16. CONTRACTOR TO VERIFY ALL DIMENSIONS IN THE FIELD AND NOTIFY ENGINEER OF
ANY DESCREPANCIES PRIOR TO CON N.
17. PLOWABLE FILL SHN1 BE 500 PSI, NON-IXCAVATABLE FILL CONTRACTOR SHALL
SUBMIT MIX DESIGN TO ENGINEER FOR APPROVAL PRIOR TO PLACEMEN.
SHOREGUARD 95D
VINYL SHEETING, 1
FEET LONG
1
NEW BULKHEAD
EXISTING TIMBER BULKHEAD
0
3/4' THRU BOLT ® 2' O.C. FOR
ANCHOR WALE (COUNTERSUNK)
61t 4'X 6' GREENHEART
W
ANCHOR WALE
3't
I F
II II
if i
I. ii • II 3• ? 1q
II II'..a If i
iL-
II a• •Q'. n. II �. • VOIDS
II • •:< , • ° CEMEN11
If
EXISTING TIN i
CUT OFF BEI
INSTALL NEW DEADMAN ANCHOR EXISTING TIMBER i \
I SYSTEM ®(6't) O.C., CAPACITY II
SHALL BE 10 KIPS MINIMUM. II EXISTING TIMBER SHEETING; �l
II CUT OFF BELOW GRADE
SECTION C -C PLAN VIEW DETAIL /\
12
10
8
6
4
2
0
-2
-4
SCALE: 1"= 2'
LAND SUBJECT
TO COASTAL
LAND UNDER OCEAN MHW STORM FLOWAGE BUFFER ZONE
MLW TOP OF
COASTAL BANK
PROPOSWtRECONSTt2UCTED
EXISTING
TIMBER
EXISTING j
BULKHEAD
(SEE D
EXISTINGIGRADE
CAT
_
MHW ! 8 NGVDI
' 1-V N
..
0 10 EXISTING GRADE 20 :1 30 40
ti
SECTION C- C
SCALE: 1"= 10'
EXISTING RIP -RAP, SLOPE VARIES
EXISTING FAILED BULKHEAD;
ELEVATON VARIES
PROPOSED P.T. TIMBER CAP
WITH 3 -INCH DIMENSIONAL
LUMBER; T.O.W. = 2.4'1 NGVD it
MHW
PROPOSED 4"x 6' GREENHEART
ANCHOR WALE (i ONLY)
e
MLW....................... `"
EXISTING GRADES
USED 16' LONG
SHEETING, SEE
MINIMUM EMBEDMENT SHALL BE
10; CONTACT ENGINEER IF
EMBEMENT CAN NOT BE REACHE
ING TIMBER
EXISTING GRADE
FALL NEW DEADMAN TIE -BACK SY
FEET MIMIMUM BEHIND OLD WALL;
EXISTING TIMBER SHEETING AND PILES TO REMAIN
0
N
CTION C -C BULKHEAD (TOEWALL) DETAIL 1A
ISSUED FOR CONSTRUCTION s
OASTAL
NGMEWNG
Owmy INC.
260 Cranberry ff v nd-ms, MA 02653
i` y5.6700
i
i
I
+
f O
cn
s
O
1 i v U