Loading...
HomeMy WebLinkAbout83-1742v o�rop�o� Oc�o W y O7U ry>m0 = L Nm Fl¢fcpm 3"'pV m OU.1 � z>Z �z3cmofO c,: a yQLLp ,: ucc+�c mFo.op� �@ U [7�G Clam m'mm: �'a =.J3¢ GOEm Q� 0 mL OLONm a—«m wo O�Cm Cp >E 50 0C N/F ROBERT AND ANN CHILDS MAP 34 PARCEL 295 ESTATE OF MARY F. CLINE C/O DANIEL J. FRANCHI, EXECUTOR MAP 34 PARCEL 296 0 z ) .CL I ACCESS ! I BENCHMARK: ! , TOP OF RODCAP ELEV=9.34 (NGVD) I ! b ,oma I I r I N/F JAMES AND CONSTANCE RUHAN MAP 34 PARCEL 297 PLAN SCALE: 1'= 20' �Ii� .. ' II ..��/F.�!I,�� ,vim RUGOSA ft / to ids' a S _ J! TIMBER , o STEPS �A i r_ - I o M; ��I 4 a ze I 10 I GROINS 1 inch — 20 fL TOP OF BANK LMA SUB ECT M COASTAL STORM FLOWAGE _ I _ EXISTING CONCRETE SEAWALL -` 10 20 SECTION A -A SCALE 1'= 5' MHW= 1.8 MLW= -1.1 30 PLAN REFERENCES: ASSESSORS MAP 34, PARCEL 296 PLAN BOOK 191, PAGE 15 LAND COURT PLAN 9236 B LAND COURT PLAN 9190 F LAND COURT PLAN 13236 A FLOOD ES A11 1'1) AND V13(EL.13) AS SHOWN ON FEMA FlRM PANEL #250015 0006 D REVISED JULY 2. 1992. DATUM NOTE: ELEVATIONS SHOWN HEREON ARE BASED ON THE NATIONAL GEODETIC VERTICAL DATUM (NGVD) NOTES: 1. THE PURPOSE OF THIS PROJECT IS TO REPAIR AN EXISTING CONCRETE SEAWALL BY REINFORCING THE TOE OF THE WALL AGAINST EROSION. 2. SUPPLY ALL MATERIAL. EQUIPMENT AND LABOR FOR REPAIRS M THE SEAWALL AS DESCRIED AND SHOWN ON THE PLAN AND DETAILS. 3. PERFORMANCE OF THE WORK SHALL. BE IN COMPLIANCE WITH THE PIAN AND DETAILS. AND ORDER OF CONDITIONS ISSUED BY THE YARMOUTH OMSERVA71ON COMMISSION FOR THE REFERENCED PROJECT AND AS DESCRIBED BELOW. 4. ACCESS TO BE FROM UPLAND ON THE OWNER'S PROPERTY. STAGING AREA FOR MATERIALS TO BE IN DRIVEWAY. 5. SHEEIING FOR FOOTING REINFORCEMENET Stall BE EITHER C -LOC QM (VINYL), ENDURANCE 'ECLIPSE'. OR GEDGARD 30 (COMPOSITE). 6 FEET LANG. AND BE DRIVEN SO THAT TOP OF SHEETING 6 APPROXIMATELY 2 1/2 FEET ABOVE THE WALL FOOTING AS SHOWN ON THE DEFAIL 6. THE VOID BETWEEN THE SHEETING AND THE CONCRETE FOOTING SHALL BE FLUID WITH 4.000 PSI CONCRETE SUITABLE FOR SALT WATER IMERSION. CONTRACTOR TO SUPPLY MIX DESIGN FOR APPROVAL PRIOR M POUR. 7. TIMBER ACCESS STAIRS Tn BE REMONFD AND REINSTALLED AFTER CONSIRUMON 6 COMPLETE. S. UPON COMPLETION, ALL DISTURBED AREAS TO BE RETURNED M THEIR PRE -CONSTRUCTION CONDITIONS. EXIST. GRADE EXIST. CONC. SEAWALL TO REMAIN FILL VOID W/CONCRETE a.. < SECTION A -A DETAIL SCALE: 1'= 2' ALUMINUM CAP, T.O.W. = 2.5'f NGVD TAKMOUIH, MA KEY MAP NO SCALE LEGEND IN BOUND O IRON PIPE --10-- CONTOUR EXIST. GRADE (VARIES) INSTALL 6' LONG VINYL OR COMPOSITE SHEETING (4' MINIMUM EMBEDMENT) OASTAL 4t NGINEERING ►d" a ►\1► Cranberry Hwy. Orleans, MA 026531 255.6511 Fax: 508.255.6700 Ell i. 2 1 h A zz W Q rq w rO w F -Li a ry rn SCALE AS NOTED DRAWINGFHX C16605.dwg DATE 1-17-06 DRAWN BY MJ/MCB ,�RiIV:R►7:)� S 6 0 w I OF I SHEETS PROJECT NO. C166D$.DU U N/F ROBERT AND ANN CHILDS MAP 34 PARCEL 295 �f _1 ESTATE OF MARY F. CLINE C/O DANIEL J. FRANCHI, EXECUTOR MAP 34 PARCEL 296 E N/F JAMES AND CONSTANCE RUHAN MAP 34 PARCEL 297 PLAN SCALE: 10= 20' t / 4//� vi / ROSA RUGOSA +I / � l 1 o � z S _. ACCESS / I O r BENCH 1,. TOP F�CAP I / r ELEV=9.34 (NGw) I / N/F JAMES AND CONSTANCE RUHAN MAP 34 PARCEL 297 PLAN SCALE: 10= 20' t / 4//� vi V o ' TIMBERSTEPS =_I ; _. ACCESS / I O r BENCH 1,. TOP F�CAP I / ELEV=9.34 (NGw) I / C�' H O L' I / I N/F JAMES AND CONSTANCE RUHAN MAP 34 PARCEL 297 PLAN SCALE: 10= 20' t /;6 ''; a an 1 inch = 20 fL TOP OF BANK LAND SUBJECT TO COASTAL S70RM FLOWAGE EXISTING CONCRETE SEAWALL 6. 6 4 2 0 -2 EXISTING 0 IA ZONE MHW= 1.8 -IIIIr^(1 EXISTING GRADE - 1............... MLW= -1.1 10 20 30 SECTION A -A SCALE: 1'= 5' �0 E3w m PLAN REFERENCES: ASSESSORS MAP 34, PARCEL 296 PLAN BOOK 191, PAGE 15 LAND COURT PLAN 9236 B LAND COURT PLAN 9190 F LAND COURT PLAN 13236 A FLOOD NOTE: FLOOD ZONES Aii(EI-11) AND VI3(EL.13) AS SHOWN ON FEMA FIRM PANEL 1250015 0006 D REVISED JULY 2, 1992. DATUM NOTE: ELEVATIONS MOWN HEREON ARE BASED ON THE NATIONAL GEODETIC VERTICAL DATUM (NGw) NOTES 1. THE PURPOSE OF THIS PROJECT IS M REPAIR AN EXISTING CONCRETE SEAWALL BY REINFORCING THE TOE OF THE WALL AGAINST EROSION. 2. SUPPLY ALL MATERIAL. EOUIPMENr AND LABOR FOR REPAIRS TO THE SEAWALL AS DESCRIBED AND SHOWN ON THE PLAN AND DETAILS. 3. PEf"C11At>CE OF THE WORK SWILL BE M CDMPUANCE WITH THE PLAN AND DETAILS, AND ORDER OF COHMM ISSUED BY THE YARMOUOI CONSERVATION COMMISSION FOR THE REFERENCED PRDJECr AND AS DESCRIBED BELOW. 4. ACCESS TO BE FROM UPIAHD ON THE OWNER'S PROPERLY. STAGING MFA FOR VA78Z S TO BE IN DRNEWAY. 5. SHEETING FOR FOOTING REINFOR U04ET SHALL BE EITHER C -LOC CL9000 DPo N So �T �NG 6 1OCEOM OL1A 2211/2 FE TALONG. THE WALL FOOTING AS SFIDWN ON THE DETAIL 6. THE VOID BEr*m THE SfErI NG AND THE CONCRETE FOOTING SWUl BE FILLED WH 4,000 PS CONCRETE SUITABLE FOR SALT WATER IMTRSION. CONTRACTOR TO SUPPLY M0( DESIGN FOR APPROVAL PRIOR TO POUR. 7. TIMBER ALS bDVRS'TO BE-R5f0VD-AND REINSTALLED AFTER CONSTRUCTION 6 COMPLETE B. UPON COMPLETION, ALL DISTURBED MEAS M BE RETURNED M THEIR PRE -CONSTRUCTION CONDRIOF6. EXIST. GRADE EXIST. CONC. r SEAWALL TO REMAIN rynn.�- KEY MAP NO SCALE JoinmW Irl, mn LEGEND ■ BOUND O IRON PIPE - -10- - CONTOUR N r c W q Q no ad � W S n. u [ALUMINUM CAP; T.O.W. = 2.5't NGVD 3� e FILL VOID W/CONCRETE Q <y I EXIST. GRADE (VARIES) INSTALL 6' LONG VINYL OR COMPOSITE SHEETING (4' MINIMUM EMBEDMENT) SECTION A -A DETAIL SCALE: 1'= 2' SJ OASTAL f OMPANY, INC. Cranberry Hwy. Orleans, MA 02653 255.6511 Fax: 508.255.6700 ro C °z / / I W V o ' TIMBERSTEPS O r W C�' H O L' rn W U I ' I a N rn SCALE AS NOTED r i STONE GROINS /;6 ''; a an 1 inch = 20 fL TOP OF BANK LAND SUBJECT TO COASTAL S70RM FLOWAGE EXISTING CONCRETE SEAWALL 6. 6 4 2 0 -2 EXISTING 0 IA ZONE MHW= 1.8 -IIIIr^(1 EXISTING GRADE - 1............... MLW= -1.1 10 20 30 SECTION A -A SCALE: 1'= 5' �0 E3w m PLAN REFERENCES: ASSESSORS MAP 34, PARCEL 296 PLAN BOOK 191, PAGE 15 LAND COURT PLAN 9236 B LAND COURT PLAN 9190 F LAND COURT PLAN 13236 A FLOOD NOTE: FLOOD ZONES Aii(EI-11) AND VI3(EL.13) AS SHOWN ON FEMA FIRM PANEL 1250015 0006 D REVISED JULY 2, 1992. DATUM NOTE: ELEVATIONS MOWN HEREON ARE BASED ON THE NATIONAL GEODETIC VERTICAL DATUM (NGw) NOTES 1. THE PURPOSE OF THIS PROJECT IS M REPAIR AN EXISTING CONCRETE SEAWALL BY REINFORCING THE TOE OF THE WALL AGAINST EROSION. 2. SUPPLY ALL MATERIAL. EOUIPMENr AND LABOR FOR REPAIRS TO THE SEAWALL AS DESCRIBED AND SHOWN ON THE PLAN AND DETAILS. 3. PEf"C11At>CE OF THE WORK SWILL BE M CDMPUANCE WITH THE PLAN AND DETAILS, AND ORDER OF COHMM ISSUED BY THE YARMOUOI CONSERVATION COMMISSION FOR THE REFERENCED PRDJECr AND AS DESCRIBED BELOW. 4. ACCESS TO BE FROM UPIAHD ON THE OWNER'S PROPERLY. STAGING MFA FOR VA78Z S TO BE IN DRNEWAY. 5. SHEETING FOR FOOTING REINFOR U04ET SHALL BE EITHER C -LOC CL9000 DPo N So �T �NG 6 1OCEOM OL1A 2211/2 FE TALONG. THE WALL FOOTING AS SFIDWN ON THE DETAIL 6. THE VOID BEr*m THE SfErI NG AND THE CONCRETE FOOTING SWUl BE FILLED WH 4,000 PS CONCRETE SUITABLE FOR SALT WATER IMTRSION. CONTRACTOR TO SUPPLY M0( DESIGN FOR APPROVAL PRIOR TO POUR. 7. TIMBER ALS bDVRS'TO BE-R5f0VD-AND REINSTALLED AFTER CONSTRUCTION 6 COMPLETE B. UPON COMPLETION, ALL DISTURBED MEAS M BE RETURNED M THEIR PRE -CONSTRUCTION CONDRIOF6. EXIST. GRADE EXIST. CONC. r SEAWALL TO REMAIN rynn.�- KEY MAP NO SCALE JoinmW Irl, mn LEGEND ■ BOUND O IRON PIPE - -10- - CONTOUR N r c W q Q no ad � W S n. u [ALUMINUM CAP; T.O.W. = 2.5't NGVD 3� e FILL VOID W/CONCRETE Q <y I EXIST. GRADE (VARIES) INSTALL 6' LONG VINYL OR COMPOSITE SHEETING (4' MINIMUM EMBEDMENT) SECTION A -A DETAIL SCALE: 1'= 2' SJ OASTAL f OMPANY, INC. Cranberry Hwy. Orleans, MA 02653 255.6511 Fax: 508.255.6700 ro C °z b N DRAWING FILE C16605.dwg DATE 1-17-06 DRAWN BY M7/MCB OF 1 SHEETS TNO. C16605.00 V W C�' H O L' rn W U a N rn SCALE AS NOTED b N DRAWING FILE C16605.dwg DATE 1-17-06 DRAWN BY M7/MCB OF 1 SHEETS TNO. C16605.00